M62 eastbound Jct 37 to Jct 38 lane 2 closure (176/0 176/9)
ClearedM62 eastbound Jct 37 to Jct 38 lane 2 closure (176/0 176/9)
- Start time
- Wed, Sep 30, 2026 7:00 PM
- Expected end
- Thu, Oct 1, 2026 5:00 AM
- Duration
- 9 hours 55 minutes 1 second
- Road
- M62 – M62 Eastbound Between J37 And J38
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 3 lanes affected, 1 of 2 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Sep 29, 2026 7:08 AM
- Last updated
- Thu, Oct 1, 2026 4:31 AM
- Cleared
- Thu, Oct 1, 2026 4:55 AM
- Latest update: M62 eastbound Jct 37 to Jct 38 lane 2 closure (176/0 176/9)
- Coordinates
- 53.771058, -0.685764
- Latitude span
- 53.770653 – 53.771177
- Longitude span
- -0.692853 – -0.678947
- Bounding box centre
- 53.770915, -0.685900
- Location descriptions
-
- M62 eastbound between J37 and J38
- M62 eastbound within J38
- Feed validity status
- Planned
- Overall feed start
- Wed, Sep 30, 2026 7:00 PM
- Overall feed end
- Thu, Oct 1, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
7 coordinate pairs- Description
- M62 eastbound between J37 and J38
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {F39FBDC0-E140-4689-8586-A8C00864BEEA}
- Linear Element Type
- A Carriageway
- From Distance
- 1,429 m
- To Distance
- 1,824 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.770653 -0.692853 53.7707 -0.692403 53.77079 -0.691505 53.770878 -0.690592 53.770997 -0.689071 53.771096 -0.687475 53.771117 -0.686913
Segment 2
7 coordinate pairs- Description
- M62 eastbound within J38
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {6FE57018-A5C7-48A2-8A49-1A3EBD9A9CA9}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 396 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.771177 -0.684956 53.771159 -0.682449 53.771158 -0.682341 53.771154 -0.681209 53.771139 -0.680504 53.771113 -0.679979 53.771065 -0.678947
Segment 3
6 coordinate pairs- Description
- M62 eastbound between J37 and J38
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {ABA1C33E-F476-46D1-B224-57331C8C4DF3}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 129 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.771117 -0.686913 53.771154 -0.686032 53.77116 -0.685895 53.77117 -0.685273 53.771177 -0.685014 53.771177 -0.684956
- Geometry type
- MultiLineString
- Geometry points
- 20
- First coordinate pair
- -0.692853, 53.770653
- Road section segments
- 1
- Road section points
- 20
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.692853,
53.770653
],
[
-0.692403,
53.7707
],
[
-0.691505,
53.77079
],
[
-0.690592,
53.770878
],
[
-0.689071,
53.770997
],
[
-0.687475,
53.771096
],
[
-0.686913,
53.771117
],
[
-0.684956,
53.771177
],
[
-0.682449,
53.771159
],
[
-0.682341,
53.771158
],
[
-0.681209,
53.771154
],
[
-0.680504,
53.771139
],
[
-0.679979,
53.771113
],
[
-0.678947,
53.771065
],
[
-0.686913,
53.771117
],
[
-0.686032,
53.771154
],
[
-0.685895,
53.77116
],
[
-0.685273,
53.77117
],
[
-0.685014,
53.771177
],
[
-0.684956,
53.771177
]
]
]
}
View road section coordinates
[
[
[
-0.692853,
53.770653
],
[
-0.692403,
53.7707
],
[
-0.691505,
53.77079
],
[
-0.690592,
53.770878
],
[
-0.689071,
53.770997
],
[
-0.687475,
53.771096
],
[
-0.686913,
53.771117
],
[
-0.684956,
53.771177
],
[
-0.682449,
53.771159
],
[
-0.682341,
53.771158
],
[
-0.681209,
53.771154
],
[
-0.680504,
53.771139
],
[
-0.679979,
53.771113
],
[
-0.678947,
53.771065
],
[
-0.686913,
53.771117
],
[
-0.686032,
53.771154
],
[
-0.685895,
53.77116
],
[
-0.685273,
53.77117
],
[
-0.685014,
53.771177
],
[
-0.684956,
53.771177
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Sep 29, 2026 7:08 AM
- Record versioned
- Thu, Oct 1, 2026 4:31 AM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 eastbound Jct 25 hardshoulder closure (94/6 - 95/3)
Active Roadworks National HighwaysExpected to clear in 1 week 6 days
M62 eastbound Jct 25 hardshoulder closure (94/6 - 95/3)
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 5 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)
Planned Roadworks National HighwaysStarts in 3 hours 14 minutes
M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)
M62 eastbound Jct 29 carriageway closure between exit and entry slip road
Planned Roadworks National HighwaysStarts in 3 hours 14 minutes
M62 eastbound Jct 29 carriageway closure between exit and entry slip road
M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)
Planned Roadworks National HighwaysStarts in 3 hours 14 minutes
M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)
M62 eastbound lane 3 closure with switching (MP 69/0 to 71/8)
Planned Roadworks National HighwaysStarts in 2 hours 14 minutes
M62 eastbound lane 3 closure with switching (MP 69/0 to 71/8)