M62 eastbound Jct 34 to Jct 35 Lane 1 closure (152/7 153/9)
PlannedM62 eastbound Jct 34 to Jct 35 Lane 1 closure (152/7 153/9)
- Start time
- Fri, Aug 7, 2026 7:00 PM
- Expected end
- Sat, Aug 8, 2026 5:00 AM
- Duration
- 10 hours
- Road
- M62 – M62 Eastbound Between J34 And J35
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 3 lanes affected
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Aug 6, 2026 8:16 PM
- Last updated
- Fri, Aug 7, 2026 1:52 AM
- Cleared
- Sat, Aug 8, 2026 5:00 AM
- Latest update: M62 eastbound Jct 34 to Jct 35 Lane 1 closure (152/7 153/9)
- Coordinates
- 53.680683, -0.988624
- Latitude span
- 53.679835 – 53.681568
- Longitude span
- -0.998652 – -0.981737
- Bounding box centre
- 53.680702, -0.990195
- Location descriptions
-
- M62 eastbound between J34 and J35
- M62 eastbound within J35
- Feed validity status
- Planned
- Overall feed start
- Fri, Aug 7, 2026 7:00 PM
- Overall feed end
- Sat, Aug 8, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
11 coordinate pairs- Description
- M62 eastbound between J34 and J35
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {A3A373EF-A15A-4885-B5FB-47D0C7196C47}
- Linear Element Type
- A Carriageway
- From Distance
- 147 m
- To Distance
- 871 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.679835 -0.998652 53.679873 -0.997747 53.67998 -0.995579 53.680076 -0.994094 53.680154 -0.993183 53.680354 -0.990862 53.680496 -0.989587 53.680639 -0.988387 53.680664 -0.988175 53.680702 -0.987848 53.680706 -0.98781
Segment 2
3 coordinate pairs- Description
- M62 eastbound within J35
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {FB58907E-FC79-4331-8622-626F6B8A14CC}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 166 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.681178 -0.984165 53.68146 -0.982357 53.681568 -0.981737
Segment 3
7 coordinate pairs- Description
- M62 eastbound between J34 and J35
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {865A45CD-75AB-485B-8BDF-DD2FB26A6437}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 246 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.680706 -0.98781 53.680781 -0.987112 53.680796 -0.986976 53.680856 -0.986414 53.68117 -0.984226 53.68117 -0.984211 53.681178 -0.984165
- Geometry type
- MultiLineString
- Geometry points
- 21
- First coordinate pair
- -0.998652, 53.679835
- Road section segments
- 1
- Road section points
- 21
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.998652,
53.679835
],
[
-0.997747,
53.679873
],
[
-0.995579,
53.67998
],
[
-0.994094,
53.680076
],
[
-0.993183,
53.680154
],
[
-0.990862,
53.680354
],
[
-0.989587,
53.680496
],
[
-0.988387,
53.680639
],
[
-0.988175,
53.680664
],
[
-0.987848,
53.680702
],
[
-0.98781,
53.680706
],
[
-0.984165,
53.681178
],
[
-0.982357,
53.68146
],
[
-0.981737,
53.681568
],
[
-0.98781,
53.680706
],
[
-0.987112,
53.680781
],
[
-0.986976,
53.680796
],
[
-0.986414,
53.680856
],
[
-0.984226,
53.68117
],
[
-0.984211,
53.68117
],
[
-0.984165,
53.681178
]
]
]
}
View road section coordinates
[
[
[
-0.998652,
53.679835
],
[
-0.997747,
53.679873
],
[
-0.995579,
53.67998
],
[
-0.994094,
53.680076
],
[
-0.993183,
53.680154
],
[
-0.990862,
53.680354
],
[
-0.989587,
53.680496
],
[
-0.988387,
53.680639
],
[
-0.988175,
53.680664
],
[
-0.987848,
53.680702
],
[
-0.98781,
53.680706
],
[
-0.984165,
53.681178
],
[
-0.982357,
53.68146
],
[
-0.981737,
53.681568
],
[
-0.98781,
53.680706
],
[
-0.987112,
53.680781
],
[
-0.986976,
53.680796
],
[
-0.986414,
53.680856
],
[
-0.984226,
53.68117
],
[
-0.984211,
53.68117
],
[
-0.984165,
53.681178
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Aug 6, 2026 8:16 PM
- Record versioned
- Fri, Aug 7, 2026 1:52 AM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
A1m northbound Jct 43 to Jct 44 24/7 Lane 1 closure (54/5 57/5)
Planned Roadworks National HighwaysExpected to clear in 1 month 3 weeks
A1m northbound Jct 43 to Jct 44 24/7 Lane 1 closure (54/5 57/5)
M62 Eastbound to M60 Clockwise link Carriageway closure
Planned Roadworks National HighwaysStarts in 16 hours 26 minutes
M62 Eastbound to M60 Clockwise link Carriageway closure
M62 eastbound Jct 31 to Jct 38 hard shoulder IPV ( 124/4-177/3)
Planned Roadworks National HighwaysStarts in 4 hours 56 minutes
M62 eastbound Jct 31 to Jct 38 hard shoulder IPV ( 124/4-177/3)
M62 eastbound Jct 27 entry slip road IPV hard shoulder
Planned Roadworks National HighwaysStarts in 4 hours 26 minutes
M62 eastbound Jct 27 entry slip road IPV hard shoulder
M62 eastbound Jct 26 to Jct 27 Hardshoulder closure (104/4 - 104/9)
Planned Roadworks National HighwaysStarts in 4 hours 26 minutes
M62 eastbound Jct 26 to Jct 27 Hardshoulder closure (104/4 - 104/9)
M62 eastbound jct 34 to Jct 38 (141/8-177/8) hard shoulder IPV
Planned Roadworks National HighwaysStarts in 3 hours 26 minutes
M62 eastbound jct 34 to Jct 38 (141/8-177/8) hard shoulder IPV