M62 eastbound Jct 35 hardshoulder closure ( 155/5 155/8)
ClearedM62 eastbound Jct 35 hardshoulder closure ( 155/5 155/8)
- Start time
- Sat, Aug 15, 2026 8:00 AM
- Expected end
- Sat, Aug 15, 2026 2:00 PM
- Duration
- 6 hours
- Road
- M62 – M62 Eastbound Within J35
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Aug 12, 2026 5:51 AM
- Last updated
- Sat, Aug 15, 2026 12:07 AM
- Cleared
- Sat, Aug 15, 2026 2:00 PM
- Latest update: M62 eastbound Jct 35 hardshoulder closure ( 155/5 155/8)
- Coordinates
- 53.688792, -0.958081
- Latitude span
- 53.687886 – 53.689581
- Longitude span
- -0.960062 – -0.956411
- Bounding box centre
- 53.688734, -0.958237
- Location descriptions
-
- M62 eastbound within J35
- M62 eastbound between J35 and J36
- Feed validity status
- Suspended
- Overall feed start
- Sat, Aug 15, 2026 8:00 AM
- Overall feed end
- Sat, Aug 15, 2026 2:00 PM
- Feed window length
- 6 hours
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M62 eastbound within J35
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {C6BF2B12-408D-4D59-B3FD-0EAB0300C4C5}
- Linear Element Type
- A Carriageway
- From Distance
- 497 m
- To Distance
- 533 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.687886 -0.960062 53.688069 -0.95962
Segment 2
2 coordinate pairs- Description
- M62 eastbound within J35
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {E9F67BD7-BD91-4C10-B267-842538FEFCB3}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 128 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.688069 -0.95962 53.688775 -0.958088
Segment 3
5 coordinate pairs- Description
- M62 eastbound between J35 and J36
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {55F41663-68C5-4982-82C2-852AE8D96D45}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 142 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.688775 -0.958088 53.689198 -0.957214 53.689296 -0.957009 53.689481 -0.956617 53.689581 -0.956411
- Geometry type
- MultiLineString
- Geometry points
- 9
- First coordinate pair
- -0.960062, 53.687886
- Road section segments
- 1
- Road section points
- 9
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.960062,
53.687886
],
[
-0.95962,
53.688069
],
[
-0.95962,
53.688069
],
[
-0.958088,
53.688775
],
[
-0.958088,
53.688775
],
[
-0.957214,
53.689198
],
[
-0.957009,
53.689296
],
[
-0.956617,
53.689481
],
[
-0.956411,
53.689581
]
]
]
}
View road section coordinates
[
[
[
-0.960062,
53.687886
],
[
-0.95962,
53.688069
],
[
-0.95962,
53.688069
],
[
-0.958088,
53.688775
],
[
-0.958088,
53.688775
],
[
-0.957214,
53.689198
],
[
-0.957009,
53.689296
],
[
-0.956617,
53.689481
],
[
-0.956411,
53.689581
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Suspended
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Aug 12, 2026 5:51 AM
- Record versioned
- Sat, Aug 15, 2026 12:07 AM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 7 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
Active Roadworks National HighwaysExpected to clear in 1 month 3 weeks
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
M62 Eastbound Jct 20 entry slip road lane 1 closure
Planned Roadworks National HighwaysStarts in 15 hours 1 minute
M62 Eastbound Jct 20 entry slip road lane 1 closure
M62 Eastbound lanes 1 and 2 closure (MP 64/4 to 65/9)
Planned Roadworks National HighwaysStarts in 15 hours 1 minute
M62 Eastbound lanes 1 and 2 closure (MP 64/4 to 65/9)
M62 Eastbound Lanes 3 and 4 closure (MP 34/0 to 38/5)
Planned Roadworks National HighwaysStarts in 15 hours 1 minute
M62 Eastbound Lanes 3 and 4 closure (MP 34/0 to 38/5)
M62 eastbound Jct 35 to M18 southbound Jct 7 Lane 1 closure (152/7 291/9)
Planned Roadworks National HighwaysStarts in 14 hours 1 minute
M62 eastbound Jct 35 to M18 southbound Jct 7 Lane 1 closure (152/7 291/9)