M67 eastbound jct 3 entry slip road closure
PlannedM67 eastbound jct 3 entry slip road closure
- Start time
- Tue, Jul 7, 2026 7:00 PM
- Expected end
- Wed, Jul 8, 2026 5:00 AM
- Duration
- 10 hours
- Road
- M67 – M67 J3 Eastbound Access
- Category
- Construction Work
- Direction
- Eastbound
- Reason
- Road Improvement Or Upgrading
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Apr 7, 2026 8:16 AM
- Last updated
- Tue, Jul 7, 2026 9:45 AM
- Cleared
- Wed, Jul 8, 2026 5:00 AM
- Latest update: M67 eastbound jct 3 entry slip road closure
- Coordinates
- 53.453286, -2.076823
- Latitude span
- 53.452996 – 53.453617
- Longitude span
- -2.078195 – -2.074917
- Bounding box centre
- 53.453307, -2.076556
- Location descriptions
-
- M67 J3 eastbound access
- Feed validity status
- Planned
- Overall feed start
- Tue, Jul 7, 2026 7:00 PM
- Overall feed end
- Wed, Jul 8, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M67 J3 eastbound access
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M67
- Linear Element Model
- The Network Model
- Linear Element Id
- {63014D71-017B-4603-9B46-EF545E3366F1}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 45 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.45361 -2.078195 53.453617 -2.078121 53.453449 -2.077588
Segment 2
7 coordinate pairs- Description
- M67 J3 eastbound access
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M67
- Linear Element Model
- The Network Model
- Linear Element Id
- {6ACE972A-901A-437A-BC95-4A96F08477ED}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 186 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.453449 -2.077588 53.45327 -2.07697 53.453216 -2.076759 53.453135 -2.076428 53.453082 -2.076097 53.453037 -2.075569 53.452996 -2.074917
- Geometry type
- MultiLineString
- Geometry points
- 10
- First coordinate pair
- -2.078195, 53.453610
- Road section segments
- 1
- Road section points
- 10
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.078195,
53.45361
],
[
-2.078121,
53.453617
],
[
-2.077588,
53.453449
],
[
-2.077588,
53.453449
],
[
-2.07697,
53.45327
],
[
-2.076759,
53.453216
],
[
-2.076428,
53.453135
],
[
-2.076097,
53.453082
],
[
-2.075569,
53.453037
],
[
-2.074917,
53.452996
]
]
]
}
View road section coordinates
[
[
[
-2.078195,
53.45361
],
[
-2.078121,
53.453617
],
[
-2.077588,
53.453449
],
[
-2.077588,
53.453449
],
[
-2.07697,
53.45327
],
[
-2.076759,
53.453216
],
[
-2.076428,
53.453135
],
[
-2.076097,
53.453082
],
[
-2.075569,
53.453037
],
[
-2.074917,
53.452996
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Road Improvement Or Upgrading
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 7
- Record created
- Tue, Apr 7, 2026 8:16 AM
- Record versioned
- Tue, Jul 7, 2026 9:45 AM
- Coordinate source
- Geometry
Driving on the M67? See every live closure, roadwork and planned restriction on this road.
M67 live closuresRelated incidents
M67 Eastbound Lane 1 closure (MP 1/4 to 2/4)
Active Roadworks National HighwaysExpected to clear in 1 month 2 weeks
M67 Eastbound Lane 1 closure (MP 1/4 to 2/4)
M67 Eastbound Lane 3/narrow lanes closure 1/4 to 2/4
Planned Roadworks National HighwaysExpected to clear in 1 month 2 weeks
M67 Eastbound Lane 3/narrow lanes closure 1/4 to 2/4
M60 Clockwise lanes 3 and 4 closure (MP 43/5 to 45/6)
Planned Roadworks National HighwaysStarts in 4 hours 18 minutes
M60 Clockwise lanes 3 and 4 closure (MP 43/5 to 45/6)
M67 eastbound jct 3 to 4 carriageway closure
Planned Roadworks National HighwaysStarts in 3 hours 18 minutes
M67 eastbound jct 3 to 4 carriageway closure
M60 anticlockwise jct 23 exit slip road closure
Cleared Roadworks National HighwaysCleared 3 days 12 hours ago
M60 anticlockwise jct 23 exit slip road closure
M60 Clockwise Jct 22 to 23 carriageway closure
Cleared Roadworks National HighwaysCleared 3 days 19 hours ago
M60 Clockwise Jct 22 to 23 carriageway closure