Strensham Services southbound exit and entry slip road closure
ClearedStrensham Services southbound exit and entry slip road closure
- Start time
- Thu, May 7, 2026 8:00 PM
- Expected end
- Fri, May 8, 2026 5:00 AM
- Duration
- 9 hours
- Road
- M5 – M5 Southbound At The Strensham Services Slip Road Between J7 And J8
- Category
- Road Maintenance
- Direction
- Southbound
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, May 7, 2026 3:17 AM
- Last updated
- Thu, May 7, 2026 7:18 AM
- Cleared
- Fri, May 8, 2026 5:00 AM
- Latest update: Strensham Services southbound exit and entry slip road closure
- Coordinates
- 52.058882, -2.144291
- Latitude span
- 52.058416 – 52.059747
- Longitude span
- -2.145922 – -2.143378
- Bounding box centre
- 52.059082, -2.144650
- Location descriptions
-
- M5 southbound at the Strensham services slip road between J7 and J8
- Feed validity status
- Planned
- Overall feed start
- Thu, May 7, 2026 8:00 PM
- Overall feed end
- Fri, May 8, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M5 southbound at the Strensham services slip road between J7 and J8
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {3A99F4FB-BF29-434C-8672-F5173BC32891}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 73 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.058833 -2.144209 52.058663 -2.143917 52.058546 -2.143698 52.058483 -2.143552 52.058416 -2.143378
Segment 2
4 coordinate pairs- Description
- M5 southbound at the Strensham services slip road between J7 and J8
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {1C88B48A-ECAA-4CB7-8FE2-C5E401C90B5E}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 155 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.059747 -2.145922 52.059433 -2.145276 52.058986 -2.144458 52.058833 -2.144209
- Geometry type
- MultiLineString
- Geometry points
- 9
- First coordinate pair
- -2.144209, 52.058833
- Road section segments
- 1
- Road section points
- 9
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.144209,
52.058833
],
[
-2.143917,
52.058663
],
[
-2.143698,
52.058546
],
[
-2.143552,
52.058483
],
[
-2.143378,
52.058416
],
[
-2.145922,
52.059747
],
[
-2.145276,
52.059433
],
[
-2.144458,
52.058986
],
[
-2.144209,
52.058833
]
]
]
}
View road section coordinates
[
[
[
-2.144209,
52.058833
],
[
-2.143917,
52.058663
],
[
-2.143698,
52.058546
],
[
-2.143552,
52.058483
],
[
-2.143378,
52.058416
],
[
-2.145922,
52.059747
],
[
-2.145276,
52.059433
],
[
-2.144458,
52.058986
],
[
-2.144209,
52.058833
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, May 7, 2026 3:17 AM
- Record versioned
- Thu, May 7, 2026 7:18 AM
- Coordinate source
- Geometry
Driving on the M5? See every live closure, roadwork and planned restriction on this road.
M5 live closuresRelated incidents
A46 both directions A4184 Roundabout to Broadway carriageway closure
Planned Roadworks National HighwaysStarts in 18 hours 23 minutes
A46 both directions A4184 Roundabout to Broadway carriageway closure
A419 both directions Daglingworth Quarry to Cowley Junction - lane closure
Planned Roadworks National HighwaysStarts in 18 hours 23 minutes
A419 both directions Daglingworth Quarry to Cowley Junction - lane closure
Lanes 1 and 2 closure southbound (MP 38/5 to 39/9)
Planned Roadworks National HighwaysStarts in 18 hours 23 minutes
Lanes 1 and 2 closure southbound (MP 38/5 to 39/9)
Lanes 2 and 3 closure northbound
Planned Roadworks National HighwaysStarts in 18 hours 23 minutes
Lanes 2 and 3 closure northbound
M5 northbound Jct 25 to Jct 24 lane closure 204/6-199/6
Planned Roadworks National HighwaysStarts in 17 hours 23 minutes
M5 northbound Jct 25 to Jct 24 lane closure 204/6-199/6
Lane 1 closure north
Planned Roadworks National HighwaysStarts in 17 hours 23 minutes
lane 1 closure north