M62 Eastbound Lane 3 closure (MP 46/6 to 45/3)
ClearedM62 Eastbound Lane 3 closure (MP 46/6 to 45/3)
- Start time
- Thu, Mar 26, 2026 9:00 PM
- Expected end
- Fri, Mar 27, 2026 5:00 AM
- Duration
- 8 hours
- Road
- M56 – M56 Eastbound Between J14 And J12
- Category
- Construction Work
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 3 closed, 1 of 3 lanes affected
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Mar 26, 2026 8:24 PM
- Last updated
- Thu, Mar 26, 2026 8:48 PM
- Cleared
- Fri, Mar 27, 2026 5:00 AM
- Latest update: M62 Eastbound Lane 3 closure (MP 46/6 to 45/3)
- Coordinates
- 53.296611, -2.733563
- Latitude span
- 53.294760 – 53.298390
- Longitude span
- -2.737644 – -2.729635
- Bounding box centre
- 53.296575, -2.733640
- Location descriptions
-
- M56 eastbound between J14 and J12
- Feed validity status
- Planned
- Overall feed start
- Thu, Mar 26, 2026 9:00 PM
- Overall feed end
- Fri, Mar 27, 2026 5:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
6 coordinate pairs- Description
- M56 eastbound between J14 and J12
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl3
- Lane Number
- 3
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M56
- Linear Element Model
- The Network Model
- Linear Element Id
- {0036AA7A-A9C5-429C-8740-90677E980E48}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 405 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.296193 -2.734496 53.296712 -2.733364 53.296791 -2.733186 53.297351 -2.731911 53.29787 -2.730728 53.29839 -2.729635
Segment 2
3 coordinate pairs- Description
- M56 eastbound between J14 and J12
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl3
- Lane Number
- 3
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M56
- Linear Element Model
- The Network Model
- Linear Element Id
- {6C213F2B-3F3D-4C25-9474-DFC3A8761EE8}
- Linear Element Type
- B Carriageway
- From Distance
- 495 m
- To Distance
- 759 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.29476 -2.737644 53.295236 -2.73661 53.296193 -2.734496
- Geometry type
- MultiLineString
- Geometry points
- 9
- First coordinate pair
- -2.734496, 53.296193
- Road section segments
- 1
- Road section points
- 9
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.734496,
53.296193
],
[
-2.733364,
53.296712
],
[
-2.733186,
53.296791
],
[
-2.731911,
53.297351
],
[
-2.730728,
53.29787
],
[
-2.729635,
53.29839
],
[
-2.737644,
53.29476
],
[
-2.73661,
53.295236
],
[
-2.734496,
53.296193
]
]
]
}
View road section coordinates
[
[
[
-2.734496,
53.296193
],
[
-2.733364,
53.296712
],
[
-2.733186,
53.296791
],
[
-2.731911,
53.297351
],
[
-2.730728,
53.29787
],
[
-2.729635,
53.29839
],
[
-2.737644,
53.29476
],
[
-2.73661,
53.295236
],
[
-2.734496,
53.296193
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Mar 26, 2026 8:24 PM
- Record versioned
- Thu, Mar 26, 2026 8:48 PM
- Coordinate source
- Geometry
Driving on the M56? See every live closure, roadwork and planned restriction on this road.
M56 live closuresRelated incidents
M56 Eastbound hardshoulder closure (MP 55/0 to 54/6)
Active Roadworks National HighwaysExpected to clear in 2 weeks 22 hours
M56 Eastbound hardshoulder closure (MP 55/0 to 54/6)
A483 : Southbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 08/06/26-19/06/26 1900-0600 :
Active Roadworks Traffic WalesDescription: A483 : Southbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 08/06/26-19/06/26 1900-0600 :, Start time: 08/06/2026 19:00 , End Date: 19/06/2026 6:00, Severity: Road closure, Source: Welsh Government, Last updated: 12/06/2026 13:46
A483 : Northbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 15/06/26-19/06/26 1900-0600 :
Active Roadworks Traffic WalesDescription: A483 : Northbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 15/06/26-19/06/26 1900-0600 :, Start time: 15/06/2026 19:00 , End Date: 19/06/2026 6:00, Severity: Road closure, Source: Welsh Government, Last updated: 12/06/2026 13:48
M53 Southbound lane 2 closure (MP 27/0 to 31/8)
Planned Roadworks National HighwaysStarts in 14 hours 22 minutes
M53 Southbound lane 2 closure (MP 27/0 to 31/8)
A556/M56 Westbound hardshoulder Lane 1 closure (MP 7/5 to 6/4)
Planned Roadworks National HighwaysStarts in 13 hours 22 minutes
A556/M56 Westbound hardshoulder Lane 1 closure (MP 7/5 to 6/4)
A55 Westbound Jct 38 entry slip road Lane 1 closure
Planned Roadworks National HighwaysStarts in 13 hours 22 minutes
A55 Westbound Jct 38 entry slip road Lane 1 closure