M62 eatbound hard shoulder closure mp 115.0 to mp 115.5
Clearedm62 eatbound hard shoulder closure mp 115.0 to mp 115.5
- Start time
- Tue, Dec 9, 2025 6:00 AM
- Expected end
- Tue, Dec 9, 2025 7:00 PM
- Duration
- 13 hours
- Road
- M62 – M62 Eastbound Between J28 And J29
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Dec 4, 2025 2:25 PM
- Last updated
- Mon, Dec 8, 2025 11:09 PM
- Cleared
- Tue, Dec 9, 2025 7:00 PM
- Latest update: m62 eatbound hard shoulder closure mp 115.0 to mp 115.5
- Coordinates
- 53.733306, -1.523138
- Latitude span
- 53.732908 – 53.733910
- Longitude span
- -1.526796 – -1.520711
- Bounding box centre
- 53.733409, -1.523754
- Location descriptions
-
- M62 eastbound between J28 and J29
- M62 eastbound within J29 after M1 J42 southbound exit
- Feed validity status
- Planned
- Overall feed start
- Tue, Dec 9, 2025 6:00 AM
- Overall feed end
- Tue, Dec 9, 2025 7:00 PM
- Feed window length
- 13 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M62 eastbound between J28 and J29
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {75704AE8-6E24-4FCB-B6F6-A2A3BB776083}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 29 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.733066 -1.521811 53.73298 -1.521388
Segment 2
8 coordinate pairs- Description
- M62 eastbound between J28 and J29
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {AFAC3E7A-9423-4A38-81C2-1FF8DC669693}
- Linear Element Type
- A Carriageway
- From Distance
- 2,296 m
- To Distance
- 2,638 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.73391 -1.526796 53.73379 -1.525939 53.733725 -1.525485 53.733648 -1.524888 53.733355 -1.523264 53.733154 -1.522255 53.73309 -1.521922 53.733066 -1.521811
Segment 3
2 coordinate pairs- Description
- M62 eastbound within J29 after M1 J42 southbound exit
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {52D6E064-B2A8-4328-8084-F25995954DD2}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 45 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.73298 -1.521388 53.732908 -1.520711
- Geometry type
- MultiLineString
- Geometry points
- 12
- First coordinate pair
- -1.521811, 53.733066
- Road section segments
- 1
- Road section points
- 12
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.521811,
53.733066
],
[
-1.521388,
53.73298
],
[
-1.526796,
53.73391
],
[
-1.525939,
53.73379
],
[
-1.525485,
53.733725
],
[
-1.524888,
53.733648
],
[
-1.523264,
53.733355
],
[
-1.522255,
53.733154
],
[
-1.521922,
53.73309
],
[
-1.521811,
53.733066
],
[
-1.521388,
53.73298
],
[
-1.520711,
53.732908
]
]
]
}
View road section coordinates
[
[
[
-1.521811,
53.733066
],
[
-1.521388,
53.73298
],
[
-1.526796,
53.73391
],
[
-1.525939,
53.73379
],
[
-1.525485,
53.733725
],
[
-1.524888,
53.733648
],
[
-1.523264,
53.733355
],
[
-1.522255,
53.733154
],
[
-1.521922,
53.73309
],
[
-1.521811,
53.733066
],
[
-1.521388,
53.73298
],
[
-1.520711,
53.732908
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Dec 4, 2025 2:25 PM
- Record versioned
- Mon, Dec 8, 2025 11:09 PM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 Eastbound Jct 11 exit slip road lane 1 closure
Active Roadworks National HighwaysExpected to clear in 1 week 4 days
M62 Eastbound Jct 11 exit slip road lane 1 closure
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
Active Roadworks National HighwaysExpected to clear in 3 months 3 weeks
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
M62 Westbound Jct 11 exit slip road closure
Planned Roadworks National HighwaysStarts in 13 hours 22 minutes
M62 Westbound Jct 11 exit slip road closure
M62 eastbound Jct 26 to Jct 27 lane 3 and 4 closure (101/6 to 103/4)
Planned Roadworks National HighwaysStarts in 12 hours 22 minutes
M62 eastbound Jct 26 to Jct 27 lane 3 and 4 closure (101/6 to 103/4)
M62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)
Planned Roadworks National HighwaysStarts in 12 hours 22 minutes
M62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)
M62 eastbound Jct 37 to Jct 38 Lane 1 closure (164/5 - 166/5)
Planned Roadworks National HighwaysStarts in 12 hours 22 minutes
M62 eastbound Jct 37 to Jct 38 Lane 1 closure (164/5 - 166/5)