M53 southbound hard shoulder closure (MP 33/1 to 33/4)
ClearedM53 southbound hard shoulder closure (MP 33/1 to 33/4)
- Start time
- Tue, Sep 22, 2026 12:00 PM
- Expected end
- Sat, Oct 31, 2026 6:00 AM
- Duration
- 2 weeks 6 days 3 hours
- Road
- M53 – M53 Southbound Within J10
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Sep 22, 2026 11:50 AM
- Last updated
- Mon, Oct 12, 2026 2:36 PM
- Cleared
- Mon, Oct 12, 2026 3:10 PM
- Latest update: M53 southbound hard shoulder closure (MP 33/1 to 33/4)
- Coordinates
- 53.266695, -2.877379
- Latitude span
- 53.265745 – 53.268671
- Longitude span
- -2.877613 – -2.877256
- Bounding box centre
- 53.267208, -2.877435
- Location descriptions
-
- M53 southbound within J10
- M53 southbound between J9 and J10
- Feed validity status
- Active
- Overall feed start
- Tue, Sep 22, 2026 12:00 PM
- Overall feed end
- Sat, Oct 31, 2026 6:00 AM
- Feed window length
- 1 month 1 week 1 day
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M53 southbound within J10
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M53
- Linear Element Model
- The Network Model
- Linear Element Id
- {3901F196-A7C2-4626-92B1-964BCB748795}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 5 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.265799 -2.877263 53.265745 -2.877256
Segment 2
4 coordinate pairs- Description
- M53 southbound between J9 and J10
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M53
- Linear Element Model
- The Network Model
- Linear Element Id
- {78861D36-8267-4DD5-8529-EBED0F133B2C}
- Linear Element Type
- A Carriageway
- From Distance
- 998 m
- To Distance
- 1,318 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.268671 -2.877613 53.267739 -2.877512 53.266418 -2.877365 53.265799 -2.877263
- Geometry type
- MultiLineString
- Geometry points
- 6
- First coordinate pair
- -2.877263, 53.265799
- Road section segments
- 1
- Road section points
- 6
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.877263,
53.265799
],
[
-2.877256,
53.265745
],
[
-2.877613,
53.268671
],
[
-2.877512,
53.267739
],
[
-2.877365,
53.266418
],
[
-2.877263,
53.265799
]
]
]
}
View road section coordinates
[
[
[
-2.877263,
53.265799
],
[
-2.877256,
53.265745
],
[
-2.877613,
53.268671
],
[
-2.877512,
53.267739
],
[
-2.877365,
53.266418
],
[
-2.877263,
53.265799
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Sep 22, 2026 11:50 AM
- Record versioned
- Mon, Oct 12, 2026 2:36 PM
- Coordinate source
- Geometry
Driving on the M53? See every live closure, roadwork and planned restriction on this road.
M53 live closuresRelated incidents
A55 Eastbound lane 1 closure (MP 134/0 to 135/4)
Planned Roadworks National HighwaysStarts in 2 hours 25 minutes
A55 Eastbound lane 1 closure (MP 134/0 to 135/4)
A55 Westbound Jct 39 entry slip road closure
Planned Roadworks National HighwaysStarts in 2 hours 25 minutes
A55 Westbound Jct 39 entry slip road closure
M53 Southbound lane 1 closure (MP 20/8 to 21/9)
Planned Roadworks National HighwaysStarts in 2 hours 25 minutes
M53 Southbound lane 1 closure (MP 20/8 to 21/9)
M53 Northbound Jct 4 exit slip road lane closure
Cleared Roadworks National HighwaysCleared 3 hours 9 minutes ago
M53 Northbound Jct 4 exit slip road lane closure
M53 Northbound Jct 4 entry slip road lane closure
Cleared Roadworks National HighwaysCleared 3 hours 29 minutes ago
M53 Northbound Jct 4 entry slip road lane closure
M53 Northbound Jct 4 exit slip road lane closure
Cleared Roadworks National HighwaysCleared 7 hours 19 minutes ago
M53 Northbound Jct 4 exit slip road lane closure