A19 Silverlink Southbound Entry Slip Road Lane 1 Closure
ClearedA19 Silverlink Southbound Entry Slip Road Lane 1 Closure
- Start time
- Fri, Aug 21, 2026 7:00 PM
- Expected end
- Sat, Aug 22, 2026 5:00 AM
- Duration
- 10 hours
- Category
- Authority Operation
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Aug 21, 2026 7:16 AM
- Last updated
- Sat, Aug 22, 2026 4:44 AM
- Cleared
- Sat, Aug 22, 2026 5:00 AM
- Latest update: A19 Silverlink Southbound Entry Slip Road Lane 1 Closure
- Feed validity status
- Planned
- Overall feed start
- Fri, Aug 21, 2026 7:00 PM
- Overall feed end
- Sat, Aug 22, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
- Cause type
- Authority Operation
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Aug 21, 2026 7:16 AM
- Record versioned
- Sat, Aug 22, 2026 4:44 AM
Related incidents
Hard shoulder closure southbound
Planned Roadworks National HighwaysExpected to clear in 9 hours 42 minutes
Hard shoulder closure southbound
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Planned Roadworks National HighwaysExpected to clear in 10 hours 42 minutes
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Both directions mobile lane closures
Planned Roadworks National HighwaysExpected to clear in 10 hours 42 minutes
Both directions mobile lane closures
A66 Eastbound and Westbound Ramsay Brow to Stainburn Roundabout Carriageway closure
Planned Roadworks National HighwaysExpected to clear in 1 day 22 hours
A66 Eastbound and Westbound Ramsay Brow to Stainburn Roundabout Carriageway closure
A21 southbound Sevenoaks exit slip road closure
Planned Roadworks National HighwaysExpected to clear in 1 day 22 hours
A21 southbound Sevenoaks exit slip road closure
A628 eastbound Tintwistle Layby closure
Planned Roadworks National HighwaysExpected to clear in 1 day 23 hours
A628 eastbound Tintwistle Layby closure