M25 Anti-clockwise Jct 8 exit slip road lane 1 closure
ClearedM25 Anti-clockwise Jct 8 exit slip road lane 1 closure
- Start time
- Sat, Oct 24, 2026 9:00 PM
- Expected end
- Sun, Oct 25, 2026 6:00 AM
- Duration
- 9 hours
- Road
- M25 – M25 Anti-Clockwise Between J9 And J8
- Category
- Road Maintenance
- Direction
- Anticlockwise
- Carriageway
- Dual Carriageway
- Lanes affected
- 1 of 4 lanes affected, 1 of 1 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Sep 30, 2026 12:51 PM
- Last updated
- Sat, Oct 24, 2026 12:10 AM
- Cleared
- Sun, Oct 25, 2026 6:00 AM
- Latest update: M25 Anti-clockwise Jct 8 exit slip road lane 1 closure
- Coordinates
- 51.258588, -0.201148
- Latitude span
- 51.258084 – 51.258994
- Longitude span
- -0.204205 – -0.199344
- Bounding box centre
- 51.258539, -0.201775
- Location descriptions
-
- M25 anti-clockwise between J9 and J8
- M25 J8 anti-clockwise exit
- Feed validity status
- Suspended
- Overall feed start
- Sat, Oct 24, 2026 9:00 PM
- Overall feed end
- Sun, Oct 25, 2026 6:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M25 anti-clockwise between J9 and J8
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {A9C06AC2-2C3A-4CC6-8728-E230DC439FBA}
- Linear Element Type
- B Carriageway
- From Distance
- 151 m
- To Distance
- 203 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.258084 -0.204205 51.258148 -0.203461
Segment 2
10 coordinate pairs- Description
- M25 J8 anti-clockwise exit
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {487989F0-7249-4F4B-AB23-98A62151AE2F}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 303 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.258148 -0.203461 51.258415 -0.201848 51.258517 -0.201234 51.258575 -0.200931 51.258659 -0.200526 51.258743 -0.200136 51.258828 -0.199832 51.258957 -0.199425 51.258983 -0.199367 51.258994 -0.199344
- Geometry type
- MultiLineString
- Geometry points
- 12
- First coordinate pair
- -0.204205, 51.258084
- Road section segments
- 1
- Road section points
- 12
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.204205,
51.258084
],
[
-0.203461,
51.258148
],
[
-0.203461,
51.258148
],
[
-0.201848,
51.258415
],
[
-0.201234,
51.258517
],
[
-0.200931,
51.258575
],
[
-0.200526,
51.258659
],
[
-0.200136,
51.258743
],
[
-0.199832,
51.258828
],
[
-0.199425,
51.258957
],
[
-0.199367,
51.258983
],
[
-0.199344,
51.258994
]
]
]
}
View road section coordinates
[
[
[
-0.204205,
51.258084
],
[
-0.203461,
51.258148
],
[
-0.203461,
51.258148
],
[
-0.201848,
51.258415
],
[
-0.201234,
51.258517
],
[
-0.200931,
51.258575
],
[
-0.200526,
51.258659
],
[
-0.200136,
51.258743
],
[
-0.199832,
51.258828
],
[
-0.199425,
51.258957
],
[
-0.199367,
51.258983
],
[
-0.199344,
51.258994
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Suspended
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Sep 30, 2026 12:51 PM
- Record versioned
- Sat, Oct 24, 2026 12:10 AM
- Coordinate source
- Geometry
Driving on the M25? See every live closure, roadwork and planned restriction on this road.
M25 live closuresRelated incidents
M25 Clockwise Jct 15 lane 3,2 closure between the exit and entry slip road
Cleared Roadworks National HighwaysExpected to clear in 22 hours 34 minutes
M25 Clockwise Jct 15 lane 3,2 closure between the exit and entry slip road
M25 Anti-clockwise Jct 6 to Jct 5 lane 1,2 closure
Planned Roadworks National HighwaysStarts in 13 hours 34 minutes
M25 Anti-clockwise Jct 6 to Jct 5 lane 1,2 closure
M25 Anti-clockwise Jct 16 to Jct 15 lane 4,3,2 closure
Cleared Roadworks National HighwaysExpected to clear in 1 day 2 hours
M25 Anti-clockwise Jct 16 to Jct 15 lane 4,3,2 closure
M25 Anti-clockwise Jct 6 to Jct 5 lane 4,3 closure
Cleared Roadworks National HighwaysCleared 3 hours 59 minutes ago
M25 Anti-clockwise Jct 6 to Jct 5 lane 4,3 closure
M25 Clockwise Jct 19 to Jct 20 Lane 1,2 closure
Cleared Roadworks National HighwaysCleared 2 hours 50 minutes ago
M25 Clockwise Jct 19 to Jct 20 Lane 1,2 closure
M25 Clacket Lane Services exit slip road closure
Cleared Roadworks National HighwaysCleared 6 hours 19 minutes ago
M25 Clacket Lane Services exit slip road closure