M62 Eastbound Jct 7 exit slip road lane 1 closure
ClearedM62 Eastbound Jct 7 exit slip road lane 1 closure
- Start time
- Fri, Jun 12, 2026 7:00 PM
- Expected end
- Sat, Jun 13, 2026 4:00 AM
- Duration
- 5 hours 30 minutes 1 second
- Road
- M62 – M62 J7 Eastbound Exit
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected, 1 of 3 lanes affected
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Jun 1, 2026 9:27 AM
- Last updated
- Sat, Jun 13, 2026 12:10 AM
- Cleared
- Sat, Jun 13, 2026 12:30 AM
- Latest update: M62 Eastbound Jct 7 exit slip road lane 1 closure
- Coordinates
- 53.401707, -2.755365
- Latitude span
- 53.400396 – 53.403443
- Longitude span
- -2.765098 – -2.747675
- Bounding box centre
- 53.401920, -2.756387
- Location descriptions
-
- M62 J7 eastbound exit
- M62 eastbound between J6 and J7
- Feed validity status
- Planned
- Overall feed start
- Fri, Jun 12, 2026 7:00 PM
- Overall feed end
- Sat, Jun 13, 2026 4:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
13 coordinate pairs- Description
- M62 J7 eastbound exit
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {1D38F333-A8B2-45F3-8BB0-2AC3DC6E49F4}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 755 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.400901 -2.758167 53.40126 -2.756475 53.401561 -2.754764 53.401718 -2.754015 53.401829 -2.753491 53.402079 -2.752427 53.402345 -2.751365 53.402684 -2.750066 53.402886 -2.749359 53.403283 -2.748001 53.403367 -2.747804 53.403429 -2.747696 53.403443 -2.747675
Segment 2
8 coordinate pairs- Description
- M62 eastbound between J6 and J7
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {153C640C-58D9-4EC0-9D1C-9F9DC45361DE}
- Linear Element Type
- A Carriageway
- From Distance
- 65 m
- To Distance
- 529 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.400396 -2.765098 53.40046 -2.763799 53.400541 -2.762417 53.400591 -2.761726 53.40063 -2.76117 53.400727 -2.759999 53.400815 -2.758978 53.400901 -2.758167
- Geometry type
- MultiLineString
- Geometry points
- 21
- First coordinate pair
- -2.758167, 53.400901
- Road section segments
- 1
- Road section points
- 21
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.758167,
53.400901
],
[
-2.756475,
53.40126
],
[
-2.754764,
53.401561
],
[
-2.754015,
53.401718
],
[
-2.753491,
53.401829
],
[
-2.752427,
53.402079
],
[
-2.751365,
53.402345
],
[
-2.750066,
53.402684
],
[
-2.749359,
53.402886
],
[
-2.748001,
53.403283
],
[
-2.747804,
53.403367
],
[
-2.747696,
53.403429
],
[
-2.747675,
53.403443
],
[
-2.765098,
53.400396
],
[
-2.763799,
53.40046
],
[
-2.762417,
53.400541
],
[
-2.761726,
53.400591
],
[
-2.76117,
53.40063
],
[
-2.759999,
53.400727
],
[
-2.758978,
53.400815
],
[
-2.758167,
53.400901
]
]
]
}
View road section coordinates
[
[
[
-2.758167,
53.400901
],
[
-2.756475,
53.40126
],
[
-2.754764,
53.401561
],
[
-2.754015,
53.401718
],
[
-2.753491,
53.401829
],
[
-2.752427,
53.402079
],
[
-2.751365,
53.402345
],
[
-2.750066,
53.402684
],
[
-2.749359,
53.402886
],
[
-2.748001,
53.403283
],
[
-2.747804,
53.403367
],
[
-2.747696,
53.403429
],
[
-2.747675,
53.403443
],
[
-2.765098,
53.400396
],
[
-2.763799,
53.40046
],
[
-2.762417,
53.400541
],
[
-2.761726,
53.400591
],
[
-2.76117,
53.40063
],
[
-2.759999,
53.400727
],
[
-2.758978,
53.400815
],
[
-2.758167,
53.400901
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Jun 1, 2026 9:27 AM
- Record versioned
- Sat, Jun 13, 2026 12:10 AM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 9 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
Active Roadworks National HighwaysExpected to clear in 3 months 3 weeks
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
M62 Eastbound lanes 1 and 2 closure (MP 38/1 to 39/3))
Planned Roadworks National HighwaysStarts in 18 hours 45 minutes
M62 Eastbound lanes 1 and 2 closure (MP 38/1 to 39/3))
M62 Eastbound lanes 1 and 2 closure (MP 64/5 to 66/0)
Cleared Roadworks National HighwaysCleared 5 hours 14 minutes ago
M62 Eastbound lanes 1 and 2 closure (MP 64/5 to 66/0)
M57 Southbound to M62 Eastbound lane 1 closure
Cleared Roadworks National HighwaysCleared 1 hour 14 minutes ago
M57 Southbound to M62 Eastbound lane 1 closure
M62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)
Cleared Roadworks National HighwaysCleared 1 hour 14 minutes ago
M62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)