Mobile hardshoulder closure southbound
PlannedMobile hardshoulder closure southbound
- Start time
- Wed, Oct 28, 2026 8:00 AM
- Expected end
- Wed, Oct 28, 2026 4:00 PM
- Duration
- 8 hours
- Road
- M1 – M1 Southbound Between J27 And J26
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Sweeping Of Road
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Oct 27, 2026 1:42 PM
- Last updated
- Wed, Oct 28, 2026 1:02 AM
- Cleared
- Wed, Oct 28, 2026 4:00 PM
- Latest update: Mobile hardshoulder closure southbound
- Coordinates
- 53.007055, -1.235506
- Latitude span
- 53.002632 – 53.010227
- Longitude span
- -1.239271 – -1.231771
- Bounding box centre
- 53.006429, -1.235521
- Location descriptions
-
- M1 southbound between J27 and J26
- Feed validity status
- Planned
- Overall feed start
- Wed, Oct 28, 2026 8:00 AM
- Overall feed end
- Wed, Oct 28, 2026 4:00 PM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
9 coordinate pairs- Description
- M1 southbound between J27 and J26
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 5 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {6FEF1DD1-C7B4-4777-911E-FBA76ABE569E}
- Linear Element Type
- B Carriageway
- From Distance
- 568 m
- To Distance
- 799 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.010227 -1.239271 53.01004 -1.239042 53.009522 -1.238365 53.009207 -1.237932 53.009169 -1.23788 53.008897 -1.237469 53.008643 -1.237104 53.008626 -1.237079 53.008622 -1.237074
Segment 2
9 coordinate pairs- Description
- M1 southbound between J27 and J26
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 5 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {CAE64C34-D8DC-4C61-AD93-11737A1A116F}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 420 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.006118 -1.234155 53.005855 -1.233932 53.005613 -1.233713 53.005047 -1.233252 53.004677 -1.232969 53.004362 -1.232751 53.003723 -1.232349 53.003092 -1.231992 53.002632 -1.231771
Segment 3
7 coordinate pairs- Description
- M1 southbound between J27 and J26
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 5 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {F28AD847-929B-4DA4-A0EF-204ACAB8C738}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 341 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.008622 -1.237074 53.008154 -1.236429 53.007782 -1.235965 53.007579 -1.235726 53.007302 -1.235398 53.00675 -1.234803 53.006118 -1.234155
- Geometry type
- MultiLineString
- Geometry points
- 25
- First coordinate pair
- -1.239271, 53.010227
- Road section segments
- 1
- Road section points
- 25
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.239271,
53.010227
],
[
-1.239042,
53.01004
],
[
-1.238365,
53.009522
],
[
-1.237932,
53.009207
],
[
-1.23788,
53.009169
],
[
-1.237469,
53.008897
],
[
-1.237104,
53.008643
],
[
-1.237079,
53.008626
],
[
-1.237074,
53.008622
],
[
-1.234155,
53.006118
],
[
-1.233932,
53.005855
],
[
-1.233713,
53.005613
],
[
-1.233252,
53.005047
],
[
-1.232969,
53.004677
],
[
-1.232751,
53.004362
],
[
-1.232349,
53.003723
],
[
-1.231992,
53.003092
],
[
-1.231771,
53.002632
],
[
-1.237074,
53.008622
],
[
-1.236429,
53.008154
],
[
-1.235965,
53.007782
],
[
-1.235726,
53.007579
],
[
-1.235398,
53.007302
],
[
-1.234803,
53.00675
],
[
-1.234155,
53.006118
]
]
]
}
View road section coordinates
[
[
[
-1.239271,
53.010227
],
[
-1.239042,
53.01004
],
[
-1.238365,
53.009522
],
[
-1.237932,
53.009207
],
[
-1.23788,
53.009169
],
[
-1.237469,
53.008897
],
[
-1.237104,
53.008643
],
[
-1.237079,
53.008626
],
[
-1.237074,
53.008622
],
[
-1.234155,
53.006118
],
[
-1.233932,
53.005855
],
[
-1.233713,
53.005613
],
[
-1.233252,
53.005047
],
[
-1.232969,
53.004677
],
[
-1.232751,
53.004362
],
[
-1.232349,
53.003723
],
[
-1.231992,
53.003092
],
[
-1.231771,
53.002632
],
[
-1.237074,
53.008622
],
[
-1.236429,
53.008154
],
[
-1.235965,
53.007782
],
[
-1.235726,
53.007579
],
[
-1.235398,
53.007302
],
[
-1.234803,
53.00675
],
[
-1.234155,
53.006118
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Sweeping Of Road
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Oct 27, 2026 1:42 PM
- Record versioned
- Wed, Oct 28, 2026 1:02 AM
- Coordinate source
- Geometry
Driving on the M1? See every live closure, roadwork and planned restriction on this road.
M1 live closuresRelated incidents
M1 southbound Jct 35a entry slip road closure
Active Roadworks National HighwaysExpected to clear in 4 hours 7 minutes
M1 southbound Jct 35a entry slip road closure
Lane 3,4 closure northbound
Active Roadworks National HighwaysExpected to clear in 4 hours 7 minutes
Lane 3,4 closure northbound
Hardshoulder and lane 3 closure southbound
Planned Roadworks National HighwaysExpected to clear in 4 hours 7 minutes
Hardshoulder and lane 3 closure southbound
Lane closure eastbound
Active Roadworks National HighwaysExpected to clear in 1 month 2 days
Lane closure eastbound
M1 southbound Jct 37 to Jct 36 carriageway closure
Planned Roadworks National HighwaysStarts in 19 hours 7 minutes
M1 southbound Jct 37 to Jct 36 carriageway closure
M1 southbound Jct 12 exit slip road hard shoulder closure and lane 2 closure (MP 63/9 to 62/5)
Planned Roadworks National HighwaysStarts in 19 hours 7 minutes
M1 southbound Jct 12 exit slip road hard shoulder closure and lane 2 closure (MP 63/9 to 62/5)