A19/67 Crathorne Interchange southbound entry slip road closure
ClearedA19/67 Crathorne Interchange southbound entry slip road closure
- Start time
- Thu, Feb 19, 2026 8:00 PM
- Expected end
- Fri, Feb 20, 2026 6:00 AM
- Duration
- 10 hours
- Road
- A67 – A19 Southbound Exit For A67
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Singlecarriageway
- Reason
- Road Marking Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Feb 19, 2026 7:40 PM
- Last updated
- Thu, Feb 19, 2026 11:17 PM
- Cleared
- Fri, Feb 20, 2026 6:00 AM
- Latest update: A19/67 Crathorne Interchange southbound entry slip road closure
- Coordinates
- 54.472491, -1.321793
- Latitude span
- 54.471712 – 54.473058
- Longitude span
- -1.323150 – -1.320943
- Bounding box centre
- 54.472385, -1.322047
- Location descriptions
-
- A19 southbound exit for A67
- A19 southbound access from A67
- Feed validity status
- Active
- Overall feed start
- Thu, Feb 19, 2026 8:00 PM
- Overall feed end
- Fri, Feb 20, 2026 6:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
24 coordinate pairs- Description
- A19 southbound exit for A67
- Carriageway
- Single Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Both
- Height Grade
- Start1 End1
- Linear Element Road
- A67
- Linear Element Model
- The Network Model
- Linear Element Id
- {BAEF92A5-9B49-4BAF-8478-313C2200729C}
- Linear Element Type
- Other
- From Distance
- 0 m
- To Distance
- 244 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.471759 -1.322798 54.471732 -1.322591 54.471722 -1.322514 54.471712 -1.322313 54.47172 -1.32219 54.471729 -1.322051 54.471755 -1.321896 54.471816 -1.321648 54.471887 -1.321477 54.471932 -1.321384 54.472038 -1.321212 54.472172 -1.321071 54.472244 -1.321024 54.472369 -1.32096 54.472396 -1.320953 54.472432 -1.320943 54.472585 -1.320956 54.472675 -1.321001 54.472775 -1.321077 54.472838 -1.321153 54.472874 -1.321198 54.472938 -1.321321 54.472992 -1.321474 54.473011 -1.321567
Segment 2
13 coordinate pairs- Description
- A19 southbound access from A67
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A67
- Linear Element Model
- The Network Model
- Linear Element Id
- {ADB2308A-D93B-4968-A592-4094CB6C6D06}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 132 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.473011 -1.321567 54.47303 -1.321705 54.473048 -1.321844 54.473058 -1.321936 54.473049 -1.322013 54.473041 -1.322122 54.473024 -1.322245 54.47298 -1.3224 54.472935 -1.322509 54.472909 -1.322571 54.472828 -1.322681 54.472712 -1.322821 54.472454 -1.32315
- Geometry type
- MultiLineString
- Geometry points
- 37
- First coordinate pair
- -1.322798, 54.471759
- Road section segments
- 1
- Road section points
- 37
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.322798,
54.471759
],
[
-1.322591,
54.471732
],
[
-1.322514,
54.471722
],
[
-1.322313,
54.471712
],
[
-1.32219,
54.47172
],
[
-1.322051,
54.471729
],
[
-1.321896,
54.471755
],
[
-1.321648,
54.471816
],
[
-1.321477,
54.471887
],
[
-1.321384,
54.471932
],
[
-1.321212,
54.472038
],
[
-1.321071,
54.472172
],
[
-1.321024,
54.472244
],
[
-1.32096,
54.472369
],
[
-1.320953,
54.472396
],
[
-1.320943,
54.472432
],
[
-1.320956,
54.472585
],
[
-1.321001,
54.472675
],
[
-1.321077,
54.472775
],
[
-1.321153,
54.472838
],
[
-1.321198,
54.472874
],
[
-1.321321,
54.472938
],
[
-1.321474,
54.472992
],
[
-1.321567,
54.473011
],
[
-1.321567,
54.473011
],
[
-1.321705,
54.47303
],
[
-1.321844,
54.473048
],
[
-1.321936,
54.473058
],
[
-1.322013,
54.473049
],
[
-1.322122,
54.473041
],
[
-1.322245,
54.473024
],
[
-1.3224,
54.47298
],
[
-1.322509,
54.472935
],
[
-1.322571,
54.472909
],
[
-1.322681,
54.472828
],
[
-1.322821,
54.472712
],
[
-1.32315,
54.472454
]
]
]
}
View road section coordinates
[
[
[
-1.322798,
54.471759
],
[
-1.322591,
54.471732
],
[
-1.322514,
54.471722
],
[
-1.322313,
54.471712
],
[
-1.32219,
54.47172
],
[
-1.322051,
54.471729
],
[
-1.321896,
54.471755
],
[
-1.321648,
54.471816
],
[
-1.321477,
54.471887
],
[
-1.321384,
54.471932
],
[
-1.321212,
54.472038
],
[
-1.321071,
54.472172
],
[
-1.321024,
54.472244
],
[
-1.32096,
54.472369
],
[
-1.320953,
54.472396
],
[
-1.320943,
54.472432
],
[
-1.320956,
54.472585
],
[
-1.321001,
54.472675
],
[
-1.321077,
54.472775
],
[
-1.321153,
54.472838
],
[
-1.321198,
54.472874
],
[
-1.321321,
54.472938
],
[
-1.321474,
54.472992
],
[
-1.321567,
54.473011
],
[
-1.321567,
54.473011
],
[
-1.321705,
54.47303
],
[
-1.321844,
54.473048
],
[
-1.321936,
54.473058
],
[
-1.322013,
54.473049
],
[
-1.322122,
54.473041
],
[
-1.322245,
54.473024
],
[
-1.3224,
54.47298
],
[
-1.322509,
54.472935
],
[
-1.322571,
54.472909
],
[
-1.322681,
54.472828
],
[
-1.322821,
54.472712
],
[
-1.32315,
54.472454
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Road Marking Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Feb 19, 2026 7:40 PM
- Record versioned
- Thu, Feb 19, 2026 11:17 PM
- Coordinate source
- Geometry
Driving on the A67? See every live closure, roadwork and planned restriction on this road.
A67 live closuresRelated incidents
A19 Redhill Overbridge northbound lane 2 closure
Planned Roadworks National HighwaysStarts in 12 hours 25 minutes
A19 Redhill Overbridge northbound lane 2 closure
A66 Yarm Road to Teesside Park eastbound lane 2 closure
Cleared Roadworks National HighwaysCleared 1 day 1 hour ago
A66 Yarm Road to Teesside Park eastbound lane 2 closure
A19 Redhill Overbridge northbound lane 2 closure
Cleared Roadworks National HighwaysCleared 2 days 4 hours ago
A19 Redhill Overbridge northbound lane 2 closure
A19 Redhill Overbridge northbound lane 2 closure
Cleared Roadworks National HighwaysCleared 2 days 10 hours ago
A19 Redhill Overbridge northbound lane 2 closure
A19 Redhill Overbridge northbound lane 2 closure
Cleared Roadworks National HighwaysCleared 3 days 6 hours ago
A19 Redhill Overbridge northbound lane 2 closure
A66 Yarm Road exit slip road westbound lane 1 closure
Cleared Roadworks National HighwaysCleared 3 days 4 hours ago
A66 Yarm Road exit slip road westbound lane 1 closure