M53 Southbound Jct 12 exit slip road Lane 1 closure
ClearedM53 Southbound Jct 12 exit slip road Lane 1 closure
- Start time
- Wed, Apr 29, 2026 8:00 PM
- Expected end
- Thu, Apr 30, 2026 5:00 AM
- Duration
- 9 hours
- Road
- M53 – M53 J12 Southbound Exit
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 2 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Apr 29, 2026 1:57 AM
- Last updated
- Wed, Apr 29, 2026 2:46 AM
- Cleared
- Thu, Apr 30, 2026 5:00 AM
- Latest update: M53 Southbound Jct 12 exit slip road Lane 1 closure
- Coordinates
- 53.214060, -2.855667
- Latitude span
- 53.212277 – 53.216161
- Longitude span
- -2.858268 – -2.852601
- Bounding box centre
- 53.214219, -2.855435
- Location descriptions
-
- M53 J12 southbound exit
- M53 southbound between J11 and J12
- M53 southbound within J12
- Feed validity status
- Planned
- Overall feed start
- Wed, Apr 29, 2026 8:00 PM
- Overall feed end
- Thu, Apr 30, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
8 coordinate pairs- Description
- M53 J12 southbound exit
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M53
- Linear Element Model
- The Network Model
- Linear Element Id
- {0AF48F69-DD4E-4947-8E9D-D066192F1383}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 344 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.214342 -2.856411 53.214086 -2.855992 53.213376 -2.854794 53.212906 -2.853946 53.212622 -2.853433 53.212438 -2.85309 53.212323 -2.852794 53.212277 -2.852601
Segment 2
6 coordinate pairs- Description
- M53 southbound between J11 and J12
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M53
- Linear Element Model
- The Network Model
- Linear Element Id
- {D3EDC699-D91F-43D9-A740-802A594E0CEB}
- Linear Element Type
- A Carriageway
- From Distance
- 867 m
- To Distance
- 1,087 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.216161 -2.858268 53.215744 -2.857911 53.215619 -2.857803 53.214986 -2.857162 53.214781 -2.856918 53.214477 -2.856568
Segment 3
2 coordinate pairs- Description
- M53 southbound within J12
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M53
- Linear Element Model
- The Network Model
- Linear Element Id
- {181F7C30-DF3B-4ED6-AA94-28E2EDE848FA}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 18 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.214477 -2.856568 53.214342 -2.856411
- Geometry type
- MultiLineString
- Geometry points
- 16
- First coordinate pair
- -2.856411, 53.214342
- Road section segments
- 1
- Road section points
- 16
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.856411,
53.214342
],
[
-2.855992,
53.214086
],
[
-2.854794,
53.213376
],
[
-2.853946,
53.212906
],
[
-2.853433,
53.212622
],
[
-2.85309,
53.212438
],
[
-2.852794,
53.212323
],
[
-2.852601,
53.212277
],
[
-2.858268,
53.216161
],
[
-2.857911,
53.215744
],
[
-2.857803,
53.215619
],
[
-2.857162,
53.214986
],
[
-2.856918,
53.214781
],
[
-2.856568,
53.214477
],
[
-2.856568,
53.214477
],
[
-2.856411,
53.214342
]
]
]
}
View road section coordinates
[
[
[
-2.856411,
53.214342
],
[
-2.855992,
53.214086
],
[
-2.854794,
53.213376
],
[
-2.853946,
53.212906
],
[
-2.853433,
53.212622
],
[
-2.85309,
53.212438
],
[
-2.852794,
53.212323
],
[
-2.852601,
53.212277
],
[
-2.858268,
53.216161
],
[
-2.857911,
53.215744
],
[
-2.857803,
53.215619
],
[
-2.857162,
53.214986
],
[
-2.856918,
53.214781
],
[
-2.856568,
53.214477
],
[
-2.856568,
53.214477
],
[
-2.856411,
53.214342
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 20
- Record created
- Wed, Apr 29, 2026 1:57 AM
- Record versioned
- Wed, Apr 29, 2026 2:46 AM
- Coordinate source
- Geometry
Driving on the M53? See every live closure, roadwork and planned restriction on this road.
M53 live closuresRelated incidents
M56 Eastbound hardshoulder closure (MP 55/0 to 54/6)
Active Roadworks National HighwaysExpected to clear in 2 weeks 1 day
M56 Eastbound hardshoulder closure (MP 55/0 to 54/6)
A483 : Southbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 08/06/26-19/06/26 1900-0600 :
Active Roadworks Traffic WalesDescription: A483 : Southbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 08/06/26-19/06/26 1900-0600 :, Start time: 08/06/2026 19:00 , End Date: 19/06/2026 6:00, Severity: Road closure, Source: Welsh Government, Last updated: 12/06/2026 13:46
A483 : Northbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 15/06/26-19/06/26 1900-0600 :
Active Roadworks Traffic WalesDescription: A483 : Northbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 15/06/26-19/06/26 1900-0600 :, Start time: 15/06/2026 19:00 , End Date: 19/06/2026 6:00, Severity: Road closure, Source: Welsh Government, Last updated: 12/06/2026 13:48
M53 Northbound Jct 4 exit slip road lane closure
Planned Roadworks National HighwaysStarts in 1 hour 30 minutes
M53 Northbound Jct 4 exit slip road lane closure
M53 Northbound Jct 4 exit slip road lane closure
Cleared Roadworks National HighwaysCleared 18 hours 29 minutes ago
M53 Northbound Jct 4 exit slip road lane closure
M56 eastbound jct 14 - 12 lanes 1 and 2 closure (MP 47/5 - 43/9)
Cleared Roadworks National HighwaysCleared 16 hours 39 minutes ago
M56 eastbound jct 14 - 12 lanes 1 and 2 closure (MP 47/5 - 43/9)