M65 Eastbound Hardshoulder closure (MP 8/4 to 9/8)
ActiveM65 Eastbound Hardshoulder closure (MP 8/4 to 9/8)
- Start time
- Mon, Nov 2, 2026 7:54 AM
- Expected end
- Mon, Nov 2, 2026 5:00 PM
- Duration
- 9 hours 6 minutes
- Road
- M65 – M65 Eastbound Between J3 And J4
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Nov 2, 2026 7:54 AM
- Last updated
- Mon, Nov 2, 2026 10:30 AM
- Cleared
- Mon, Nov 2, 2026 5:00 PM
- Latest update: M65 Eastbound Hardshoulder closure (MP 8/4 to 9/8)
- Coordinates
- 53.715539, -2.548015
- Latitude span
- 53.715011 – 53.715820
- Longitude span
- -2.555306 – -2.541184
- Bounding box centre
- 53.715416, -2.548245
- Location descriptions
-
- M65 eastbound between J3 and J4
- Feed validity status
- Active
- Overall feed start
- Mon, Nov 2, 2026 7:54 AM
- Overall feed end
- Mon, Nov 2, 2026 5:00 PM
- Feed window length
- 9 hours 6 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
12 coordinate pairs- Description
- M65 eastbound between J3 and J4
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M65
- Linear Element Model
- The Network Model
- Linear Element Id
- {D7F470F4-5478-4422-A46A-4BE6BA8C3508}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 855 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.715794 -2.55406 53.715718 -2.550439 53.715708 -2.549985 53.715696 -2.549394 53.715655 -2.548393 53.715606 -2.547408 53.715572 -2.546953 53.715521 -2.546209 53.715368 -2.544404 53.715205 -2.542751 53.715075 -2.541658 53.715011 -2.541184
Segment 2
2 coordinate pairs- Description
- M65 eastbound between J3 and J4
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M65
- Linear Element Model
- The Network Model
- Linear Element Id
- {E963E000-BB26-420A-BDD1-CADC720A320E}
- Linear Element Type
- A Carriageway
- From Distance
- 113 m
- To Distance
- 196 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.71582 -2.555306 53.715794 -2.55406
- Geometry type
- MultiLineString
- Geometry points
- 14
- First coordinate pair
- -2.554060, 53.715794
- Road section segments
- 1
- Road section points
- 14
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.55406,
53.715794
],
[
-2.550439,
53.715718
],
[
-2.549985,
53.715708
],
[
-2.549394,
53.715696
],
[
-2.548393,
53.715655
],
[
-2.547408,
53.715606
],
[
-2.546953,
53.715572
],
[
-2.546209,
53.715521
],
[
-2.544404,
53.715368
],
[
-2.542751,
53.715205
],
[
-2.541658,
53.715075
],
[
-2.541184,
53.715011
],
[
-2.555306,
53.71582
],
[
-2.55406,
53.715794
]
]
]
}
View road section coordinates
[
[
[
-2.55406,
53.715794
],
[
-2.550439,
53.715718
],
[
-2.549985,
53.715708
],
[
-2.549394,
53.715696
],
[
-2.548393,
53.715655
],
[
-2.547408,
53.715606
],
[
-2.546953,
53.715572
],
[
-2.546209,
53.715521
],
[
-2.544404,
53.715368
],
[
-2.542751,
53.715205
],
[
-2.541658,
53.715075
],
[
-2.541184,
53.715011
],
[
-2.555306,
53.71582
],
[
-2.55406,
53.715794
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Nov 2, 2026 7:54 AM
- Record versioned
- Mon, Nov 2, 2026 10:30 AM
- Coordinate source
- Geometry
Driving on the M65? See every live closure, roadwork and planned restriction on this road.
M65 live closuresRelated incidents
M65 Eastbound Jct 5 entry slip road lane closure
Active Roadworks National HighwaysExpected to clear in 4 hours 35 minutes
M65 Eastbound Jct 5 entry slip road lane closure
M65 Eastbound Jct 5 exit slip road lane closure
Active Roadworks National HighwaysExpected to clear in 4 hours 35 minutes
M65 Eastbound Jct 5 exit slip road lane closure
M61 Southbound to M65 Eastbound link road closure
Planned Roadworks National HighwaysStarts in 12 hours 5 minutes
M61 Southbound to M65 Eastbound link road closure
M65 Eastbound lane 2 closure (MP 4/4 to 8/1)
Planned Roadworks National HighwaysStarts in 10 hours 5 minutes
M65 Eastbound lane 2 closure (MP 4/4 to 8/1)
M65 Eastbound Jct 5 exit slip road lane closure
Planned Roadworks National HighwaysStarts in 10 hours 5 minutes
M65 Eastbound Jct 5 exit slip road lane closure
M65 eastbound lanes 2 and 3 closure (MP 26/5 to 28/8)
Planned Roadworks National HighwaysStarts in 9 hours 5 minutes
M65 eastbound lanes 2 and 3 closure (MP 26/5 to 28/8)