Westbound lane 1 closure
PlannedWestbound lane 1 closure
- Start time
- Fri, Oct 30, 2026 7:00 PM
- Expected end
- Sat, Oct 31, 2026 6:00 AM
- Duration
- 11 hours
- Road
- A30 – A30 Westbound Between A39 Near Newquay (West) And A390
- Category
- Road Maintenance
- Direction
- Westbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Oct 13, 2026 8:57 AM
- Last updated
- Fri, Oct 30, 2026 8:44 AM
- Cleared
- Sat, Oct 31, 2026 6:00 AM
- Latest update: Westbound lane 1 closure
- Coordinates
- 50.293303, -5.141916
- Latitude span
- 50.290123 – 50.295403
- Longitude span
- -5.151106 – -5.134246
- Bounding box centre
- 50.292763, -5.142676
- Location descriptions
-
- A30 westbound between A39 near Newquay (west) and A390
- Feed validity status
- Planned
- Overall feed start
- Fri, Oct 30, 2026 7:00 PM
- Overall feed end
- Sat, Oct 31, 2026 6:00 AM
- Feed window length
- 11 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- A30 westbound between A39 near Newquay (west) and A390
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {82629235-809F-DEC8-4C4F-47B6681D4FB8}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 175 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.294711 -5.137429 50.294557 -5.138036 50.294278 -5.139128 50.294123 -5.139708
Segment 2
14 coordinate pairs- Description
- A30 westbound between A39 near Newquay (west) and A390
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {5DB0F285-E0D6-22B1-7C9D-DD0C4595540B}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 927 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.294123 -5.139708 50.294008 -5.140095 50.29384 -5.140697 50.293572 -5.141589 50.293312 -5.142404 50.293003 -5.143368 50.292813 -5.143922 50.292562 -5.144611 50.292094 -5.14596 50.291495 -5.147634 50.291177 -5.148518 50.290662 -5.14984 50.290258 -5.150808 50.290123 -5.151106
Segment 3
5 coordinate pairs- Description
- A30 westbound between A39 near Newquay (west) and A390
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {368844D0-4302-376C-FB00-E8E37AC42E18}
- Linear Element Type
- A Carriageway
- From Distance
- 881 m
- To Distance
- 1,121 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.295403 -5.134246 50.295299 -5.134806 50.295004 -5.136157 50.294845 -5.136866 50.294711 -5.137429
- Geometry type
- MultiLineString
- Geometry points
- 23
- First coordinate pair
- -5.137429, 50.294711
- Road section segments
- 1
- Road section points
- 23
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-5.137429,
50.294711
],
[
-5.138036,
50.294557
],
[
-5.139128,
50.294278
],
[
-5.139708,
50.294123
],
[
-5.139708,
50.294123
],
[
-5.140095,
50.294008
],
[
-5.140697,
50.29384
],
[
-5.141589,
50.293572
],
[
-5.142404,
50.293312
],
[
-5.143368,
50.293003
],
[
-5.143922,
50.292813
],
[
-5.144611,
50.292562
],
[
-5.14596,
50.292094
],
[
-5.147634,
50.291495
],
[
-5.148518,
50.291177
],
[
-5.14984,
50.290662
],
[
-5.150808,
50.290258
],
[
-5.151106,
50.290123
],
[
-5.134246,
50.295403
],
[
-5.134806,
50.295299
],
[
-5.136157,
50.295004
],
[
-5.136866,
50.294845
],
[
-5.137429,
50.294711
]
]
]
}
View road section coordinates
[
[
[
-5.137429,
50.294711
],
[
-5.138036,
50.294557
],
[
-5.139128,
50.294278
],
[
-5.139708,
50.294123
],
[
-5.139708,
50.294123
],
[
-5.140095,
50.294008
],
[
-5.140697,
50.29384
],
[
-5.141589,
50.293572
],
[
-5.142404,
50.293312
],
[
-5.143368,
50.293003
],
[
-5.143922,
50.292813
],
[
-5.144611,
50.292562
],
[
-5.14596,
50.292094
],
[
-5.147634,
50.291495
],
[
-5.148518,
50.291177
],
[
-5.14984,
50.290662
],
[
-5.150808,
50.290258
],
[
-5.151106,
50.290123
],
[
-5.134246,
50.295403
],
[
-5.134806,
50.295299
],
[
-5.136157,
50.295004
],
[
-5.136866,
50.294845
],
[
-5.137429,
50.294711
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed region label
- Newquay
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Tue, Oct 13, 2026 8:57 AM
- Record versioned
- Fri, Oct 30, 2026 8:44 AM
- Coordinate source
- Geometry
Driving on the A30? See every live closure, roadwork and planned restriction on this road.
A30 live closuresRelated incidents
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Planned Roadworks National HighwaysExpected to clear in 7 hours 32 minutes
A30 Both Directions Penzance to Exeter Mobile Lane Closures
A30 eastbound Layby closure 115/3-115/5
Planned Roadworks National HighwaysExpected to clear in 4 months 3 weeks
A30 eastbound Layby closure 115/3-115/5
A30 eastbound Summercourt to Highgate - carriageway closed
Planned Roadworks National HighwaysStarts in 9 hours 32 minutes
A30 eastbound Summercourt to Highgate - carriageway closed
A30 eastbound Alphington to M5 lane closure 194/8-195/8
Planned Roadworks National HighwaysStarts in 9 hours 32 minutes
A30 eastbound Alphington to M5 lane closure 194/8-195/8
A30 Eastbound Bodmin Bypass lane 2 closure 94/0b - 96/8b
Planned Roadworks National HighwaysStarts in 9 hours 32 minutes
A30 Eastbound Bodmin Bypass lane 2 closure 94/0b - 96/8b
A30 eastbound Sourton Cross to Okehampton lane 1 closure (155/4 to 158/6)
Planned Roadworks National HighwaysStarts in 8 hours 32 minutes
A30 eastbound Sourton Cross to Okehampton lane 1 closure (155/4 to 158/6)