M67 eastbound jct 3 entry slip road closure

Cleared

M67 eastbound jct 3 entry slip road closure

Start time
Thu, Sep 24, 2026 7:00 PM
Expected end
Fri, Sep 25, 2026 5:00 AM
Duration
9 hours 20 minutes 1 second
Road
M67 – M67 J3 Eastbound Access
Category
Construction Work
Direction
Eastbound
Reason
Road Improvement Or Upgrading
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Fri, Aug 21, 2026 4:32 AM
Last updated
Fri, Sep 25, 2026 3:49 AM
Cleared
Fri, Sep 25, 2026 4:20 AM
  • Latest update: M67 eastbound jct 3 entry slip road closure
Coordinates
53.453286, -2.076823
Latitude span
53.452996 – 53.453617
Longitude span
-2.078195 – -2.074917
Bounding box centre
53.453307, -2.076556
Location descriptions
  • M67 J3 eastbound access
Feed validity status
Planned
Overall feed start
Thu, Sep 24, 2026 7:00 PM
Overall feed end
Fri, Sep 25, 2026 5:00 AM
Feed window length
10 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
carriagewayClosures (Carriageway Closures)
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

3 coordinate pairs
Description
M67 J3 eastbound access
Lanes Restricted
2 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M67
Linear Element Model
The Network Model
Linear Element Id
{63014D71-017B-4603-9B46-EF545E3366F1}
Linear Element Type
A Carriageway Entry Slip
From Distance
0 m
To Distance
45 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.45361 -2.078195
53.453617 -2.078121
53.453449 -2.077588

Segment 2

7 coordinate pairs
Description
M67 J3 eastbound access
Lanes Restricted
2 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M67
Linear Element Model
The Network Model
Linear Element Id
{6ACE972A-901A-437A-BC95-4A96F08477ED}
Linear Element Type
A Carriageway Entry Slip
From Distance
0 m
To Distance
186 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.453449 -2.077588
53.45327 -2.07697
53.453216 -2.076759
53.453135 -2.076428
53.453082 -2.076097
53.453037 -2.075569
53.452996 -2.074917
Geometry type
MultiLineString
Geometry points
10
First coordinate pair
-2.078195, 53.453610
Road section segments
1
Road section points
10
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -2.078195,
                53.45361
            ],
            [
                -2.078121,
                53.453617
            ],
            [
                -2.077588,
                53.453449
            ],
            [
                -2.077588,
                53.453449
            ],
            [
                -2.07697,
                53.45327
            ],
            [
                -2.076759,
                53.453216
            ],
            [
                -2.076428,
                53.453135
            ],
            [
                -2.076097,
                53.453082
            ],
            [
                -2.075569,
                53.453037
            ],
            [
                -2.074917,
                53.452996
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -2.078195,
            53.45361
        ],
        [
            -2.078121,
            53.453617
        ],
        [
            -2.077588,
            53.453449
        ],
        [
            -2.077588,
            53.453449
        ],
        [
            -2.07697,
            53.45327
        ],
        [
            -2.076759,
            53.453216
        ],
        [
            -2.076428,
            53.453135
        ],
        [
            -2.076097,
            53.453082
        ],
        [
            -2.075569,
            53.453037
        ],
        [
            -2.074917,
            53.452996
        ]
    ]
]
Cause type
Construction Work
Detailed cause
Road Improvement Or Upgrading
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Carriageway Closures
Feed provider
National Highways
Data source
Roadworks
Feed version
2
Record created
Fri, Aug 21, 2026 4:32 AM
Record versioned
Fri, Sep 25, 2026 3:49 AM
Coordinate source
Geometry

Driving on the M67? See every live closure, roadwork and planned restriction on this road.

M67 live closures

Related incidents

M60 Clockwise lanes 1 and 2 closure (MP 38/1 to 40/3)

Cleared Roadworks National Highways
Tameside M60 · M60 Clockwise Between J20 And J21

Cleared 3 hours 34 minutes ago

Started 12 Oct 2026, 20:00 Ended 12 Oct 2026, 20:00

M60 Clockwise lanes 1 and 2 closure (MP 38/1 to 40/3)

Category: Road Maintenance
View update

M60 Clockwise lane 1 closure (MP 49/1 to 52/2)

Cleared Roadworks National Highways
Tameside M60 · M60 Clockwise Within J24

Cleared 2 hours 29 minutes ago

Started 12 Oct 2026, 20:00 Ended 12 Oct 2026, 21:05

M60 Clockwise lane 1 closure (MP 49/1 to 52/2)

Category: Construction Work
View update

M60 Clockwise lanes 1 and 2 closure (MP 41/1 to 43/5)

Cleared Roadworks National Highways
Tameside M60 · M60 Clockwise Within J22

Cleared 2 days 20 hours ago

Started 9 Oct 2026, 22:59 Ended 10 Oct 2026, 02:50

M60 Clockwise lanes 1 and 2 closure (MP 41/1 to 43/5)

Category: Road Maintenance
View update

M67 eastbound jct 3 entry slip road closure

Cleared Roadworks National Highways
Tameside M67 · M67 J3 Eastbound Access

Cleared 3 days 4 hours ago

Started 9 Oct 2026, 19:00 Ended 9 Oct 2026, 19:00

M67 eastbound jct 3 entry slip road closure

Category: Construction Work
View update

M67 eastbound jct 3 to 4 carriageway closure

Cleared Roadworks National Highways
Tameside M67 · M67 Eastbound Within J3

Cleared 3 days 4 hours ago

Started 9 Oct 2026, 19:00 Ended 9 Oct 2026, 19:00

M67 eastbound jct 3 to 4 carriageway closure

Category: Construction Work
View update

M60 clockwise jct 21 - 23 lane three closure (MP 41/0 - 45/8)

Cleared Roadworks National Highways
Tameside M60 · M60 Clockwise Within J22

Cleared 4 days 34 minutes ago

Started 8 Oct 2026, 22:59 Ended 8 Oct 2026, 23:00

M60 clockwise jct 21 - 23 lane three closure (MP 41/0 - 45/8)

Category: Road Maintenance
View update