M53 Southbound hard shoulder closure (MP 33/1 to 33/4)
ActiveM53 Southbound hard shoulder closure (MP 33/1 to 33/4)
- Start time
- Tue, Nov 3, 2026 1:00 PM
- Expected end
- Mon, Nov 30, 2026 5:00 PM
- Duration
- 3 weeks 6 days 4 hours
- Road
- M53 – M53 Southbound Within J10
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Nov 3, 2026 1:27 PM
- Last updated
- Tue, Nov 3, 2026 2:47 PM
- Cleared
- Mon, Nov 30, 2026 5:00 PM
- Latest update: M53 Southbound hard shoulder closure (MP 33/1 to 33/4)
- Coordinates
- 53.266699, -2.877379
- Latitude span
- 53.265762 – 53.268674
- Longitude span
- -2.877613 – -2.877258
- Bounding box centre
- 53.267218, -2.877436
- Location descriptions
-
- M53 southbound within J10
- M53 southbound between J9 and J10
- Feed validity status
- Active
- Overall feed start
- Tue, Nov 3, 2026 1:00 PM
- Overall feed end
- Mon, Nov 30, 2026 5:00 PM
- Feed window length
- 3 weeks 6 days 4 hours
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M53 southbound within J10
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M53
- Linear Element Model
- The Network Model
- Linear Element Id
- {3901F196-A7C2-4626-92B1-964BCB748795}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 4 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.265799 -2.877263 53.265762 -2.877258
Segment 2
4 coordinate pairs- Description
- M53 southbound between J9 and J10
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M53
- Linear Element Model
- The Network Model
- Linear Element Id
- {78861D36-8267-4DD5-8529-EBED0F133B2C}
- Linear Element Type
- A Carriageway
- From Distance
- 997 m
- To Distance
- 1,318 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.268674 -2.877613 53.267739 -2.877512 53.266418 -2.877365 53.265799 -2.877263
- Geometry type
- MultiLineString
- Geometry points
- 6
- First coordinate pair
- -2.877263, 53.265799
- Road section segments
- 1
- Road section points
- 6
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.877263,
53.265799
],
[
-2.877258,
53.265762
],
[
-2.877613,
53.268674
],
[
-2.877512,
53.267739
],
[
-2.877365,
53.266418
],
[
-2.877263,
53.265799
]
]
]
}
View road section coordinates
[
[
[
-2.877263,
53.265799
],
[
-2.877258,
53.265762
],
[
-2.877613,
53.268674
],
[
-2.877512,
53.267739
],
[
-2.877365,
53.266418
],
[
-2.877263,
53.265799
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Nov 3, 2026 1:27 PM
- Record versioned
- Tue, Nov 3, 2026 2:47 PM
- Coordinate source
- Geometry
Driving on the M53? See every live closure, roadwork and planned restriction on this road.
M53 live closuresRelated incidents
M53 Southbound Jct 8 exit slip road lane 1 closure
Planned Roadworks National HighwaysStarts in 4 hours 57 minutes
M53 Southbound Jct 8 exit slip road lane 1 closure
M56 Eastbound hardshoulder closure (MP 53/4 to 53/0)
Cleared Roadworks National HighwaysCleared 5 hours 2 minutes ago
M56 Eastbound hardshoulder closure (MP 53/4 to 53/0)
M56 Eastbound hardshoulder closure (MP 53/4 to 53/0)
Cleared Roadworks National HighwaysCleared 3 hours 2 minutes ago
M56 Eastbound hardshoulder closure (MP 53/4 to 53/0)
M53 Southbound lane 2 closure (MP 8/8 to carriageway closure)
Cleared Roadworks National HighwaysCleared 15 hours 2 minutes ago
M53 Southbound lane 2 closure (MP 8/8 to carriageway closure)
M53 Southbound Jct 8 exit slip road lane 1 closure
Cleared Roadworks National HighwaysCleared 12 hours 27 minutes ago
M53 Southbound Jct 8 exit slip road lane 1 closure
M53 Southbound Jct 8 exit slip road lane 1 closure
Cleared Roadworks National HighwaysCleared 17 hours 57 minutes ago
M53 Southbound Jct 8 exit slip road lane 1 closure