M65 Eastbound lane 1 closure (MP 6/9 to 7/5)
PlannedM65 Eastbound lane 1 closure (MP 6/9 to 7/5)
- Start time
- Fri, Jan 9, 2026 9:00 PM
- Expected end
- Sat, Jan 10, 2026 5:00 AM
- Duration
- 8 hours
- Road
- M65 – M65 Eastbound Within J3
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 2 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Dec 17, 2025 1:51 PM
- Last updated
- Fri, Jan 9, 2026 8:01 PM
- Cleared
- Sat, Jan 10, 2026 5:00 AM
- Latest update: M65 Eastbound lane 1 closure (MP 6/9 to 7/5)
- Coordinates
- 53.716158, -2.571225
- Latitude span
- 53.716099 – 53.716282
- Longitude span
- -2.577185 – -2.568423
- Bounding box centre
- 53.716191, -2.572804
- Location descriptions
-
- M65 eastbound within J3
- M65 eastbound between J2 and J3
- Feed validity status
- Planned
- Overall feed start
- Fri, Jan 9, 2026 9:00 PM
- Overall feed end
- Sat, Jan 10, 2026 5:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M65 eastbound within J3
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M65
- Linear Element Model
- The Network Model
- Linear Element Id
- {9130D04E-2359-42B7-BA47-C9D7B45B0E8B}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 27 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.716108 -2.56884 53.716099 -2.568423
Segment 2
4 coordinate pairs- Description
- M65 eastbound between J2 and J3
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M65
- Linear Element Model
- The Network Model
- Linear Element Id
- {67D1EF4C-135A-4216-A483-DF3F4E1652C9}
- Linear Element Type
- A Carriageway
- From Distance
- 539 m
- To Distance
- 1,090 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.716282 -2.577185 53.716232 -2.574857 53.716116 -2.569203 53.716108 -2.56884
- Geometry type
- MultiLineString
- Geometry points
- 6
- First coordinate pair
- -2.568840, 53.716108
- Road section segments
- 1
- Road section points
- 6
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.56884,
53.716108
],
[
-2.568423,
53.716099
],
[
-2.577185,
53.716282
],
[
-2.574857,
53.716232
],
[
-2.569203,
53.716116
],
[
-2.56884,
53.716108
]
]
]
}
View road section coordinates
[
[
[
-2.56884,
53.716108
],
[
-2.568423,
53.716099
],
[
-2.577185,
53.716282
],
[
-2.574857,
53.716232
],
[
-2.569203,
53.716116
],
[
-2.56884,
53.716108
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Dec 17, 2025 1:51 PM
- Record versioned
- Fri, Jan 9, 2026 8:01 PM
- Coordinate source
- Geometry
Related incidents
M6 Northbound lanes 2 and 3 closure (MP 342/9 to 344/3)
Planned National HighwaysM6 Northbound lanes 2 and 3 closure (MP 342/9 to 344/3)
M65 East and Westbound Jct 5 slips and approach roads - 24 hr narrow lanes, speed restrictions and carriageway closures
Planned National HighwaysM65 East and Westbound Jct 5 slips and approach roads - 24 hr narrow lanes, speed restrictions and carriageway closures
M6 Northbound lanes 2 and 3 closure (MP 342/9 to 344/3)
Planned National HighwaysM6 Northbound lanes 2 and 3 closure (MP 342/9 to 344/3)
M65 Westbound Jct 5 exit slip Lane closure road
Planned National HighwaysM65 Westbound Jct 5 exit slip Lane closure road
M65 Westbound Jct 5 exit slip Lane closure road
Planned National HighwaysM65 Westbound Jct 5 exit slip Lane closure road
M65 Westbound Jct 5 exit slip Lane closure road
Cleared National HighwaysM65 Westbound Jct 5 exit slip Lane closure road