M62 eastbound Jct 38 exit slip road closure
ClearedM62 eastbound Jct 38 exit slip road closure
- Start time
- Thu, Nov 19, 2026 8:00 PM
- Expected end
- Fri, Nov 20, 2026 6:00 AM
- Duration
- 9 hours 50 minutes 2 seconds
- Road
- M62 – Connector At M62 J38/A63
- Category
- Road Maintenance
- Direction
- Eastbound
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Jul 27, 2026 8:19 AM
- Last updated
- Fri, Nov 20, 2026 5:32 AM
- Cleared
- Fri, Nov 20, 2026 5:50 AM
- Latest update: M62 eastbound Jct 38 exit slip road closure
- Coordinates
- 53.771395, -0.678647
- Latitude span
- 53.771219 – 53.771684
- Longitude span
- -0.682582 – -0.675325
- Bounding box centre
- 53.771452, -0.678954
- Location descriptions
-
- connector at M62 J38/A63
- M62 J38 eastbound exit
- Feed validity status
- Planned
- Overall feed start
- Thu, Nov 19, 2026 8:00 PM
- Overall feed end
- Fri, Nov 20, 2026 6:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- connector at M62 J38/A63
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {AF63EBF0-672F-4C45-B391-D86DC68B868C}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 94 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.771499 -0.67672 53.77159 -0.675973 53.771684 -0.675325
Segment 2
7 coordinate pairs- Description
- M62 J38 eastbound exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {1183667C-3334-4040-B234-603215DF3C94}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 156 m
- To Distance
- 544 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.771219 -0.682582 53.771223 -0.68234 53.771249 -0.680849 53.771271 -0.679625 53.771322 -0.678577 53.771394 -0.677755 53.771499 -0.67672
- Geometry type
- MultiLineString
- Geometry points
- 10
- First coordinate pair
- -0.676720, 53.771499
- Road section segments
- 1
- Road section points
- 10
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.67672,
53.771499
],
[
-0.675973,
53.77159
],
[
-0.675325,
53.771684
],
[
-0.682582,
53.771219
],
[
-0.68234,
53.771223
],
[
-0.680849,
53.771249
],
[
-0.679625,
53.771271
],
[
-0.678577,
53.771322
],
[
-0.677755,
53.771394
],
[
-0.67672,
53.771499
]
]
]
}
View road section coordinates
[
[
[
-0.67672,
53.771499
],
[
-0.675973,
53.77159
],
[
-0.675325,
53.771684
],
[
-0.682582,
53.771219
],
[
-0.68234,
53.771223
],
[
-0.680849,
53.771249
],
[
-0.679625,
53.771271
],
[
-0.678577,
53.771322
],
[
-0.677755,
53.771394
],
[
-0.67672,
53.771499
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Jul 27, 2026 8:19 AM
- Record versioned
- Fri, Nov 20, 2026 5:32 AM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 Westbound Jct 20 exit slip road hard shoulder and lane 1 closure
Planned Roadworks National HighwaysExpected to clear in 2 months 15 hours
M62 Westbound Jct 20 exit slip road hard shoulder and lane 1 closure
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 4 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 Eastbound lane 3 closure (MP 64/4 to 66/6)
Cleared Roadworks National HighwaysCleared 18 hours 2 minutes ago
M62 Eastbound lane 3 closure (MP 64/4 to 66/6)
M62 eastbound Jct 34 to Jct 35 lane 3 closure (150/7-151/5)
Cleared Roadworks National HighwaysCleared 1 day 12 hours ago
M62 eastbound Jct 34 to Jct 35 lane 3 closure (150/7-151/5)
M62 eastbound Jct 22 to Jct 23 lane 1 and 2 closure (74/1 - 76/8)
Cleared Roadworks National HighwaysCleared 1 day 13 hours ago
M62 eastbound Jct 22 to Jct 23 lane 1 and 2 closure (74/1 - 76/8)
M62 westbound Jct 37 entry slip lane closure
Cleared Roadworks National HighwaysCleared 1 day 9 hours ago
M62 westbound Jct 37 entry slip lane closure