M62 eastbound Jct 29 carriageway closure between exit and entry slip road
PlannedM62 eastbound Jct 29 carriageway closure between exit and entry slip road
- Start time
- Mon, Oct 12, 2026 9:00 PM
- Expected end
- Tue, Oct 13, 2026 4:00 AM
- Duration
- 7 hours
- Road
- M62 – M62 Eastbound Between J29 And J30
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Oct 5, 2026 12:29 PM
- Last updated
- Mon, Oct 12, 2026 2:36 PM
- Cleared
- Tue, Oct 13, 2026 4:00 AM
- Latest update: M62 eastbound Jct 29 carriageway closure between exit and entry slip road
- Coordinates
- 53.730237, -1.508588
- Latitude span
- 53.729071 – 53.731312
- Longitude span
- -1.513805 – -1.502689
- Bounding box centre
- 53.730192, -1.508247
- Location descriptions
-
- M62 eastbound between J29 and J30
- M62 eastbound within J29 after M1 J42 southbound exit
- Feed validity status
- Planned
- Overall feed start
- Mon, Oct 12, 2026 9:00 PM
- Overall feed end
- Tue, Oct 13, 2026 4:00 AM
- Feed window length
- 7 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M62 eastbound between J29 and J30
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {67A46E98-8465-4348-B5DA-FA9C487B7E45}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 120 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.729398 -1.504435 53.729389 -1.504389 53.729306 -1.503994 53.729288 -1.503906 53.729071 -1.502689
Segment 2
2 coordinate pairs- Description
- M62 eastbound within J29 after M1 J42 southbound exit
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {52F6D379-DEAB-4571-8FB9-DBB3CD14BD93}
- Linear Element Type
- A Carriageway
- From Distance
- 162 m
- To Distance
- 170 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.731312 -1.513805 53.731287 -1.513689
Segment 3
2 coordinate pairs- Description
- M62 eastbound within J29 after M1 J42 southbound exit
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {5D6AB4D2-B419-489C-A019-5AB9CAC24659}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 117 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.731287 -1.513689 53.73093 -1.512011
Segment 4
2 coordinate pairs- Description
- M62 eastbound within J29 after M1 J42 southbound exit
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {8F2024EF-535C-47CB-803B-53C6C7DC6C22}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 118 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.730875 -1.511739 53.730517 -1.510045
Segment 5
2 coordinate pairs- Description
- M62 eastbound within J29 after M1 J42 southbound exit
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {3B3631DF-8446-4108-956B-2BBB72E12A4F}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 18 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.73093 -1.512011 53.730875 -1.511739
Segment 6
3 coordinate pairs- Description
- M62 eastbound within J29 after M1 J42 southbound exit
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {FD3A2B0D-4365-491E-8A9B-CC8002438640}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 391 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.730517 -1.510045 53.729417 -1.504783 53.729398 -1.504435
- Geometry type
- MultiLineString
- Geometry points
- 16
- First coordinate pair
- -1.504435, 53.729398
- Road section segments
- 1
- Road section points
- 16
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.504435,
53.729398
],
[
-1.504389,
53.729389
],
[
-1.503994,
53.729306
],
[
-1.503906,
53.729288
],
[
-1.502689,
53.729071
],
[
-1.513805,
53.731312
],
[
-1.513689,
53.731287
],
[
-1.513689,
53.731287
],
[
-1.512011,
53.73093
],
[
-1.511739,
53.730875
],
[
-1.510045,
53.730517
],
[
-1.512011,
53.73093
],
[
-1.511739,
53.730875
],
[
-1.510045,
53.730517
],
[
-1.504783,
53.729417
],
[
-1.504435,
53.729398
]
]
]
}
View road section coordinates
[
[
[
-1.504435,
53.729398
],
[
-1.504389,
53.729389
],
[
-1.503994,
53.729306
],
[
-1.503906,
53.729288
],
[
-1.502689,
53.729071
],
[
-1.513805,
53.731312
],
[
-1.513689,
53.731287
],
[
-1.513689,
53.731287
],
[
-1.512011,
53.73093
],
[
-1.511739,
53.730875
],
[
-1.510045,
53.730517
],
[
-1.512011,
53.73093
],
[
-1.511739,
53.730875
],
[
-1.510045,
53.730517
],
[
-1.504783,
53.729417
],
[
-1.504435,
53.729398
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Oct 5, 2026 12:29 PM
- Record versioned
- Mon, Oct 12, 2026 2:36 PM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 eastbound Jct 25 hardshoulder closure (94/6 - 95/3)
Active Roadworks National HighwaysExpected to clear in 1 week 6 days
M62 eastbound Jct 25 hardshoulder closure (94/6 - 95/3)
M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)
Planned Roadworks National HighwaysStarts in 5 hours 52 minutes
M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)
M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)
Planned Roadworks National HighwaysStarts in 5 hours 52 minutes
M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)
M62 eastbound lane 3 closure with switching (MP 69/0 to 71/8)
Planned Roadworks National HighwaysStarts in 4 hours 52 minutes
M62 eastbound lane 3 closure with switching (MP 69/0 to 71/8)
M62 eastbound Jct 25 entry slip lane closure
Planned Roadworks National HighwaysStarts in 3 hours 52 minutes
M62 eastbound Jct 25 entry slip lane closure
M62 eastbound Jct 33 exit slip lane 2 closure
Planned Roadworks National HighwaysStarts in 3 hours 52 minutes
M62 eastbound Jct 33 exit slip lane 2 closure