M62 eastbound Jct 34 to Jct 35 lane 1 closure (145/8 to 146/4)
ClearedM62 eastbound Jct 34 to Jct 35 lane 1 closure (145/8 to 146/4)
- Start time
- Wed, Sep 16, 2026 8:00 AM
- Expected end
- Wed, Sep 16, 2026 2:00 PM
- Duration
- 50 minutes 2 seconds
- Road
- M62 – M62 Eastbound Between J34 And J35
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 3 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Sep 16, 2026 7:52 AM
- Last updated
- Wed, Sep 16, 2026 8:10 AM
- Cleared
- Wed, Sep 16, 2026 8:50 AM
- Latest update: M62 eastbound Jct 34 to Jct 35 lane 1 closure (145/8 to 146/4)
- Coordinates
- 53.690556, -1.107984
- Latitude span
- 53.684515 – 53.694419
- Longitude span
- -1.126898 – -1.081701
- Bounding box centre
- 53.689467, -1.104300
- Location descriptions
-
- M62 eastbound between J34 and J35
- Feed validity status
- Active
- Overall feed start
- Wed, Sep 16, 2026 8:00 AM
- Overall feed end
- Wed, Sep 16, 2026 2:00 PM
- Feed window length
- 6 hours
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
19 coordinate pairs- Description
- M62 eastbound between J34 and J35
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {75345493-4896-42AC-87B7-CF7E9BB38C0D}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 1,309 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.693517 -1.119625 53.693419 -1.119093 53.693352 -1.118701 53.693109 -1.117493 53.693024 -1.117054 53.692794 -1.115914 53.692589 -1.11495 53.692291 -1.113682 53.69182 -1.111923 53.691469 -1.110658 53.691156 -1.109604 53.690675 -1.108025 53.69052 -1.107478 53.690392 -1.106999 53.690272 -1.106561 53.68978 -1.104961 53.689078 -1.102573 53.68885 -1.101743 53.688785 -1.101507
Segment 2
10 coordinate pairs- Description
- M62 eastbound between J34 and J35
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {B8004B31-57AB-45A6-9B29-9BFF00397406}
- Linear Element Type
- A Carriageway
- From Distance
- 617 m
- To Distance
- 1,108 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.694419 -1.126898 53.694401 -1.126644 53.694121 -1.123872 53.694043 -1.123235 53.694027 -1.123098 53.693956 -1.122598 53.69388 -1.122041 53.693797 -1.121429 53.693654 -1.120489 53.693517 -1.119625
Segment 3
12 coordinate pairs- Description
- M62 eastbound between J34 and J35
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {2DB1C7D7-FDD6-49DE-B426-F2D29C7B26A7}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 1,392 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.688785 -1.101507 53.688415 -1.100152 53.687683 -1.0972 53.687284 -1.095513 53.686716 -1.092966 53.686324 -1.091081 53.685969 -1.089317 53.685708 -1.088066 53.685353 -1.086272 53.68479 -1.08321 53.684546 -1.081883 53.684515 -1.081701
- Geometry type
- MultiLineString
- Geometry points
- 41
- First coordinate pair
- -1.119625, 53.693517
- Road section segments
- 1
- Road section points
- 41
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.119625,
53.693517
],
[
-1.119093,
53.693419
],
[
-1.118701,
53.693352
],
[
-1.117493,
53.693109
],
[
-1.117054,
53.693024
],
[
-1.115914,
53.692794
],
[
-1.11495,
53.692589
],
[
-1.113682,
53.692291
],
[
-1.111923,
53.69182
],
[
-1.110658,
53.691469
],
[
-1.109604,
53.691156
],
[
-1.108025,
53.690675
],
[
-1.107478,
53.69052
],
[
-1.106999,
53.690392
],
[
-1.106561,
53.690272
],
[
-1.104961,
53.68978
],
[
-1.102573,
53.689078
],
[
-1.101743,
53.68885
],
[
-1.101507,
53.688785
],
[
-1.126898,
53.694419
],
[
-1.126644,
53.694401
],
[
-1.123872,
53.694121
],
[
-1.123235,
53.694043
],
[
-1.123098,
53.694027
],
[
-1.122598,
53.693956
],
[
-1.122041,
53.69388
],
[
-1.121429,
53.693797
],
[
-1.120489,
53.693654
],
[
-1.119625,
53.693517
],
[
-1.101507,
53.688785
],
[
-1.100152,
53.688415
],
[
-1.0972,
53.687683
],
[
-1.095513,
53.687284
],
[
-1.092966,
53.686716
],
[
-1.091081,
53.686324
],
[
-1.089317,
53.685969
],
[
-1.088066,
53.685708
],
[
-1.086272,
53.685353
],
[
-1.08321,
53.68479
],
[
-1.081883,
53.684546
],
[
-1.081701,
53.684515
]
]
]
}
View road section coordinates
[
[
[
-1.119625,
53.693517
],
[
-1.119093,
53.693419
],
[
-1.118701,
53.693352
],
[
-1.117493,
53.693109
],
[
-1.117054,
53.693024
],
[
-1.115914,
53.692794
],
[
-1.11495,
53.692589
],
[
-1.113682,
53.692291
],
[
-1.111923,
53.69182
],
[
-1.110658,
53.691469
],
[
-1.109604,
53.691156
],
[
-1.108025,
53.690675
],
[
-1.107478,
53.69052
],
[
-1.106999,
53.690392
],
[
-1.106561,
53.690272
],
[
-1.104961,
53.68978
],
[
-1.102573,
53.689078
],
[
-1.101743,
53.68885
],
[
-1.101507,
53.688785
],
[
-1.126898,
53.694419
],
[
-1.126644,
53.694401
],
[
-1.123872,
53.694121
],
[
-1.123235,
53.694043
],
[
-1.123098,
53.694027
],
[
-1.122598,
53.693956
],
[
-1.122041,
53.69388
],
[
-1.121429,
53.693797
],
[
-1.120489,
53.693654
],
[
-1.119625,
53.693517
],
[
-1.101507,
53.688785
],
[
-1.100152,
53.688415
],
[
-1.0972,
53.687683
],
[
-1.095513,
53.687284
],
[
-1.092966,
53.686716
],
[
-1.091081,
53.686324
],
[
-1.089317,
53.685969
],
[
-1.088066,
53.685708
],
[
-1.086272,
53.685353
],
[
-1.08321,
53.68479
],
[
-1.081883,
53.684546
],
[
-1.081701,
53.684515
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Sep 16, 2026 7:52 AM
- Record versioned
- Wed, Sep 16, 2026 8:10 AM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 eastbound Jct 25 hardshoulder closure (94/6 - 95/3)
Active Roadworks National HighwaysExpected to clear in 1 week 6 days
M62 eastbound Jct 25 hardshoulder closure (94/6 - 95/3)
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 5 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)
Planned Roadworks National HighwaysStarts in 2 hours 54 minutes
M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)
M62 eastbound Jct 29 carriageway closure between exit and entry slip road
Planned Roadworks National HighwaysStarts in 2 hours 54 minutes
M62 eastbound Jct 29 carriageway closure between exit and entry slip road
M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)
Planned Roadworks National HighwaysStarts in 2 hours 54 minutes
M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)
M62 eastbound lane 3 closure with switching (MP 69/0 to 71/8)
Planned Roadworks National HighwaysStarts in 1 hour 54 minutes
M62 eastbound lane 3 closure with switching (MP 69/0 to 71/8)