M3 northbound lane 1 closure on exit slip road
ClearedM3 northbound lane 1 closure on exit slip road
- Start time
- Thu, Aug 13, 2026 7:00 PM
- Expected end
- Fri, Aug 14, 2026 5:00 AM
- Duration
- 1 hour 1 second
- Category
- Authority Operation
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Jul 28, 2026 10:29 PM
- Last updated
- Thu, Aug 13, 2026 7:34 PM
- Cleared
- Thu, Aug 13, 2026 8:00 PM
- Latest update: M3 northbound lane 1 closure on exit slip road
- Feed validity status
- Planned
- Overall feed start
- Thu, Aug 13, 2026 7:00 PM
- Overall feed end
- Fri, Aug 14, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
- Cause type
- Authority Operation
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Jul 28, 2026 10:29 PM
- Record versioned
- Thu, Aug 13, 2026 7:34 PM
Related incidents
Lane 2 closure eastbound
Planned Roadworks National HighwaysExpected to clear in 8 hours 25 minutes
Lane 2 closure eastbound
A5 eastbound Weeford to Mile Oak carriageway closure
Planned Roadworks National HighwaysExpected to clear in 8 hours 25 minutes
A5 eastbound Weeford to Mile Oak carriageway closure
M27 westbound Jct 3 entry slip road closure
Planned Roadworks National HighwaysExpected to clear in 8 hours 25 minutes
M27 westbound Jct 3 entry slip road closure
M23 northbound Jct 11 to Jct 9 carriageway closure
Planned Roadworks National HighwaysExpected to clear in 8 hours 25 minutes
M23 northbound Jct 11 to Jct 9 carriageway closure
A1 both directions Water Newton to Fletton Parkway back-to-back lane 2 closures
Planned Roadworks National HighwaysExpected to clear in 7 hours 25 minutes
A1 both directions Water Newton to Fletton Parkway back-to-back lane 2 closures
A1 southbound Biggleswade South Roundabout to Edworth lane 2 closure (MP 70/0 to 67/3)
Planned Roadworks National HighwaysExpected to clear in 7 hours 25 minutes
A1 southbound Biggleswade South Roundabout to Edworth lane 2 closure (MP 70/0 to 67/3)