M6 southbound hard shoulder closure (MP 31/1 to 31/6)
ClearedM6 southbound hard shoulder closure (MP 31/1 to 31/6)
- Start time
- Tue, May 5, 2026 8:09 AM
- Expected end
- Tue, May 5, 2026 4:00 PM
- Duration
- 7 hours 51 minutes
- Road
- M53 – M53 Southbound Within J9
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, May 5, 2026 8:39 AM
- Last updated
- Tue, May 5, 2026 9:29 AM
- Cleared
- Tue, May 5, 2026 4:00 PM
- Latest update: M6 southbound hard shoulder closure (MP 31/1 to 31/6)
- Coordinates
- 53.282679, -2.887005
- Latitude span
- 53.280282 – 53.284905
- Longitude span
- -2.889807 – -2.885121
- Bounding box centre
- 53.282594, -2.887464
- Location descriptions
-
- M53 southbound within J9
- M53 southbound between J9 and J10
- Feed validity status
- Active
- Overall feed start
- Tue, May 5, 2026 8:09 AM
- Overall feed end
- Tue, May 5, 2026 4:00 PM
- Feed window length
- 7 hours 51 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M53 southbound within J9
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M53
- Linear Element Model
- The Network Model
- Linear Element Id
- {67AB5246-772E-43E2-A605-EF46F79D3B2C}
- Linear Element Type
- A Carriageway
- From Distance
- 179 m
- To Distance
- 285 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.284905 -2.889807 53.284703 -2.889413 53.284269 -2.888639
Segment 2
15 coordinate pairs- Description
- M53 southbound between J9 and J10
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M53
- Linear Element Model
- The Network Model
- Linear Element Id
- {7639BE91-5132-4829-AA58-6F51C1BF9C39}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 507 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.284269 -2.888639 53.283885 -2.888103 53.283618 -2.887752 53.283494 -2.8876 53.283039 -2.887065 53.282852 -2.886867 53.28254 -2.88656 53.282316 -2.886376 53.282191 -2.886268 53.281852 -2.885991 53.281485 -2.885743 53.281252 -2.885589 53.280876 -2.885386 53.280402 -2.885166 53.280282 -2.885121
- Geometry type
- MultiLineString
- Geometry points
- 18
- First coordinate pair
- -2.889807, 53.284905
- Road section segments
- 1
- Road section points
- 18
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.889807,
53.284905
],
[
-2.889413,
53.284703
],
[
-2.888639,
53.284269
],
[
-2.888639,
53.284269
],
[
-2.888103,
53.283885
],
[
-2.887752,
53.283618
],
[
-2.8876,
53.283494
],
[
-2.887065,
53.283039
],
[
-2.886867,
53.282852
],
[
-2.88656,
53.28254
],
[
-2.886376,
53.282316
],
[
-2.886268,
53.282191
],
[
-2.885991,
53.281852
],
[
-2.885743,
53.281485
],
[
-2.885589,
53.281252
],
[
-2.885386,
53.280876
],
[
-2.885166,
53.280402
],
[
-2.885121,
53.280282
]
]
]
}
View road section coordinates
[
[
[
-2.889807,
53.284905
],
[
-2.889413,
53.284703
],
[
-2.888639,
53.284269
],
[
-2.888639,
53.284269
],
[
-2.888103,
53.283885
],
[
-2.887752,
53.283618
],
[
-2.8876,
53.283494
],
[
-2.887065,
53.283039
],
[
-2.886867,
53.282852
],
[
-2.88656,
53.28254
],
[
-2.886376,
53.282316
],
[
-2.886268,
53.282191
],
[
-2.885991,
53.281852
],
[
-2.885743,
53.281485
],
[
-2.885589,
53.281252
],
[
-2.885386,
53.280876
],
[
-2.885166,
53.280402
],
[
-2.885121,
53.280282
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, May 5, 2026 8:39 AM
- Record versioned
- Tue, May 5, 2026 9:29 AM
- Coordinate source
- Geometry
Driving on the M53? See every live closure, roadwork and planned restriction on this road.
M53 live closuresRelated incidents
M56 Eastbound hardshoulder closure (MP 55/0 to 54/6)
Active Roadworks National HighwaysExpected to clear in 2 weeks 1 day
M56 Eastbound hardshoulder closure (MP 55/0 to 54/6)
A483 : Southbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 08/06/26-19/06/26 1900-0600 :
Active Roadworks Traffic WalesDescription: A483 : Southbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 08/06/26-19/06/26 1900-0600 :, Start time: 08/06/2026 19:00 , End Date: 19/06/2026 6:00, Severity: Road closure, Source: Welsh Government, Last updated: 12/06/2026 13:46
A483 : Northbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 15/06/26-19/06/26 1900-0600 :
Active Roadworks Traffic WalesDescription: A483 : Northbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 15/06/26-19/06/26 1900-0600 :, Start time: 15/06/2026 19:00 , End Date: 19/06/2026 6:00, Severity: Road closure, Source: Welsh Government, Last updated: 12/06/2026 13:48
M53 Northbound Jct 4 exit slip road lane closure
Planned Roadworks National HighwaysStarts in 3 hours 14 minutes
M53 Northbound Jct 4 exit slip road lane closure
M53 Northbound Jct 4 exit slip road lane closure
Cleared Roadworks National HighwaysCleared 16 hours 45 minutes ago
M53 Northbound Jct 4 exit slip road lane closure
M56 eastbound jct 14 - 12 lanes 1 and 2 closure (MP 47/5 - 43/9)
Cleared Roadworks National HighwaysCleared 14 hours 55 minutes ago
M56 eastbound jct 14 - 12 lanes 1 and 2 closure (MP 47/5 - 43/9)