M40 southbound Jct 10 to Jct 9 hard shoulder closure
PlannedM40 southbound Jct 10 to Jct 9 hard shoulder closure
- Start time
- Thu, Nov 5, 2026 7:00 AM
- Expected end
- Fri, Nov 6, 2026 11:59 PM
- Duration
- 1 day 16 hours 59 minutes
- Road
- M40 – M40 Southbound Between J10 And J9
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Oct 19, 2026 1:45 PM
- Last updated
- Thu, Nov 5, 2026 3:04 AM
- Cleared
- Fri, Nov 6, 2026 11:59 PM
- Latest update: M40 southbound Jct 10 to Jct 9 hard shoulder closure
- Coordinates
- 51.929522, -1.201794
- Latitude span
- 51.927588 – 51.931831
- Longitude span
- -1.201897 – -1.201707
- Bounding box centre
- 51.929710, -1.201802
- Location descriptions
-
- M40 southbound between J10 and J9
- Feed validity status
- Planned
- Overall feed start
- Thu, Nov 5, 2026 7:00 AM
- Overall feed end
- Fri, Nov 6, 2026 11:59 PM
- Feed window length
- 1 day 16 hours 59 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M40 southbound between J10 and J9
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {3845C451-118E-4BE1-B410-0A748C8AAE64}
- Linear Element Type
- B Carriageway
- From Distance
- 959 m
- To Distance
- 1,302 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.931831 -1.201716 51.931182 -1.201707 51.929816 -1.201774 51.928753 -1.201822
Segment 2
3 coordinate pairs- Description
- M40 southbound between J10 and J9
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {2E13C270-C586-435B-B084-A82D5D315F3F}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 129 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.928753 -1.201822 51.928728 -1.201823 51.927588 -1.201897
- Geometry type
- MultiLineString
- Geometry points
- 7
- First coordinate pair
- -1.201716, 51.931831
- Road section segments
- 1
- Road section points
- 7
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.201716,
51.931831
],
[
-1.201707,
51.931182
],
[
-1.201774,
51.929816
],
[
-1.201822,
51.928753
],
[
-1.201822,
51.928753
],
[
-1.201823,
51.928728
],
[
-1.201897,
51.927588
]
]
]
}
View road section coordinates
[
[
[
-1.201716,
51.931831
],
[
-1.201707,
51.931182
],
[
-1.201774,
51.929816
],
[
-1.201822,
51.928753
],
[
-1.201822,
51.928753
],
[
-1.201823,
51.928728
],
[
-1.201897,
51.927588
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Oct 19, 2026 1:45 PM
- Record versioned
- Thu, Nov 5, 2026 3:04 AM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Southbound, Jct 5 lane 1 closure on entry slip road
Planned Roadworks National HighwaysExpected to clear in 2 hours 33 minutes
M40 Southbound, Jct 5 lane 1 closure on entry slip road
M40 Southbound Jct 5 to Jct 4 lane 2 and 3 closure
Planned Roadworks National HighwaysExpected to clear in 2 hours 33 minutes
M40 Southbound Jct 5 to Jct 4 lane 2 and 3 closure
M40 Jct 9 roundabout lane 1 closure
Planned Roadworks National HighwaysStarts in 18 hours 48 minutes
M40 Jct 9 roundabout lane 1 closure
M40 Southbound, Jct 5 lane 1 closure on entry slip road
Planned Roadworks National HighwaysStarts in 17 hours 33 minutes
M40 Southbound, Jct 5 lane 1 closure on entry slip road
M40 Southbound Jct 5 to Jct 4 hard shoulder, lane 1 and 2 closure
Planned Roadworks National HighwaysStarts in 17 hours 33 minutes
M40 Southbound Jct 5 to Jct 4 hard shoulder, lane 1 and 2 closure
M40 southbound, Jct 11 to Jct 10, hard shoulder, lane 1 and 2 closure
Planned Roadworks National HighwaysStarts in 17 hours 33 minutes
M40 southbound, Jct 11 to Jct 10, hard shoulder, lane 1 and 2 closure