M65 Eastbound hardshoulder closure (MP 0/7 to 1/1)
PlannedM65 Eastbound hardshoulder closure (MP 0/7 to 1/1)
- Start time
- Tue, Feb 17, 2026 9:00 AM
- Expected end
- Tue, Feb 17, 2026 5:00 PM
- Duration
- 8 hours
- Road
- M65 – M65 Eastbound Within J1
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Feb 16, 2026 9:05 AM
- Last updated
- Tue, Feb 17, 2026 6:40 AM
- Cleared
- Tue, Feb 17, 2026 5:00 PM
- Latest update: M65 Eastbound hardshoulder closure (MP 0/7 to 1/1)
- Coordinates
- 53.716966, -2.667001
- Latitude span
- 53.716203 – 53.717448
- Longitude span
- -2.669300 – -2.663444
- Bounding box centre
- 53.716826, -2.666372
- Location descriptions
-
- M65 eastbound within J1
- M65 eastbound between J1A and J1
- Feed validity status
- Planned
- Overall feed start
- Tue, Feb 17, 2026 9:00 AM
- Overall feed end
- Tue, Feb 17, 2026 5:00 PM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M65 eastbound within J1
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M65
- Linear Element Model
- The Network Model
- Linear Element Id
- {3CB947BF-D622-4D10-8C13-BEA2D58BEF14}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 115 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.717367 -2.668839 53.717056 -2.667391 53.717012 -2.667193
Segment 2
4 coordinate pairs- Description
- M65 eastbound within J1
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M65
- Linear Element Model
- The Network Model
- Linear Element Id
- {2D7585C5-22B0-41C5-89F3-F863CC77C43A}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 263 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.717012 -2.667193 53.716467 -2.6647 53.716337 -2.664107 53.716203 -2.663444
Segment 3
3 coordinate pairs- Description
- M65 eastbound between J1A and J1
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M65
- Linear Element Model
- The Network Model
- Linear Element Id
- {A83782A4-8719-44D8-B7EA-686258C73C0F}
- Linear Element Type
- A Carriageway
- From Distance
- 335 m
- To Distance
- 367 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.717448 -2.6693 53.717394 -2.669002 53.717367 -2.668839
- Geometry type
- MultiLineString
- Geometry points
- 10
- First coordinate pair
- -2.668839, 53.717367
- Road section segments
- 1
- Road section points
- 10
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.668839,
53.717367
],
[
-2.667391,
53.717056
],
[
-2.667193,
53.717012
],
[
-2.667193,
53.717012
],
[
-2.6647,
53.716467
],
[
-2.664107,
53.716337
],
[
-2.663444,
53.716203
],
[
-2.6693,
53.717448
],
[
-2.669002,
53.717394
],
[
-2.668839,
53.717367
]
]
]
}
View road section coordinates
[
[
[
-2.668839,
53.717367
],
[
-2.667391,
53.717056
],
[
-2.667193,
53.717012
],
[
-2.667193,
53.717012
],
[
-2.6647,
53.716467
],
[
-2.664107,
53.716337
],
[
-2.663444,
53.716203
],
[
-2.6693,
53.717448
],
[
-2.669002,
53.717394
],
[
-2.668839,
53.717367
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Feb 16, 2026 9:05 AM
- Record versioned
- Tue, Feb 17, 2026 6:40 AM
- Coordinate source
- Geometry
Related incidents
M6 Northbound lanes 2 and 3 closure (MP 342/9 to 344/3)
Planned National HighwaysM6 Northbound lanes 2 and 3 closure (MP 342/9 to 344/3)
M65 East and Westbound Jct 5 slips and approach roads - 24 hr narrow lanes, speed restrictions and carriageway closures
Planned National HighwaysM65 East and Westbound Jct 5 slips and approach roads - 24 hr narrow lanes, speed restrictions and carriageway closures
M6 Northbound lanes 2 and 3 closure (MP 342/9 to 344/3)
Planned National HighwaysM6 Northbound lanes 2 and 3 closure (MP 342/9 to 344/3)
M65 Westbound Jct 5 exit slip Lane closure road
Planned National HighwaysM65 Westbound Jct 5 exit slip Lane closure road
M65 Westbound Jct 5 exit slip Lane closure road
Planned National HighwaysM65 Westbound Jct 5 exit slip Lane closure road
M65 Westbound Jct 5 exit slip Lane closure road
Cleared National HighwaysM65 Westbound Jct 5 exit slip Lane closure road