M62 westbound Jct 30 entry slip road closure

Cleared

M62 westbound Jct 30 entry slip road closure

Start time
Fri, Jun 26, 2026 7:00 PM
Expected end
Sat, Jun 27, 2026 5:00 AM
Duration
9 hours 2 seconds
Road
M62 – M62 J30 Westbound Access
Category
Road Maintenance
Direction
Westbound
Reason
Maintenance Work
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Fri, Jun 5, 2026 12:40 PM
Last updated
Sat, Jun 27, 2026 3:43 AM
Cleared
Sat, Jun 27, 2026 4:00 AM
  • Latest update: M62 westbound Jct 30 entry slip road closure
Coordinates
53.727990, -1.460615
Latitude span
53.727828 – 53.728267
Longitude span
-1.464995 – -1.459172
Bounding box centre
53.728048, -1.462084
Location descriptions
  • M62 J30 westbound access
  • roundabout at M62 J30/A642
Feed validity status
Planned
Overall feed start
Fri, Jun 26, 2026 7:00 PM
Overall feed end
Sat, Jun 27, 2026 5:00 AM
Feed window length
10 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
carriagewayClosures (Carriageway Closures)
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

6 coordinate pairs
Description
M62 J30 westbound access
Lanes Restricted
1 lane restricted
Operational Lanes
0 operational lanes
Direction On Section
West Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M62
Linear Element Model
The Network Model
Linear Element Id
{F4752DCF-C448-46E4-B9E7-C23810D2BBE9}
Linear Element Type
B Carriageway Entry Slip
From Distance
0 m
To Distance
386 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.727854 -1.45921
53.727918 -1.459421
53.727991 -1.459724
53.728029 -1.460072
53.728177 -1.463116
53.728267 -1.464995

Segment 2

2 coordinate pairs
Description
roundabout at M62 J30/A642
Lanes Restricted
2 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
Clockwise
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A642
Linear Element Model
The Network Model
Linear Element Id
{01AB271F-CAE5-4CDF-97EA-7DDECABD2B05}
Linear Element Type
Other
From Distance
28 m
To Distance
31 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.727828 -1.459172
53.727854 -1.45921
Geometry type
MultiLineString
Geometry points
8
First coordinate pair
-1.459210, 53.727854
Road section segments
1
Road section points
8
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -1.45921,
                53.727854
            ],
            [
                -1.459421,
                53.727918
            ],
            [
                -1.459724,
                53.727991
            ],
            [
                -1.460072,
                53.728029
            ],
            [
                -1.463116,
                53.728177
            ],
            [
                -1.464995,
                53.728267
            ],
            [
                -1.459172,
                53.727828
            ],
            [
                -1.45921,
                53.727854
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -1.45921,
            53.727854
        ],
        [
            -1.459421,
            53.727918
        ],
        [
            -1.459724,
            53.727991
        ],
        [
            -1.460072,
            53.728029
        ],
        [
            -1.463116,
            53.728177
        ],
        [
            -1.464995,
            53.728267
        ],
        [
            -1.459172,
            53.727828
        ],
        [
            -1.45921,
            53.727854
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Maintenance Work
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Carriageway Closures
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Fri, Jun 5, 2026 12:40 PM
Record versioned
Sat, Jun 27, 2026 3:43 AM
Coordinate source
Geometry

Driving on the M62? See every live closure, roadwork and planned restriction on this road.

M62 live closures

Related incidents

M62 eastbound Jct 36 to Jct 37 Lane 1 and 2 closure (161/3 162/7)

Active Roadworks National Highways
East Riding Of Yorkshire M62 · M62 Eastbound Between J36 And J37

Expected to clear in 9 hours 3 minutes

Started 7 Jul 2026, 19:00 Expected clear 8 Jul 2026, 05:00

M62 eastbound Jct 36 to Jct 37 Lane 1 and 2 closure (161/3 162/7)

Category: Construction Work
View update

M62 eastbound taper mp 110.1

Planned Roadworks National Highways
Wakefield M62 · M62 Eastbound Between J27 And J28

Expected to clear in 9 hours 3 minutes

Started 7 Jul 2026, 18:00 Expected clear 8 Jul 2026, 05:00

m62 eastbound taper mp 110.1

Category: Road Maintenance
View update

M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)

Active Roadworks National Highways
Oldham M62 · M62 Eastbound Between J20 And J21

Expected to clear in 3 months 3 days

Started 2 Oct 2025, 05:00 Expected clear 10 Oct 2026, 20:00

M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)

Category: Road Maintenance
View update

M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)

Planned Roadworks National Highways
St. Helens M62 · M62 Eastbound Within J10 Before M6 J21A Northbound Access

Starts in 33 minutes 10 seconds

Starts 7 Jul 2026, 20:30 Expected clear 8 Jul 2026, 05:00

M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)

Category: Road Maintenance
View update

M62 eastbound Jct 25 Lane 2 3 closure (95/4 95/9)

Cleared Roadworks National Highways
Calderdale M62 · M62 Eastbound Within J25

Cleared 51 minutes 48 seconds ago

Started 7 Jul 2026, 19:00 Ended 7 Jul 2026, 19:05

M62 eastbound Jct 25 Lane 2 3 closure (95/4 95/9)

Category: Road Maintenance
View update

M62 westbound jct 29 entry slip carriageway closure

Cleared Roadworks National Highways
Wakefield M62 · M62 Westbound Within J29 After M1 J42 Northbound Access

Cleared 56 minutes 48 seconds ago

Started 7 Jul 2026, 19:00 Ended 7 Jul 2026, 19:00

m62 westbound jct 29 entry slip carriageway closure

Category: Road Maintenance
View update