Live road closures & traffic incidents
Stuck in traffic? Check whether the road you are on is closed right now. Live accident and emergency closures from National Highways and Traffic Wales are listed first, followed by roadworks in force and closures starting in the next 48 hours.
Live incidents
1
Accidents and emergency closures right now
Active roadworks
57
Works and lane closures currently in force
Starting soon
252
Closures planned in the next 48 hours
Cleared today
130
Closures resolved in the past 24 hours
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
310 live and upcoming closures
Live incident closures are listed first, followed by roadworks currently in force, then closures starting in the next 48 hours. Zoom the map or filter the list to focus on a specific region or corridor.
Live incident closures
A44 : Both directions : Aberystwyth to Llanbadarn Fawr : Closed Due to Burst Water Main : Local diversions in place
Active Incident Traffic WalesDescription: A44 : Both directions : Aberystwyth to Llanbadarn Fawr : Closed Due to Burst Water Main : Local diversions in place, Start time: 16/08/2026 17:15 , Expected end time: 17/08/2026 17:14, Severity: Road closure, Source: Welsh Government, Last updated: 16/08/2026 17:15
Roadworks in force now
M4 Westbound Jct 4B to M25 Anti-clockwise Jct 15 Link road Lane 1,2 closure
Active Roadworks National HighwaysExpected to clear in 15 minutes 51 seconds
M4 Westbound Jct 4B to M25 Anti-clockwise Jct 15 Link road Lane 1,2 closure
A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m
Active Roadworks National HighwaysExpected to clear in 15 minutes 51 seconds
A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m
A3 Northbound Wisley carriageway closure between the exit and entry slip road and A3 Northbound Painshill to Esher carriageway closure
Active Roadworks National HighwaysExpected to clear in 15 minutes 51 seconds
A3 Northbound Wisley carriageway closure between the exit and entry slip road and A3 Northbound Painshill to Esher carriageway closure
M40 Northbound, Jct 10, Exit slip road closure.
Planned Roadworks National HighwaysExpected to clear in 45 minutes 51 seconds
M40 Northbound, Jct 10, Exit slip road closure.
M5 northbound Jct 11a entry slip road closed
Active Roadworks National HighwaysExpected to clear in 45 minutes 51 seconds
M5 northbound Jct 11a entry slip road closed
M62 Eastbound Lanes 3 and 4 closure (MP 34/0 to 38/5)
Planned Roadworks National HighwaysExpected to clear in 45 minutes 51 seconds
M62 Eastbound Lanes 3 and 4 closure (MP 34/0 to 38/5)
M1 southbound Jct 37 to Jct 36 lane 1 and 2 closure ( 274/6 273/7)
Planned Roadworks National HighwaysExpected to clear in 45 minutes 51 seconds
M1 southbound Jct 37 to Jct 36 lane 1 and 2 closure ( 274/6 273/7)
M40 Southbound Jct 8 to Jct 7 hard shoulder closure
Planned Roadworks National HighwaysExpected to clear in 1 day 18 hours
M40 Southbound Jct 8 to Jct 7 hard shoulder closure
M40 Southbound, Jct 7 to Jct 6, hard shoulder closure.
Planned Roadworks National HighwaysExpected to clear in 2 days 18 hours
M40 Southbound, Jct 7 to Jct 6, hard shoulder closure.
A66 Eastbound and Westbound Ramsay brow Carriageway closure
Planned Roadworks National HighwaysExpected to clear in 45 minutes 51 seconds
A66 Eastbound and Westbound Ramsay brow Carriageway closure
A628 eastbound Tintwistle Layby closure
Planned Roadworks National HighwaysExpected to clear in 1 hour 45 minutes
A628 eastbound Tintwistle Layby closure
M40 Southbound Jct 5 to Jct 4 hardshoulder closure
Active Roadworks National HighwaysExpected to clear in 18 hours 44 minutes
M40 Southbound Jct 5 to Jct 4 hardshoulder closure
Contra flow westbound with eastbound closed from Horseshoe Drive
Active Roadworks National HighwaysExpected to clear in 4 months 2 weeks
contra flow westbound with eastbound closed from Horseshoe Drive
A500 both directions Campbell Road over bridge carriageway closure
Active Roadworks National HighwaysExpected to clear in 4 months 4 weeks
A500 both directions Campbell Road over bridge carriageway closure
A4 both directions lane closures
Planned Roadworks National HighwaysExpected to clear in 1 month 4 weeks
A4 both directions lane closures
M1 northbound Jct 10 to Jct 11 hard shoulder closure (MP 49/4 to 49/6)
Active Roadworks National HighwaysExpected to clear in 2 months 6 days
M1 northbound Jct 10 to Jct 11 hard shoulder closure (MP 49/4 to 49/6)
M6 Southbound Jct 41 entry slip road Lane 1 closure
Active Roadworks National HighwaysExpected to clear in 4 years 4 months
M6 Southbound Jct 41 entry slip road Lane 1 closure
M6 Northbound Jct 39 entry slip road Lane 1 closure
Planned Roadworks National HighwaysExpected to clear in 4 years 4 months
M6 Northbound Jct 39 entry slip road Lane 1 closure
A66 Eastbound Flusco to Stainton Layby closure
Planned Roadworks National HighwaysExpected to clear in 4 years 4 months
A66 Eastbound Flusco to Stainton Layby closure
A45 clockwise M42 Jct 6 (Bickenhill Interchange) partial roundabout closure (from the M42 northbound entry slip to the M42 southbound exit slip)
Active Roadworks National HighwaysExpected to clear in 4 months 2 weeks
A45 clockwise M42 Jct 6 (Bickenhill Interchange) partial roundabout closure (from the M42 northbound entry slip to the M42 southbound exit slip)
Lane 1 closure northbound (closing ERA)
Active Roadworks National HighwaysExpected to clear in 4 months 2 weeks
Lane 1 closure northbound (closing ERA)
A36 both directions Windsor Street to St Paul's roundabout temporary pedestrian crossing
Planned Roadworks National HighwaysExpected to clear in 9 hours 45 minutes
A36 both directions Windsor Street to St Paul's roundabout temporary pedestrian crossing
A38 southbound Hilliard's Cross entry slip road closure
Active Roadworks National HighwaysExpected to clear in 8 months 1 week
A38 southbound Hilliard's Cross entry slip road closure
M60 Anticlockwise Jct 25 entry slip road hardshoulder closure
Active Roadworks National HighwaysExpected to clear in 3 months 2 weeks
M60 Anticlockwise Jct 25 entry slip road hardshoulder closure
Turn live incidents into proactive action
Exported reports combine live incident feeds with STATS19 history, hotspot analysis and tailored commentary. Ideal for fleet managers, local authorities and consultancies responding to network disruption.