M66 Southbound Jct 4 exit slip road lane 2 closure
ClearedM66 Southbound Jct 4 exit slip road lane 2 closure
- Start time
- Tue, Dec 16, 2025 8:00 PM
- Expected end
- Wed, Dec 17, 2025 6:00 AM
- Duration
- 10 hours
- Road
- M66 – M66 Southbound Exit For M60/M62
- Category
- Road Maintenance
- Direction
- Southbound
- Lanes affected
- Lane 2 closed, 1 of 2 lanes affected, 1 of 1 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Nov 19, 2025 11:57 PM
- Last updated
- Tue, Dec 16, 2025 10:29 PM
- Cleared
- Wed, Dec 17, 2025 6:00 AM
- Latest update: M66 Southbound Jct 4 exit slip road lane 2 closure
- Coordinates
- 53.551217, -2.261422
- Latitude span
- 53.550743 – 53.551845
- Longitude span
- -2.262256 – -2.260696
- Bounding box centre
- 53.551294, -2.261476
- Location descriptions
-
- M66 southbound exit for M60/M62
- M66 fast slip from M66 J4 southbound exit to M62 J18 eastbound access
- Feed validity status
- Planned
- Overall feed start
- Tue, Dec 16, 2025 8:00 PM
- Overall feed end
- Wed, Dec 17, 2025 6:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M66 southbound exit for M60/M62
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M66
- Linear Element Model
- The Network Model
- Linear Element Id
- {5C59AC30-B250-4C0D-99EE-3972A0E82AFC}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 161 m
- To Distance
- 236 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.551845 -2.262256 53.551619 -2.261967 53.551314 -2.261573
Segment 2
4 coordinate pairs- Description
- M66 fast slip from M66 J4 southbound exit to M62 J18 eastbound access
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M66
- Linear Element Model
- The Network Model
- Linear Element Id
- {A4CB59A1-0902-4D7A-A3A5-5312EA34C521}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 86 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.551314 -2.261573 53.550875 -2.260997 53.550812 -2.260891 53.550743 -2.260696
- Geometry type
- MultiLineString
- Geometry points
- 7
- First coordinate pair
- -2.262256, 53.551845
- Road section segments
- 1
- Road section points
- 7
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.262256,
53.551845
],
[
-2.261967,
53.551619
],
[
-2.261573,
53.551314
],
[
-2.261573,
53.551314
],
[
-2.260997,
53.550875
],
[
-2.260891,
53.550812
],
[
-2.260696,
53.550743
]
]
]
}
View road section coordinates
[
[
[
-2.262256,
53.551845
],
[
-2.261967,
53.551619
],
[
-2.261573,
53.551314
],
[
-2.261573,
53.551314
],
[
-2.260997,
53.550875
],
[
-2.260891,
53.550812
],
[
-2.260696,
53.550743
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 5
- Record created
- Wed, Nov 19, 2025 11:57 PM
- Record versioned
- Tue, Dec 16, 2025 10:29 PM
- Coordinate source
- Geometry
Driving on the M66? See every live closure, roadwork and planned restriction on this road.
M66 live closuresRelated incidents
M66 Southbound hardshoulder closure (MP 6/8 to 7/3)
Active Roadworks National HighwaysExpected to clear in 5 days 9 hours
M66 Southbound hardshoulder closure (MP 6/8 to 7/3)
M66 Mobile hardshoulder closure North & Southbound
Active Roadworks National HighwaysExpected to clear in 9 months 2 weeks
M66 Mobile hardshoulder closure North & Southbound
M66 Southbound Edenfield to Junction 1 Carriageway Closure
Planned Roadworks National HighwaysStarts in 1 hour 41 minutes
M66 Southbound Edenfield to Junction 1 Carriageway Closure
M60 Clockwise lanes 2, 3 and 4 closure (MP 32/8 to 33/6)
Cleared Roadworks National HighwaysCleared 4 days 13 hours ago
M60 Clockwise lanes 2, 3 and 4 closure (MP 32/8 to 33/6)
M66 Southbound hardshoulder closure (MP 13/4 to 32/3)
Cleared Roadworks National HighwaysCleared 1 day 13 hours ago
M66 Southbound hardshoulder closure (MP 13/4 to 32/3)
M66 Northbound lane 1 closure (MP 0/3 to 3/0)
Cleared Roadworks National HighwaysCleared 1 week 1 day ago
M66 Northbound lane 1 closure (MP 0/3 to 3/0)