M65 Eastbound lane 2 closure (MP 13/5 to 14/6)
ClearedM65 Eastbound lane 2 closure (MP 13/5 to 14/6)
- Start time
- Mon, Aug 10, 2026 8:00 PM
- Expected end
- Tue, Aug 11, 2026 4:00 AM
- Duration
- 2 seconds
- Road
- M65 – M65 Eastbound Between J4 And J5
- Category
- Construction Work
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 3 lanes affected, 1 of 2 lanes affected
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Jul 24, 2026 8:47 AM
- Last updated
- Mon, Aug 10, 2026 7:43 AM
- Cleared
- Mon, Aug 10, 2026 8:00 PM
- Latest update: M65 Eastbound lane 2 closure (MP 13/5 to 14/6)
- Coordinates
- 53.715696, -2.468618
- Latitude span
- 53.715389 – 53.716549
- Longitude span
- -2.478451 – -2.461831
- Bounding box centre
- 53.715969, -2.470141
- Location descriptions
-
- M65 eastbound between J4 and J5
- M65 eastbound within J4
- Feed validity status
- Planned
- Overall feed start
- Mon, Aug 10, 2026 8:00 PM
- Overall feed end
- Tue, Aug 11, 2026 4:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
17 coordinate pairs- Description
- M65 eastbound between J4 and J5
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M65
- Linear Element Model
- The Network Model
- Linear Element Id
- {48FFF938-CEE3-480B-A350-8E44A61B338A}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 583 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.715627 -2.470556 53.715505 -2.469479 53.715437 -2.468432 53.715421 -2.468099 53.715404 -2.467765 53.715389 -2.467114 53.71539 -2.46675 53.715392 -2.466174 53.715422 -2.465523 53.715463 -2.46481 53.71547 -2.464675 53.715526 -2.46407 53.715573 -2.463616 53.715647 -2.463041 53.715712 -2.462632 53.715785 -2.462194 53.71586 -2.461831
Segment 2
4 coordinate pairs- Description
- M65 eastbound between J4 and J5
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M65
- Linear Element Model
- The Network Model
- Linear Element Id
- {990C91B1-C762-43F8-8713-89ED10E8C3DF}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 76 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.71575 -2.471694 53.715696 -2.471193 53.715679 -2.471026 53.715627 -2.470556
Segment 3
6 coordinate pairs- Description
- M65 eastbound within J4
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M65
- Linear Element Model
- The Network Model
- Linear Element Id
- {B77B0544-17EA-4909-9CCA-9D07F5FDB275}
- Linear Element Type
- A Carriageway
- From Distance
- 4 m
- To Distance
- 459 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.716549 -2.478451 53.716444 -2.477505 53.716174 -2.475289 53.716098 -2.474683 53.715991 -2.473833 53.71575 -2.471694
- Geometry type
- MultiLineString
- Geometry points
- 27
- First coordinate pair
- -2.470556, 53.715627
- Road section segments
- 1
- Road section points
- 27
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.470556,
53.715627
],
[
-2.469479,
53.715505
],
[
-2.468432,
53.715437
],
[
-2.468099,
53.715421
],
[
-2.467765,
53.715404
],
[
-2.467114,
53.715389
],
[
-2.46675,
53.71539
],
[
-2.466174,
53.715392
],
[
-2.465523,
53.715422
],
[
-2.46481,
53.715463
],
[
-2.464675,
53.71547
],
[
-2.46407,
53.715526
],
[
-2.463616,
53.715573
],
[
-2.463041,
53.715647
],
[
-2.462632,
53.715712
],
[
-2.462194,
53.715785
],
[
-2.461831,
53.71586
],
[
-2.471694,
53.71575
],
[
-2.471193,
53.715696
],
[
-2.471026,
53.715679
],
[
-2.470556,
53.715627
],
[
-2.478451,
53.716549
],
[
-2.477505,
53.716444
],
[
-2.475289,
53.716174
],
[
-2.474683,
53.716098
],
[
-2.473833,
53.715991
],
[
-2.471694,
53.71575
]
]
]
}
View road section coordinates
[
[
[
-2.470556,
53.715627
],
[
-2.469479,
53.715505
],
[
-2.468432,
53.715437
],
[
-2.468099,
53.715421
],
[
-2.467765,
53.715404
],
[
-2.467114,
53.715389
],
[
-2.46675,
53.71539
],
[
-2.466174,
53.715392
],
[
-2.465523,
53.715422
],
[
-2.46481,
53.715463
],
[
-2.464675,
53.71547
],
[
-2.46407,
53.715526
],
[
-2.463616,
53.715573
],
[
-2.463041,
53.715647
],
[
-2.462632,
53.715712
],
[
-2.462194,
53.715785
],
[
-2.461831,
53.71586
],
[
-2.471694,
53.71575
],
[
-2.471193,
53.715696
],
[
-2.471026,
53.715679
],
[
-2.470556,
53.715627
],
[
-2.478451,
53.716549
],
[
-2.477505,
53.716444
],
[
-2.475289,
53.716174
],
[
-2.474683,
53.716098
],
[
-2.473833,
53.715991
],
[
-2.471694,
53.71575
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Jul 24, 2026 8:47 AM
- Record versioned
- Mon, Aug 10, 2026 7:43 AM
- Coordinate source
- Geometry
Driving on the M65? See every live closure, roadwork and planned restriction on this road.
M65 live closuresRelated incidents
M65 Eastbound Jct 2 exit slip road lane 1 closure
Planned Roadworks National HighwaysExpected to clear in 7 hours 22 minutes
M65 Eastbound Jct 2 exit slip road lane 1 closure
M65 Eastbound lane 1 closure (MP 4/9 to 6/9)
Active Roadworks National HighwaysExpected to clear in 7 hours 22 minutes
M65 Eastbound lane 1 closure (MP 4/9 to 6/9)
M65 East and Westbound Jct 5 slips and approach roads - 24 hr narrow lanes, speed restrictions and carriageway closures
Planned Roadworks National HighwaysExpected to clear in 1 year 3 weeks
M65 East and Westbound Jct 5 slips and approach roads - 24 hr narrow lanes, speed restrictions and carriageway closures
M65 Eastbound lane 2 closure (MP 13/5 to 17/4)
Cleared Roadworks National HighwaysCleared 1 hour 37 minutes ago
M65 Eastbound lane 2 closure (MP 13/5 to 17/4)
M65 Eastbound lane 2 closure (MP 13/5 to 17/4)
Cleared Roadworks National HighwaysCleared 37 minutes 25 seconds ago
M65 Eastbound lane 2 closure (MP 13/5 to 17/4)
M65 Eastbound lane 1 closure (MP 4/9 to 6/9)
Cleared Roadworks National HighwaysCleared 2 hours 12 minutes ago
M65 Eastbound lane 1 closure (MP 4/9 to 6/9)