M62 westbound Jct 29 to M1 southbound Jct 42 Lane closure
ClearedM62 westbound Jct 29 to M1 southbound Jct 42 Lane closure
- Start time
- Wed, Aug 5, 2026 7:05 PM
- Expected end
- Thu, Aug 6, 2026 5:00 AM
- Duration
- 7 hours 30 minutes 1 second
- Road
- M62 – M62 J29 Westbound Exit
- Category
- Road Maintenance
- Direction
- Westbound
- Lanes affected
- Lane 1 closed, 1 of 2 lanes affected, 1 of 1 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Aug 6, 2026 2:00 AM
- Last updated
- Thu, Aug 6, 2026 2:17 AM
- Cleared
- Thu, Aug 6, 2026 2:35 AM
- Latest update: M62 westbound Jct 29 to M1 southbound Jct 42 Lane closure
- Coordinates
- 53.729512, -1.510613
- Latitude span
- 53.728479 – 53.729843
- Longitude span
- -1.512550 – -1.508303
- Bounding box centre
- 53.729161, -1.510427
- Location descriptions
-
- M62 J29 westbound exit
- M1 J42 southbound access
- fast slip from M62 J29 to M1 J42 southbound access
- Feed validity status
- Active
- Overall feed start
- Wed, Aug 5, 2026 7:05 PM
- Overall feed end
- Thu, Aug 6, 2026 5:00 AM
- Feed window length
- 9 hours 55 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M62 J29 westbound exit
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {7C8148CA-CF45-4091-ACF5-B15CBE004182}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 298 m
- To Distance
- 355 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.729699 -1.508303 53.729766 -1.508705 53.729807 -1.508944 53.729839 -1.509128
Segment 2
3 coordinate pairs- Description
- M1 J42 southbound access
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {D8C98EE0-735C-4C31-A0C5-5F4F8A17F9DA}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 78 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.729096 -1.511987 53.728531 -1.512496 53.728479 -1.51255
Segment 3
12 coordinate pairs- Description
- fast slip from M62 J29 to M1 J42 southbound access
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {FFAF5E22-9992-4476-B78D-58BB260B5FAE}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 218 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.729839 -1.509128 53.729843 -1.509977 53.729826 -1.510281 53.729809 -1.510417 53.729782 -1.510524 53.729747 -1.510691 53.729658 -1.510995 53.729623 -1.511101 53.729552 -1.511254 53.729418 -1.511513 53.72932 -1.511666 53.729096 -1.511987
- Geometry type
- MultiLineString
- Geometry points
- 19
- First coordinate pair
- -1.508303, 53.729699
- Road section segments
- 1
- Road section points
- 19
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.508303,
53.729699
],
[
-1.508705,
53.729766
],
[
-1.508944,
53.729807
],
[
-1.509128,
53.729839
],
[
-1.511987,
53.729096
],
[
-1.512496,
53.728531
],
[
-1.51255,
53.728479
],
[
-1.509128,
53.729839
],
[
-1.509977,
53.729843
],
[
-1.510281,
53.729826
],
[
-1.510417,
53.729809
],
[
-1.510524,
53.729782
],
[
-1.510691,
53.729747
],
[
-1.510995,
53.729658
],
[
-1.511101,
53.729623
],
[
-1.511254,
53.729552
],
[
-1.511513,
53.729418
],
[
-1.511666,
53.72932
],
[
-1.511987,
53.729096
]
]
]
}
View road section coordinates
[
[
[
-1.508303,
53.729699
],
[
-1.508705,
53.729766
],
[
-1.508944,
53.729807
],
[
-1.509128,
53.729839
],
[
-1.511987,
53.729096
],
[
-1.512496,
53.728531
],
[
-1.51255,
53.728479
],
[
-1.509128,
53.729839
],
[
-1.509977,
53.729843
],
[
-1.510281,
53.729826
],
[
-1.510417,
53.729809
],
[
-1.510524,
53.729782
],
[
-1.510691,
53.729747
],
[
-1.510995,
53.729658
],
[
-1.511101,
53.729623
],
[
-1.511254,
53.729552
],
[
-1.511513,
53.729418
],
[
-1.511666,
53.72932
],
[
-1.511987,
53.729096
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Aug 6, 2026 2:00 AM
- Record versioned
- Thu, Aug 6, 2026 2:17 AM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
Active Roadworks National HighwaysExpected to clear in 2 months 4 days
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
A1 northbound Darrington entry slip road closure
Planned Roadworks National HighwaysStarts in 14 hours 36 minutes
A1 northbound Darrington entry slip road closure
M62 Eastbound lanes 1 and 2 closure (MP 38/0 to 43/7)
Planned Roadworks National HighwaysStarts in 12 hours 6 minutes
M62 Eastbound lanes 1 and 2 closure (MP 38/0 to 43/7)
M62 Eastbound to M60 Clockwise link Carriageway closure
Planned Roadworks National HighwaysStarts in 12 hours 6 minutes
M62 Eastbound to M60 Clockwise link Carriageway closure
M62 eastbound Jct 22 to Jct 23 Lane 1 closure (78/5 81/0)
Cleared Roadworks National HighwaysExpected to clear in 21 hours 6 minutes
M62 eastbound Jct 22 to Jct 23 Lane 1 closure (78/5 81/0)
M62 westbound Jct 37 entry slip lane closure
Planned Roadworks National HighwaysStarts in 11 hours 6 minutes
M62 westbound Jct 37 entry slip lane closure