M25 Clacket Lane Services exit slip road closure
PlannedM25 Clacket Lane Services exit slip road closure
- Start time
- Fri, Oct 23, 2026 10:00 PM
- Expected end
- Sat, Oct 24, 2026 4:30 AM
- Duration
- 6 hours 30 minutes
- Road
- M25 – M25 Clockwise At The Clacket Lane Services Slip Road Between J5 And J6
- Category
- Road Maintenance
- Direction
- Clockwise
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Oct 15, 2026 2:25 PM
- Last updated
- Fri, Oct 23, 2026 2:18 AM
- Cleared
- Sat, Oct 24, 2026 4:30 AM
- Latest update: M25 Clacket Lane Services exit slip road closure
- Coordinates
- 51.272637, 0.042627
- Latitude span
- 51.272532 – 51.272823
- Longitude span
- 0.040479 – 0.047109
- Bounding box centre
- 51.272678, 0.043794
- Location descriptions
-
- M25 clockwise at the Clacket Lane services slip road between J5 and J6
- Feed validity status
- Planned
- Overall feed start
- Fri, Oct 23, 2026 10:00 PM
- Overall feed end
- Sat, Oct 24, 2026 4:30 AM
- Feed window length
- 6 hours 30 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
6 coordinate pairs- Description
- M25 clockwise at the Clacket Lane services slip road between J5 and J6
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {02369CAB-2B99-4C48-95D6-92267D0D2AC5}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 438 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.272823 0.047109 51.2727 0.044039 51.272674 0.043424 51.272632 0.042348 51.27262 0.041935 51.272558 0.040841
Segment 2
2 coordinate pairs- Description
- M25 clockwise at the Clacket Lane services slip road between J5 and J6
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {DCE353D6-BC1D-4746-8915-6655F2043099}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 25 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.272558 0.040841 51.272532 0.040479
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- 0.047109, 51.272823
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.047109,
51.272823
],
[
0.044039,
51.2727
],
[
0.043424,
51.272674
],
[
0.042348,
51.272632
],
[
0.041935,
51.27262
],
[
0.040841,
51.272558
],
[
0.040841,
51.272558
],
[
0.040479,
51.272532
]
]
]
}
View road section coordinates
[
[
[
0.047109,
51.272823
],
[
0.044039,
51.2727
],
[
0.043424,
51.272674
],
[
0.042348,
51.272632
],
[
0.041935,
51.27262
],
[
0.040841,
51.272558
],
[
0.040841,
51.272558
],
[
0.040479,
51.272532
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Thu, Oct 15, 2026 2:25 PM
- Record versioned
- Fri, Oct 23, 2026 2:18 AM
- Coordinate source
- Geometry
Driving on the M25? See every live closure, roadwork and planned restriction on this road.
M25 live closuresRelated incidents
M25 clockwise Jct 27 to Jct 28 Lane 1,2 closure
Planned Roadworks National HighwaysStarts in 19 hours 13 minutes
M25 clockwise Jct 27 to Jct 28 Lane 1,2 closure
M25 Anti-clockwise Jct 6 to Jct 5 lane 4,3 closure
Planned Roadworks National HighwaysStarts in 19 hours 13 minutes
M25 Anti-clockwise Jct 6 to Jct 5 lane 4,3 closure
M25 Anti-clockwise Jct 12 to Jct 11 lane 1,2 closure
Planned Roadworks National HighwaysStarts in 19 hours 13 minutes
M25 Anti-clockwise Jct 12 to Jct 11 lane 1,2 closure
M25 Clockwise Jct 17 to Jct 18 lane 4 closure
Planned Roadworks National HighwaysStarts in 19 hours 13 minutes
M25 Clockwise Jct 17 to Jct 18 lane 4 closure
M25 Anti-clockwise Jct 9 to Jct 8 lane 4,3 closure
Planned Roadworks National HighwaysStarts in 19 hours 13 minutes
M25 Anti-clockwise Jct 9 to Jct 8 lane 4,3 closure
M25 Anti-clockwise Jct 7 to Jct 6 lane 1,2,3 closure
Cleared Roadworks National HighwaysCleared 1 hour 26 minutes ago
M25 Anti-clockwise Jct 7 to Jct 6 lane 1,2,3 closure