M53 Southbound lane 2 closure (MP 27/2 to 27/9)
ClearedM53 Southbound lane 2 closure (MP 27/2 to 27/9)
- Start time
- Tue, Sep 22, 2026 7:41 PM
- Expected end
- Wed, Sep 23, 2026 5:00 AM
- Duration
- 3 hours 34 minutes 1 second
- Road
- M53 – M53 Southbound Between J6 And J7
- Category
- Construction Work
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 2 lanes affected
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Sep 22, 2026 7:41 PM
- Last updated
- Tue, Sep 22, 2026 10:41 PM
- Cleared
- Tue, Sep 22, 2026 11:15 PM
- Latest update: M53 Southbound lane 2 closure (MP 27/2 to 27/9)
- Coordinates
- 53.295826, -2.933176
- Latitude span
- 53.295316 – 53.297208
- Longitude span
- -2.938161 – -2.928661
- Bounding box centre
- 53.296262, -2.933411
- Location descriptions
-
- M53 southbound between J6 and J7
- M53 southbound within J7
- Feed validity status
- Active
- Overall feed start
- Tue, Sep 22, 2026 7:41 PM
- Overall feed end
- Wed, Sep 23, 2026 5:00 AM
- Feed window length
- 9 hours 19 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
25 coordinate pairs- Description
- M53 southbound between J6 and J7
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M53
- Linear Element Model
- The Network Model
- Linear Element Id
- {470F2095-C4C6-478E-B4BC-B6EADEA28677}
- Linear Element Type
- A Carriageway
- From Distance
- 789 m
- To Distance
- 1,479 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.297208 -2.938161 53.297042 -2.937889 53.296944 -2.937722 53.296608 -2.9371 53.296457 -2.936781 53.296307 -2.936418 53.296096 -2.935858 53.296008 -2.935616 53.295929 -2.935358 53.295921 -2.935329 53.295798 -2.934906 53.295693 -2.934484 53.295598 -2.934062 53.295487 -2.933354 53.295402 -2.932647 53.295352 -2.932136 53.295323 -2.931637 53.295316 -2.931055 53.295319 -2.930605 53.295321 -2.93044 53.295342 -2.93005 53.295361 -2.929841 53.295428 -2.929287 53.295495 -2.928868 53.295513 -2.928742
Segment 2
2 coordinate pairs- Description
- M53 southbound within J7
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M53
- Linear Element Model
- The Network Model
- Linear Element Id
- {3CB65BCD-248F-4382-9308-A259697038A4}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 5 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.295513 -2.928742 53.295526 -2.928661
- Geometry type
- MultiLineString
- Geometry points
- 27
- First coordinate pair
- -2.938161, 53.297208
- Road section segments
- 1
- Road section points
- 27
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.938161,
53.297208
],
[
-2.937889,
53.297042
],
[
-2.937722,
53.296944
],
[
-2.9371,
53.296608
],
[
-2.936781,
53.296457
],
[
-2.936418,
53.296307
],
[
-2.935858,
53.296096
],
[
-2.935616,
53.296008
],
[
-2.935358,
53.295929
],
[
-2.935329,
53.295921
],
[
-2.934906,
53.295798
],
[
-2.934484,
53.295693
],
[
-2.934062,
53.295598
],
[
-2.933354,
53.295487
],
[
-2.932647,
53.295402
],
[
-2.932136,
53.295352
],
[
-2.931637,
53.295323
],
[
-2.931055,
53.295316
],
[
-2.930605,
53.295319
],
[
-2.93044,
53.295321
],
[
-2.93005,
53.295342
],
[
-2.929841,
53.295361
],
[
-2.929287,
53.295428
],
[
-2.928868,
53.295495
],
[
-2.928742,
53.295513
],
[
-2.928742,
53.295513
],
[
-2.928661,
53.295526
]
]
]
}
View road section coordinates
[
[
[
-2.938161,
53.297208
],
[
-2.937889,
53.297042
],
[
-2.937722,
53.296944
],
[
-2.9371,
53.296608
],
[
-2.936781,
53.296457
],
[
-2.936418,
53.296307
],
[
-2.935858,
53.296096
],
[
-2.935616,
53.296008
],
[
-2.935358,
53.295929
],
[
-2.935329,
53.295921
],
[
-2.934906,
53.295798
],
[
-2.934484,
53.295693
],
[
-2.934062,
53.295598
],
[
-2.933354,
53.295487
],
[
-2.932647,
53.295402
],
[
-2.932136,
53.295352
],
[
-2.931637,
53.295323
],
[
-2.931055,
53.295316
],
[
-2.930605,
53.295319
],
[
-2.93044,
53.295321
],
[
-2.93005,
53.295342
],
[
-2.929841,
53.295361
],
[
-2.929287,
53.295428
],
[
-2.928868,
53.295495
],
[
-2.928742,
53.295513
],
[
-2.928742,
53.295513
],
[
-2.928661,
53.295526
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Sep 22, 2026 7:41 PM
- Record versioned
- Tue, Sep 22, 2026 10:41 PM
- Coordinate source
- Geometry
Driving on the M53? See every live closure, roadwork and planned restriction on this road.
M53 live closuresRelated incidents
A494 : Eastbound : A55 J33B Ewloe to Ewloe : Roadworks : Road closed : Diversions in place : 11/10/26-23/10/26 1900-0600 :
Active Roadworks Traffic WalesDescription: A494 : Eastbound : A55 J33B Ewloe to Ewloe : Roadworks : Road closed : Diversions in place : 11/10/26-23/10/26 1900-0600 :, Start time: 11/10/2026 19:00 , End Date: 23/10/2026 6:00, Severity: Road closure, Source: Welsh Government, Last updated: 11/10/2026 19:00
A494 : Both directions : Ruthin : Improvement work : STOP/GO in use : Delays possible : 28/09/26-23/10/26 0900-1200 :
Active Roadworks Traffic WalesDescription: A494 : Both directions : Ruthin : Improvement work : STOP/GO in use : Delays possible : 28/09/26-23/10/26 0900-1200 :, Start time: 28/09/2026 9:00 , End Date: 23/10/2026 12:00, Severity: Moderate, Source: Welsh Government, Last updated: 28/09/2026 9:00
M53 Southbound lane 1 closure (MP 20/8 to 21/9)
Planned Roadworks National HighwaysStarts in 2 hours 24 minutes
M53 Southbound lane 1 closure (MP 20/8 to 21/9)
M53 Northbound Jct 4 exit slip road lane closure
Cleared Roadworks National HighwaysCleared 3 hours 10 minutes ago
M53 Northbound Jct 4 exit slip road lane closure
M53 Northbound Jct 4 entry slip road lane closure
Cleared Roadworks National HighwaysCleared 3 hours 30 minutes ago
M53 Northbound Jct 4 entry slip road lane closure
M53 Northbound Jct 4 exit slip road lane closure
Cleared Roadworks National HighwaysCleared 7 hours 20 minutes ago
M53 Northbound Jct 4 exit slip road lane closure