M62 eastbound Jct 25 entry slip lane closure
PlannedM62 eastbound Jct 25 entry slip lane closure
- Start time
- Mon, Oct 12, 2026 7:00 PM
- Expected end
- Tue, Oct 13, 2026 5:00 AM
- Duration
- 10 hours
- Road
- M62 – M62 J25 Eastbound Access
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 2 lanes affected, 1 of 3 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Oct 9, 2026 8:47 AM
- Last updated
- Mon, Oct 12, 2026 12:28 PM
- Cleared
- Tue, Oct 13, 2026 5:00 AM
- Latest update: M62 eastbound Jct 25 entry slip lane closure
- Coordinates
- 53.699263, -1.747401
- Latitude span
- 53.696214 – 53.703022
- Longitude span
- -1.753253 – -1.743395
- Bounding box centre
- 53.699618, -1.748324
- Location descriptions
-
- M62 J25 eastbound access
- M62 eastbound between J25 and J26
- Feed validity status
- Planned
- Overall feed start
- Mon, Oct 12, 2026 7:00 PM
- Overall feed end
- Tue, Oct 13, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
12 coordinate pairs- Description
- M62 J25 eastbound access
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {289FB8E1-D862-417D-8AF3-F495C355371E}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 7 m
- To Distance
- 511 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.696214 -1.753253 53.696227 -1.753129 53.696254 -1.752917 53.696289 -1.752765 53.696334 -1.752598 53.69637 -1.752507 53.696496 -1.752147 53.696754 -1.751581 53.697676 -1.749395 53.698364 -1.747785 53.698686 -1.747102 53.69874 -1.74698
Segment 2
12 coordinate pairs- Description
- M62 eastbound between J25 and J26
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {7F5D2F61-1961-4254-8362-5C4B2E75AF50}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 416 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.69874 -1.74698 53.698883 -1.746737 53.699224 -1.746235 53.699609 -1.745733 53.700004 -1.745276 53.700452 -1.744819 53.700739 -1.74456 53.700991 -1.744377 53.701242 -1.744209 53.701403 -1.744087 53.701574 -1.74398 53.701933 -1.743811
Segment 3
4 coordinate pairs- Description
- M62 eastbound between J25 and J26
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {C13D5EEC-6C06-468C-89B6-45EBA9776467}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 124 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.701933 -1.743811 53.702274 -1.743642 53.702948 -1.743411 53.703022 -1.743395
- Geometry type
- MultiLineString
- Geometry points
- 28
- First coordinate pair
- -1.753253, 53.696214
- Road section segments
- 1
- Road section points
- 28
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.753253,
53.696214
],
[
-1.753129,
53.696227
],
[
-1.752917,
53.696254
],
[
-1.752765,
53.696289
],
[
-1.752598,
53.696334
],
[
-1.752507,
53.69637
],
[
-1.752147,
53.696496
],
[
-1.751581,
53.696754
],
[
-1.749395,
53.697676
],
[
-1.747785,
53.698364
],
[
-1.747102,
53.698686
],
[
-1.74698,
53.69874
],
[
-1.74698,
53.69874
],
[
-1.746737,
53.698883
],
[
-1.746235,
53.699224
],
[
-1.745733,
53.699609
],
[
-1.745276,
53.700004
],
[
-1.744819,
53.700452
],
[
-1.74456,
53.700739
],
[
-1.744377,
53.700991
],
[
-1.744209,
53.701242
],
[
-1.744087,
53.701403
],
[
-1.74398,
53.701574
],
[
-1.743811,
53.701933
],
[
-1.743811,
53.701933
],
[
-1.743642,
53.702274
],
[
-1.743411,
53.702948
],
[
-1.743395,
53.703022
]
]
]
}
View road section coordinates
[
[
[
-1.753253,
53.696214
],
[
-1.753129,
53.696227
],
[
-1.752917,
53.696254
],
[
-1.752765,
53.696289
],
[
-1.752598,
53.696334
],
[
-1.752507,
53.69637
],
[
-1.752147,
53.696496
],
[
-1.751581,
53.696754
],
[
-1.749395,
53.697676
],
[
-1.747785,
53.698364
],
[
-1.747102,
53.698686
],
[
-1.74698,
53.69874
],
[
-1.74698,
53.69874
],
[
-1.746737,
53.698883
],
[
-1.746235,
53.699224
],
[
-1.745733,
53.699609
],
[
-1.745276,
53.700004
],
[
-1.744819,
53.700452
],
[
-1.74456,
53.700739
],
[
-1.744377,
53.700991
],
[
-1.744209,
53.701242
],
[
-1.744087,
53.701403
],
[
-1.74398,
53.701574
],
[
-1.743811,
53.701933
],
[
-1.743811,
53.701933
],
[
-1.743642,
53.702274
],
[
-1.743411,
53.702948
],
[
-1.743395,
53.703022
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 4
- Record created
- Fri, Oct 9, 2026 8:47 AM
- Record versioned
- Mon, Oct 12, 2026 12:28 PM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 eastbound Jct 25 hardshoulder closure (94/6 - 95/3)
Active Roadworks National HighwaysExpected to clear in 1 week 6 days
M62 eastbound Jct 25 hardshoulder closure (94/6 - 95/3)
M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)
Planned Roadworks National HighwaysStarts in 6 hours 23 minutes
M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)
M62 eastbound Jct 29 carriageway closure between exit and entry slip road
Planned Roadworks National HighwaysStarts in 6 hours 23 minutes
M62 eastbound Jct 29 carriageway closure between exit and entry slip road
M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)
Planned Roadworks National HighwaysStarts in 6 hours 23 minutes
M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)
M62 eastbound lane 3 closure with switching (MP 69/0 to 71/8)
Planned Roadworks National HighwaysStarts in 5 hours 23 minutes
M62 eastbound lane 3 closure with switching (MP 69/0 to 71/8)
M62 eastbound Jct 33 exit slip lane 2 closure
Planned Roadworks National HighwaysStarts in 4 hours 23 minutes
M62 eastbound Jct 33 exit slip lane 2 closure