M62 eastbound Jct 34 to Jct 35 lane 3 closure ( 145/7 146/2)
ClearedM62 eastbound Jct 34 to Jct 35 lane 3 closure ( 145/7 146/2)
- Start time
- Mon, Nov 17, 2025 10:00 AM
- Expected end
- Mon, Nov 17, 2025 2:30 PM
- Duration
- 4 hours 30 minutes
- Road
- M62 – M62 Eastbound Between J34 And J35
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 3 closed, 1 of 3 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Nov 17, 2025 9:46 AM
- Last updated
- Mon, Nov 17, 2025 1:41 PM
- Cleared
- Mon, Nov 17, 2025 2:30 PM
- Latest update: M62 eastbound Jct 34 to Jct 35 lane 3 closure ( 145/7 146/2)
- Coordinates
- 53.688409, -1.100020
- Latitude span
- 53.687293 – 53.689052
- Longitude span
- -1.102480 – -1.095551
- Bounding box centre
- 53.688173, -1.099016
- Location descriptions
-
- M62 eastbound between J34 and J35
- Feed validity status
- Active
- Overall feed start
- Mon, Nov 17, 2025 10:00 AM
- Overall feed end
- Mon, Nov 17, 2025 2:30 PM
- Feed window length
- 4 hours 30 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M62 eastbound between J34 and J35
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl3
- Lane Number
- 3
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {75345493-4896-42AC-87B7-CF7E9BB38C0D}
- Linear Element Type
- A Carriageway
- From Distance
- 1,238 m
- To Distance
- 1,309 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.689052 -1.10248 53.68885 -1.101743 53.688785 -1.101507
Segment 2
4 coordinate pairs- Description
- M62 eastbound between J34 and J35
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl3
- Lane Number
- 3
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {2DB1C7D7-FDD6-49DE-B426-F2D29C7B26A7}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 427 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.688785 -1.101507 53.688415 -1.100152 53.687683 -1.0972 53.687293 -1.095551
- Geometry type
- MultiLineString
- Geometry points
- 7
- First coordinate pair
- -1.102480, 53.689052
- Road section segments
- 1
- Road section points
- 7
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.10248,
53.689052
],
[
-1.101743,
53.68885
],
[
-1.101507,
53.688785
],
[
-1.101507,
53.688785
],
[
-1.100152,
53.688415
],
[
-1.0972,
53.687683
],
[
-1.095551,
53.687293
]
]
]
}
View road section coordinates
[
[
[
-1.10248,
53.689052
],
[
-1.101743,
53.68885
],
[
-1.101507,
53.688785
],
[
-1.101507,
53.688785
],
[
-1.100152,
53.688415
],
[
-1.0972,
53.687683
],
[
-1.095551,
53.687293
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Nov 17, 2025 9:46 AM
- Record versioned
- Mon, Nov 17, 2025 1:41 PM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 eastbound Jct 37 to Jct 38 Lane 1 closure (164/5 - 166/5)
Planned Roadworks National HighwaysStarts in 17 hours 22 minutes
M62 eastbound Jct 37 to Jct 38 Lane 1 closure (164/5 - 166/5)
M62 Eastbound Jct 7 entry slip road closure
Planned Roadworks National HighwaysStarts in 17 hours 22 minutes
M62 Eastbound Jct 7 entry slip road closure
A1M southbound Jct 45 to Jct 44 hard shoulder closure ( 60/0 59/4)
Planned Roadworks National HighwaysStarts in 5 hours 22 minutes
A1M southbound Jct 45 to Jct 44 hard shoulder closure ( 60/0 59/4)
M62 Eastbound lanes 1 and 2 closure (MP 38/1 to 39/3))
Cleared Roadworks National HighwaysCleared 57 minutes 21 seconds ago
M62 Eastbound lanes 1 and 2 closure (MP 38/1 to 39/3))
M57 Southbound to M62 Eastbound lane 1 closure
Cleared Roadworks National HighwaysCleared 57 minutes 21 seconds ago
M57 Southbound to M62 Eastbound lane 1 closure
M62 Eastbound lanes 1 and 2 closure (MP 38/1 to 39/3))
Cleared Roadworks National HighwaysCleared 3 hours 57 minutes ago
M62 Eastbound lanes 1 and 2 closure (MP 38/1 to 39/3))