M65 Eastbound Jct 5 exit slip road closure
ClearedM65 Eastbound Jct 5 exit slip road closure
- Start time
- Thu, Jul 16, 2026 8:00 PM
- Expected end
- Fri, Jul 17, 2026 5:00 AM
- Duration
- 3 hours 30 minutes 2 seconds
- Category
- Road Maintenance
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Jul 16, 2026 4:42 AM
- Last updated
- Thu, Jul 16, 2026 11:02 PM
- Cleared
- Thu, Jul 16, 2026 11:30 PM
- Latest update: M65 Eastbound Jct 5 exit slip road closure
- Feed validity status
- Planned
- Overall feed start
- Thu, Jul 16, 2026 8:00 PM
- Overall feed end
- Fri, Jul 17, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Jul 16, 2026 4:42 AM
- Record versioned
- Thu, Jul 16, 2026 11:02 PM
Related incidents
A5036 Eastbound lane 1 closure (Copy Lane to Switch Island)
Active Roadworks National HighwaysExpected to clear in 6 hours 23 minutes
A5036 Eastbound lane 1 closure (Copy Lane to Switch Island)
M60 Anticlockwise hardshoulder closure (MP 2/6 to 2/2)
Planned Roadworks National HighwaysExpected to clear in 6 hours 23 minutes
M60 Anticlockwise hardshoulder closure (MP 2/6 to 2/2)
M40 Southbound, Jct 8a exit slip road lane one closure
Planned Roadworks National HighwaysExpected to clear in 8 hours 23 minutes
M40 Southbound, Jct 8a exit slip road lane one closure
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Planned Roadworks National HighwaysExpected to clear in 7 hours 23 minutes
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Both directions mobile lane closures
Planned Roadworks National HighwaysExpected to clear in 7 hours 23 minutes
Both directions mobile lane closures
A417 Southbound from A46 Shurdington to Air Balloon Roundabout carriageway closure
Active Roadworks National HighwaysExpected to clear in 19 hours 23 minutes
A417 Southbound from A46 Shurdington to Air Balloon Roundabout carriageway closure