M62 Eastbound lane 1 closure (MP 35/4 to 36/3)

Cleared

M62 Eastbound lane 1 closure (MP 35/4 to 36/3)

Start time
Fri, Oct 2, 2026 7:47 PM
Expected end
Sat, Oct 3, 2026 4:00 AM
Duration
8 hours 13 minutes
Road
M62 – M62 Eastbound Between J11 And J12
Category
Road Maintenance
Direction
Eastbound
Carriageway
Dual Carriageway
Lanes affected
Lane 1 closed, 1 of 3 lanes affected
Reason
Other
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Fri, Oct 2, 2026 7:47 PM
Last updated
Sat, Oct 3, 2026 3:38 AM
Cleared
Sat, Oct 3, 2026 4:00 AM
  • Latest update: M62 Eastbound lane 1 closure (MP 35/4 to 36/3)
Coordinates
53.440079, -2.463387
Latitude span
53.438948 – 53.441148
Longitude span
-2.469433 – -2.457643
Bounding box centre
53.440048, -2.463538
Location descriptions
  • M62 eastbound between J11 and J12
Feed validity status
Active
Overall feed start
Fri, Oct 2, 2026 7:47 PM
Overall feed end
Sat, Oct 3, 2026 4:00 AM
Feed window length
8 hours 13 minutes
Probability code (raw)
certain
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
other
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

3 coordinate pairs
Description
M62 eastbound between J11 and J12
Carriageway
Dual Carriageway
Lane Usage
Cl1
Lane Number
1
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
3 operational lanes
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M62
Linear Element Model
The Network Model
Linear Element Id
{AEDDD681-679E-42F3-853A-60ADB4EF6CD4}
Linear Element Type
A Carriageway
From Distance
69 m
To Distance
416 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.438948 -2.469433
53.43919 -2.468128
53.439886 -2.464456

Segment 2

5 coordinate pairs
Description
M62 eastbound between J11 and J12
Carriageway
Dual Carriageway
Lane Usage
Cl1
Lane Number
1
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
3 operational lanes
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M62
Linear Element Model
The Network Model
Linear Element Id
{DC7D92B1-831D-4169-9B18-3075BC5ECDEA}
Linear Element Type
A Carriageway
From Distance
0 m
To Distance
473 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.439886 -2.464456
53.440062 -2.463486
53.440659 -2.460286
53.440852 -2.459204
53.441148 -2.457643
Geometry type
MultiLineString
Geometry points
8
First coordinate pair
-2.469433, 53.438948
Road section segments
1
Road section points
8
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -2.469433,
                53.438948
            ],
            [
                -2.468128,
                53.43919
            ],
            [
                -2.464456,
                53.439886
            ],
            [
                -2.464456,
                53.439886
            ],
            [
                -2.463486,
                53.440062
            ],
            [
                -2.460286,
                53.440659
            ],
            [
                -2.459204,
                53.440852
            ],
            [
                -2.457643,
                53.441148
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -2.469433,
            53.438948
        ],
        [
            -2.468128,
            53.43919
        ],
        [
            -2.464456,
            53.439886
        ],
        [
            -2.464456,
            53.439886
        ],
        [
            -2.463486,
            53.440062
        ],
        [
            -2.460286,
            53.440659
        ],
        [
            -2.459204,
            53.440852
        ],
        [
            -2.457643,
            53.441148
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Other
Compliance
Mandatory
Probability
Certain
Validity status
Active
Road management
Other
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Fri, Oct 2, 2026 7:47 PM
Record versioned
Sat, Oct 3, 2026 3:38 AM
Coordinate source
Geometry

Driving on the M62? See every live closure, roadwork and planned restriction on this road.

M62 live closures

Related incidents

M602 Eastbound lane 3 closure (MP 2/5 to 3/7)

Active Roadworks National Highways
Salford M602 · M602 Eastbound Within J2

Expected to clear in 8 hours 39 minutes

Started 12 Oct 2026, 19:41 Expected clear 13 Oct 2026, 05:00

M602 Eastbound lane 3 closure (MP 2/5 to 3/7)

Category: Road Maintenance
View update

M602 Eastbound hardshoulder closure (MP 4/8 to 6/4)

Active Roadworks National Highways
Salford M602 · M602 Eastbound Between J2 And J3

Expected to clear in 1 week 3 days

Started 11 Oct 2026, 12:38 Expected clear 23 Oct 2026, 16:00

M602 Eastbound hardshoulder closure (MP 4/8 to 6/4)

Category: Road Maintenance
View update

M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)

Active Roadworks National Highways
St. Helens M62 · M62 Eastbound Between J6 And J7

Expected to clear in 1 year 5 months

Started 31 Mar 2026, 23:01 Expected clear 31 Mar 2028, 22:59

M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)

Category: Road Maintenance
View update

M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)

Planned Roadworks National Highways
St. Helens M62 · M62 J9 Eastbound Access

Starts in 39 minutes 17 seconds

Starts 12 Oct 2026, 21:00 Expected clear 13 Oct 2026, 05:00

M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)

Category: Road Maintenance
View update

M62 eastbound Jct 29 carriageway closure between exit and entry slip road

Planned Roadworks National Highways
Wakefield M62 · M62 Eastbound Between J29 And J30

Starts in 39 minutes 17 seconds

Starts 12 Oct 2026, 21:00 Expected clear 13 Oct 2026, 04:00

M62 eastbound Jct 29 carriageway closure between exit and entry slip road

Category: Road Maintenance
View update

M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)

Active Roadworks National Highways
Wakefield M62 · M62 Eastbound Within J29 After M1 J42 Southbound Exit

Starts in 39 minutes 17 seconds

Starts 12 Oct 2026, 21:00 Expected clear 13 Oct 2026, 04:00

M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)

Category: Road Maintenance
View update