M62 Eastbound Jct 8 entry slip road closure
ClearedM62 Eastbound Jct 8 entry slip road closure
- Start time
- Thu, Jul 23, 2026 8:40 PM
- Expected end
- Fri, Jul 24, 2026 4:00 AM
- Duration
- 1 hour 1 second
- Road
- M62 – M62 J8 Eastbound Access After Services Slip Road
- Category
- Road Maintenance
- Direction
- Eastbound
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Jul 23, 2026 8:40 PM
- Last updated
- Thu, Jul 23, 2026 9:08 PM
- Cleared
- Thu, Jul 23, 2026 9:40 PM
- Latest update: M62 Eastbound Jct 8 entry slip road closure
- Coordinates
- 53.416131, -2.644059
- Latitude span
- 53.415980 – 53.416367
- Longitude span
- -2.646028 – -2.641291
- Bounding box centre
- 53.416174, -2.643660
- Location descriptions
-
- M62 J8 eastbound access after services slip road
- M62 J8 eastbound access before services slip road
- Feed validity status
- Active
- Overall feed start
- Thu, Jul 23, 2026 8:40 PM
- Overall feed end
- Fri, Jul 24, 2026 4:00 AM
- Feed window length
- 7 hours 20 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M62 J8 eastbound access after services slip road
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {E44B7715-971D-4C0B-B4F7-F5253320D240}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 202 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.416094 -2.644306 53.41623 -2.642826 53.416347 -2.641463 53.416367 -2.641291
Segment 2
5 coordinate pairs- Description
- M62 J8 eastbound access before services slip road
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {2E82063A-7717-4E62-96AD-D49C624EED9F}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 3 m
- To Distance
- 120 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.416047 -2.646028 53.41598 -2.64577 53.415995 -2.645447 53.416027 -2.645092 53.416094 -2.644306
- Geometry type
- MultiLineString
- Geometry points
- 9
- First coordinate pair
- -2.644306, 53.416094
- Road section segments
- 1
- Road section points
- 9
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.644306,
53.416094
],
[
-2.642826,
53.41623
],
[
-2.641463,
53.416347
],
[
-2.641291,
53.416367
],
[
-2.646028,
53.416047
],
[
-2.64577,
53.41598
],
[
-2.645447,
53.415995
],
[
-2.645092,
53.416027
],
[
-2.644306,
53.416094
]
]
]
}
View road section coordinates
[
[
[
-2.644306,
53.416094
],
[
-2.642826,
53.41623
],
[
-2.641463,
53.416347
],
[
-2.641291,
53.416367
],
[
-2.646028,
53.416047
],
[
-2.64577,
53.41598
],
[
-2.645447,
53.415995
],
[
-2.645092,
53.416027
],
[
-2.644306,
53.416094
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Jul 23, 2026 8:40 PM
- Record versioned
- Thu, Jul 23, 2026 9:08 PM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M6 Northbound and Southbound mobile hardshoulder closure (MP 290/5 - 346/6)
Active Roadworks National HighwaysExpected to clear in 1 year 7 months
M6 Northbound and Southbound mobile hardshoulder closure (MP 290/5 - 346/6)
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 7 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
Active Roadworks National HighwaysExpected to clear in 2 months 6 days
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
M62 Eastbound lanes 1 and 2 closure (MP 35/0 to 39/5)
Planned Roadworks National HighwaysStarts in 5 hours 54 minutes
M62 Eastbound lanes 1 and 2 closure (MP 35/0 to 39/5)
M62 westbound Jct 37 entry slip lane closure
Planned Roadworks National HighwaysStarts in 4 hours 54 minutes
M62 westbound Jct 37 entry slip lane closure
M62 eastbound Jct 27 entry slip road closure
Planned Roadworks National HighwaysStarts in 4 hours 54 minutes
M62 eastbound Jct 27 entry slip road closure