M62 Eastbound lane 1 closure (MP 35/4 to 36/3)
ClearedM62 Eastbound lane 1 closure (MP 35/4 to 36/3)
- Start time
- Fri, Oct 2, 2026 8:00 PM
- Expected end
- Sat, Oct 3, 2026 4:00 AM
- Duration
- 2 seconds
- Road
- M62 – M62 Eastbound Between J11 And J12
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 3 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Oct 2, 2026 11:46 AM
- Last updated
- Fri, Oct 2, 2026 7:27 PM
- Cleared
- Fri, Oct 2, 2026 8:00 PM
- Latest update: M62 Eastbound lane 1 closure (MP 35/4 to 36/3)
- Coordinates
- 53.440079, -2.463387
- Latitude span
- 53.438948 – 53.441148
- Longitude span
- -2.469433 – -2.457643
- Bounding box centre
- 53.440048, -2.463538
- Location descriptions
-
- M62 eastbound between J11 and J12
- Feed validity status
- Planned
- Overall feed start
- Fri, Oct 2, 2026 8:00 PM
- Overall feed end
- Sat, Oct 3, 2026 4:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M62 eastbound between J11 and J12
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {AEDDD681-679E-42F3-853A-60ADB4EF6CD4}
- Linear Element Type
- A Carriageway
- From Distance
- 69 m
- To Distance
- 416 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.438948 -2.469433 53.43919 -2.468128 53.439886 -2.464456
Segment 2
5 coordinate pairs- Description
- M62 eastbound between J11 and J12
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {DC7D92B1-831D-4169-9B18-3075BC5ECDEA}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 473 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.439886 -2.464456 53.440062 -2.463486 53.440659 -2.460286 53.440852 -2.459204 53.441148 -2.457643
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- -2.469433, 53.438948
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.469433,
53.438948
],
[
-2.468128,
53.43919
],
[
-2.464456,
53.439886
],
[
-2.464456,
53.439886
],
[
-2.463486,
53.440062
],
[
-2.460286,
53.440659
],
[
-2.459204,
53.440852
],
[
-2.457643,
53.441148
]
]
]
}
View road section coordinates
[
[
[
-2.469433,
53.438948
],
[
-2.468128,
53.43919
],
[
-2.464456,
53.439886
],
[
-2.464456,
53.439886
],
[
-2.463486,
53.440062
],
[
-2.460286,
53.440659
],
[
-2.459204,
53.440852
],
[
-2.457643,
53.441148
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Oct 2, 2026 11:46 AM
- Record versioned
- Fri, Oct 2, 2026 7:27 PM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M602 Eastbound lane 3 closure (MP 2/5 to 3/7)
Active Roadworks National HighwaysExpected to clear in 8 hours 39 minutes
M602 Eastbound lane 3 closure (MP 2/5 to 3/7)
M602 Eastbound hardshoulder closure (MP 4/8 to 6/4)
Active Roadworks National HighwaysExpected to clear in 1 week 3 days
M602 Eastbound hardshoulder closure (MP 4/8 to 6/4)
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 5 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)
Planned Roadworks National HighwaysStarts in 39 minutes 18 seconds
M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)
M62 eastbound Jct 29 carriageway closure between exit and entry slip road
Planned Roadworks National HighwaysStarts in 39 minutes 18 seconds
M62 eastbound Jct 29 carriageway closure between exit and entry slip road
M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)
Active Roadworks National HighwaysStarts in 39 minutes 18 seconds
M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)