M53 southbound jct 9 exit slip road closure

Cleared

M53 southbound jct 9 exit slip road closure

Start time
Thu, Mar 26, 2026 9:00 PM
Expected end
Fri, Mar 27, 2026 6:00 AM
Duration
9 hours
Road
M53 – M53 J9 Southbound Exit
Category
Road Maintenance
Direction
Southbound
Reason
Roadworks
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Fri, Mar 6, 2026 3:44 PM
Last updated
Fri, Mar 27, 2026 5:49 AM
Cleared
Fri, Mar 27, 2026 6:00 AM
  • Latest update: M53 southbound jct 9 exit slip road closure
Coordinates
53.288441, -2.896999
Latitude span
53.287847 – 53.289408
Longitude span
-2.899426 – -2.895442
Bounding box centre
53.288628, -2.897434
Location descriptions
  • M53 J9 southbound exit
Feed validity status
Planned
Overall feed start
Thu, Mar 26, 2026 9:00 PM
Overall feed end
Fri, Mar 27, 2026 6:00 AM
Feed window length
9 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
carriagewayClosures (Carriageway Closures)
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

4 coordinate pairs
Description
M53 J9 southbound exit
Lanes Restricted
2 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
South Bound
Direction Relative
Aligned
Height Grade
Start2 End1
Linear Element Road
M53
Linear Element Model
The Network Model
Linear Element Id
{9BE5DED1-7491-414E-B68F-600193A6D7B9}
Linear Element Type
A Carriageway Exit Slip
From Distance
0 m
To Distance
125 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.288448 -2.897033
53.288404 -2.896912
53.287875 -2.895506
53.287847 -2.895442

Segment 2

3 coordinate pairs
Description
M53 J9 southbound exit
Lanes Restricted
2 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
South Bound
Direction Relative
Aligned
Height Grade
Start1 End2
Linear Element Road
M53
Linear Element Model
The Network Model
Linear Element Id
{D35F21D1-F9B7-4FD6-8B2A-5E8D45DDC395}
Linear Element Type
A Carriageway Exit Slip
From Distance
0 m
To Distance
192 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.289408 -2.899426
53.288659 -2.897638
53.288448 -2.897033
Geometry type
MultiLineString
Geometry points
7
First coordinate pair
-2.897033, 53.288448
Road section segments
1
Road section points
7
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -2.897033,
                53.288448
            ],
            [
                -2.896912,
                53.288404
            ],
            [
                -2.895506,
                53.287875
            ],
            [
                -2.895442,
                53.287847
            ],
            [
                -2.899426,
                53.289408
            ],
            [
                -2.897638,
                53.288659
            ],
            [
                -2.897033,
                53.288448
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -2.897033,
            53.288448
        ],
        [
            -2.896912,
            53.288404
        ],
        [
            -2.895506,
            53.287875
        ],
        [
            -2.895442,
            53.287847
        ],
        [
            -2.899426,
            53.289408
        ],
        [
            -2.897638,
            53.288659
        ],
        [
            -2.897033,
            53.288448
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Roadworks
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Carriageway Closures
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Fri, Mar 6, 2026 3:44 PM
Record versioned
Fri, Mar 27, 2026 5:49 AM
Coordinate source
Geometry

Driving on the M53? See every live closure, roadwork and planned restriction on this road.

M53 live closures

Related incidents

M56 Eastbound hardshoulder closure (MP 55/0 to 54/6)

Active Roadworks National Highways
Cheshire West And Chester M56 · M56 Eastbound Between J15 And J14

Expected to clear in 2 weeks 1 day

Started 26 Mar 2026, 06:00 Expected clear 30 Jun 2026, 05:00

M56 Eastbound hardshoulder closure (MP 55/0 to 54/6)

Category: Road Maintenance
View update

A483 : Southbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 08/06/26-19/06/26 1900-0600 :

Active Roadworks Traffic Wales
Cheshire West And Chester
Started Start time TBC

Description: A483 : Southbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 08/06/26-19/06/26 1900-0600 :, Start time: 08/06/2026 19:00 , End Date: 19/06/2026 6:00, Severity: Road closure, Source: Welsh Government, Last updated: 12/06/2026 13:46

View update

A483 : Northbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 15/06/26-19/06/26 1900-0600 :

Active Roadworks Traffic Wales
Cheshire West And Chester
Started Start time TBC

Description: A483 : Northbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 15/06/26-19/06/26 1900-0600 :, Start time: 15/06/2026 19:00 , End Date: 19/06/2026 6:00, Severity: Road closure, Source: Welsh Government, Last updated: 12/06/2026 13:48

View update

M53 Northbound Jct 4 exit slip road lane closure

Planned Roadworks National Highways
Wirral M53 · M53 Northbound Between J5 And J4

Starts in 34 minutes 26 seconds

Starts 14 Jun 2026, 20:00 Expected clear 15 Jun 2026, 03:00

M53 Northbound Jct 4 exit slip road lane closure

Category: Authority Operation
View update

M53 Northbound Jct 4 exit slip road lane closure

Cleared Roadworks National Highways
Wirral M53 · M53 Northbound Between J5 And J4

Cleared 19 hours 25 minutes ago

Started 13 Jun 2026, 20:00 Ended 14 Jun 2026, 00:00

M53 Northbound Jct 4 exit slip road lane closure

Category: Authority Operation
View update

M56 eastbound jct 14 - 12 lanes 1 and 2 closure (MP 47/5 - 43/9)

Cleared Roadworks National Highways
Cheshire West And Chester M56 · M56 Eastbound Between J14 And J12

Cleared 17 hours 35 minutes ago

Started 13 Jun 2026, 19:50 Ended 14 Jun 2026, 01:50

M56 eastbound jct 14 - 12 lanes 1 and 2 closure (MP 47/5 - 43/9)

Category: Road Maintenance
View update