M62 eastbound Jct 26 to Jct 27 Hardshoulder closure (104/4 - 104/9)
ActiveM62 eastbound Jct 26 to Jct 27 Hardshoulder closure (104/4 - 104/9)
- Start time
- Thu, Aug 20, 2026 8:20 PM
- Expected end
- Fri, Aug 21, 2026 4:00 AM
- Duration
- 7 hours 40 minutes
- Road
- M62 – M62 Eastbound Between J26 And J27
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Aug 20, 2026 8:26 PM
- Last updated
- Thu, Aug 20, 2026 11:13 PM
- Cleared
- Fri, Aug 21, 2026 4:00 AM
- Latest update: M62 eastbound Jct 26 to Jct 27 Hardshoulder closure (104/4 - 104/9)
- Coordinates
- 53.742727, -1.672421
- Latitude span
- 53.741913 – 53.743114
- Longitude span
- -1.677475 – -1.670014
- Bounding box centre
- 53.742514, -1.673745
- Location descriptions
-
- M62 eastbound between J26 and J27
- Feed validity status
- Active
- Overall feed start
- Thu, Aug 20, 2026 8:20 PM
- Overall feed end
- Fri, Aug 21, 2026 4:00 AM
- Feed window length
- 7 hours 40 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M62 eastbound between J26 and J27
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {2031DF65-3666-4758-85E3-34F32F81B51C}
- Linear Element Type
- A Carriageway
- From Distance
- 248 m
- To Distance
- 684 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.741913 -1.677475 53.742233 -1.675506 53.742842 -1.671711 53.742941 -1.671094
Segment 2
3 coordinate pairs- Description
- M62 eastbound between J26 and J27
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {89CDAD06-3976-4624-8360-BDDCA99DAD75}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 73 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.742941 -1.671094 53.743107 -1.670056 53.743114 -1.670014
- Geometry type
- MultiLineString
- Geometry points
- 7
- First coordinate pair
- -1.677475, 53.741913
- Road section segments
- 1
- Road section points
- 7
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.677475,
53.741913
],
[
-1.675506,
53.742233
],
[
-1.671711,
53.742842
],
[
-1.671094,
53.742941
],
[
-1.671094,
53.742941
],
[
-1.670056,
53.743107
],
[
-1.670014,
53.743114
]
]
]
}
View road section coordinates
[
[
[
-1.677475,
53.741913
],
[
-1.675506,
53.742233
],
[
-1.671711,
53.742842
],
[
-1.671094,
53.742941
],
[
-1.671094,
53.742941
],
[
-1.670056,
53.743107
],
[
-1.670014,
53.743114
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Aug 20, 2026 8:26 PM
- Record versioned
- Thu, Aug 20, 2026 11:13 PM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 Eastbound lane 1 closure (MP 57/9 to 59/3)
Active Roadworks National HighwaysExpected to clear in 4 hours 27 minutes
M62 Eastbound lane 1 closure (MP 57/9 to 59/3)
M62 eastbound Jct 22 to Jct 24 Lane 2 and 3 closure (84/7 89/9)
Planned Roadworks National HighwaysExpected to clear in 5 hours 27 minutes
M62 eastbound Jct 22 to Jct 24 Lane 2 and 3 closure (84/7 89/9)
M62 westbound Jct 38 entry slip road closure
Active Roadworks National HighwaysExpected to clear in 5 hours 27 minutes
M62 westbound Jct 38 entry slip road closure
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 7 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
Active Roadworks National HighwaysExpected to clear in 1 month 2 weeks
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
M62 eastbound Jct 26 to Jct 27 Hardshoulder closure (104/4 - 104/9)
Cleared Roadworks National HighwaysCleared 3 hours 2 minutes ago
M62 eastbound Jct 26 to Jct 27 Hardshoulder closure (104/4 - 104/9)