M62 eastbound Jct 24 to Jct 25 hardshoulder closure (91/4 91/8)

Cleared

M62 eastbound Jct 24 to Jct 25 hardshoulder closure (91/4 91/8)

Start time
Wed, Sep 30, 2026 8:00 AM
Expected end
Wed, Sep 30, 2026 2:00 PM
Duration
6 hours
Road
M62 – M62 Eastbound Between J24 And J25
Category
Road Maintenance
Direction
Eastbound
Carriageway
Dual Carriageway
Reason
Tree And Vegetation Cutting Work
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Tue, Sep 29, 2026 4:03 PM
Last updated
Wed, Sep 30, 2026 1:19 PM
Cleared
Wed, Sep 30, 2026 2:00 PM
  • Latest update: M62 eastbound Jct 24 to Jct 25 hardshoulder closure (91/4 91/8)
Coordinates
53.680077, -1.801527
Latitude span
53.679723 – 53.680660
Longitude span
-1.803732 – -1.797888
Bounding box centre
53.680192, -1.800810
Location descriptions
  • M62 eastbound between J24 and J25
Feed validity status
Planned
Overall feed start
Wed, Sep 30, 2026 8:00 AM
Overall feed end
Wed, Sep 30, 2026 2:00 PM
Feed window length
6 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
other
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

2 coordinate pairs
Description
M62 eastbound between J24 and J25
Carriageway
Dual Carriageway
Lane Usage
Lh
Lane Number
0
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
0 lanes restricted
Operational Lanes
4 operational lanes
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start2 End2
Linear Element Road
M62
Linear Element Model
The Network Model
Linear Element Id
{FDAFABAC-562A-47B3-A70E-5EB3208542B1}
Linear Element Type
A Carriageway
From Distance
1,815 m
To Distance
1,817 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.679723 -1.803732
53.679728 -1.803699

Segment 2

4 coordinate pairs
Description
M62 eastbound between J24 and J25
Carriageway
Dual Carriageway
Lane Usage
Lh
Lane Number
0
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
0 lanes restricted
Operational Lanes
4 operational lanes
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start2 End2
Linear Element Road
M62
Linear Element Model
The Network Model
Linear Element Id
{E2B2E64C-AD87-41BF-A3DC-FAA7C8DBE192}
Linear Element Type
A Carriageway
From Distance
0 m
To Distance
397 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.679728 -1.803699
53.68018 -1.800881
53.68044 -1.79926
53.68066 -1.797888
Geometry type
MultiLineString
Geometry points
6
First coordinate pair
-1.803732, 53.679723
Road section segments
1
Road section points
6
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -1.803732,
                53.679723
            ],
            [
                -1.803699,
                53.679728
            ],
            [
                -1.803699,
                53.679728
            ],
            [
                -1.800881,
                53.68018
            ],
            [
                -1.79926,
                53.68044
            ],
            [
                -1.797888,
                53.68066
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -1.803732,
            53.679723
        ],
        [
            -1.803699,
            53.679728
        ],
        [
            -1.803699,
            53.679728
        ],
        [
            -1.800881,
            53.68018
        ],
        [
            -1.79926,
            53.68044
        ],
        [
            -1.797888,
            53.68066
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Tree And Vegetation Cutting Work
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Other
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Tue, Sep 29, 2026 4:03 PM
Record versioned
Wed, Sep 30, 2026 1:19 PM
Coordinate source
Geometry

Driving on the M62? See every live closure, roadwork and planned restriction on this road.

M62 live closures

Related incidents

M62 eastbound Jct 25 hardshoulder closure (94/6 - 95/3)

Active Roadworks National Highways
Calderdale M62 · M62 Eastbound Between J24 And J25

Expected to clear in 1 week 6 days

Started 25 Sep 2026, 04:00 Expected clear 26 Oct 2026, 12:00

M62 eastbound Jct 25 hardshoulder closure (94/6 - 95/3)

Category: Road Maintenance
View update

M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)

Active Roadworks National Highways
St. Helens M62 · M62 Eastbound Between J6 And J7

Expected to clear in 1 year 5 months

Started 31 Mar 2026, 23:01 Expected clear 31 Mar 2028, 22:59

M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)

Category: Road Maintenance
View update

M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)

Planned Roadworks National Highways
St. Helens M62 · M62 J9 Eastbound Access

Starts in 3 hours 30 minutes

Starts 12 Oct 2026, 21:00 Expected clear 13 Oct 2026, 05:00

M62 Eastbound Lane 4 closure (MP 25/5 to 29/3)

Category: Road Maintenance
View update

M62 eastbound Jct 29 carriageway closure between exit and entry slip road

Planned Roadworks National Highways
Wakefield M62 · M62 Eastbound Between J29 And J30

Starts in 3 hours 30 minutes

Starts 12 Oct 2026, 21:00 Expected clear 13 Oct 2026, 04:00

M62 eastbound Jct 29 carriageway closure between exit and entry slip road

Category: Road Maintenance
View update

M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)

Planned Roadworks National Highways
Wakefield M62 · M62 Eastbound Within J29 After M1 J42 Southbound Exit

Starts in 3 hours 30 minutes

Starts 12 Oct 2026, 21:00 Expected clear 13 Oct 2026, 04:00

M62 eastbound Jct 28 to Jct 29 lane 4 and 3 closure ( 114/3 116/0)

Category: Road Maintenance
View update

M62 eastbound lane 3 closure with switching (MP 69/0 to 71/8)

Planned Roadworks National Highways
Oldham M62 · M62 Eastbound Between J21 And J22

Starts in 2 hours 30 minutes

Starts 12 Oct 2026, 20:00 Expected clear 13 Oct 2026, 04:00

M62 eastbound lane 3 closure with switching (MP 69/0 to 71/8)

Category: Road Maintenance
View update