M62 Eastbound Jct 21 exit slip road closure
ClearedM62 Eastbound Jct 21 exit slip road closure
- Start time
- Wed, Jul 15, 2026 9:31 PM
- Expected end
- Thu, Jul 16, 2026 5:00 AM
- Duration
- 5 hours 9 minutes 1 second
- Road
- M62 – M62 J21 Eastbound Exit
- Category
- Road Maintenance
- Direction
- Eastbound
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jul 15, 2026 9:44 PM
- Last updated
- Thu, Jul 16, 2026 2:24 AM
- Cleared
- Thu, Jul 16, 2026 2:40 AM
- Latest update: M62 Eastbound Jct 21 exit slip road closure
- Coordinates
- 53.599976, -2.117636
- Latitude span
- 53.597932 – 53.600958
- Longitude span
- -2.121436 – -2.116340
- Bounding box centre
- 53.599445, -2.118888
- Location descriptions
-
- M62 J21 eastbound exit
- Feed validity status
- Active
- Overall feed start
- Wed, Jul 15, 2026 9:31 PM
- Overall feed end
- Thu, Jul 16, 2026 5:00 AM
- Feed window length
- 7 hours 29 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M62 J21 eastbound exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {AB68FC7F-90F5-46A4-928E-98257C0D5D1C}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 50 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.600539 -2.116565 53.600679 -2.116417 53.60078 -2.116368 53.600958 -2.11634
Segment 2
8 coordinate pairs- Description
- M62 J21 eastbound exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {0D2B39B4-1D2D-4DD4-906A-756C5D8F9068}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 434 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.597932 -2.121436 53.598842 -2.119743 53.599198 -2.119055 53.599698 -2.118007 53.599988 -2.117387 53.600199 -2.116984 53.600364 -2.116766 53.600539 -2.116565
- Geometry type
- MultiLineString
- Geometry points
- 12
- First coordinate pair
- -2.116565, 53.600539
- Road section segments
- 1
- Road section points
- 12
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.116565,
53.600539
],
[
-2.116417,
53.600679
],
[
-2.116368,
53.60078
],
[
-2.11634,
53.600958
],
[
-2.121436,
53.597932
],
[
-2.119743,
53.598842
],
[
-2.119055,
53.599198
],
[
-2.118007,
53.599698
],
[
-2.117387,
53.599988
],
[
-2.116984,
53.600199
],
[
-2.116766,
53.600364
],
[
-2.116565,
53.600539
]
]
]
}
View road section coordinates
[
[
[
-2.116565,
53.600539
],
[
-2.116417,
53.600679
],
[
-2.116368,
53.60078
],
[
-2.11634,
53.600958
],
[
-2.121436,
53.597932
],
[
-2.119743,
53.598842
],
[
-2.119055,
53.599198
],
[
-2.118007,
53.599698
],
[
-2.117387,
53.599988
],
[
-2.116984,
53.600199
],
[
-2.116766,
53.600364
],
[
-2.116565,
53.600539
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Jul 15, 2026 9:44 PM
- Record versioned
- Thu, Jul 16, 2026 2:24 AM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 westbound to M6 Southbound link road closure
Active Roadworks National HighwaysExpected to clear in 3 hours 41 minutes
M62 westbound to M6 Southbound link road closure
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
Active Roadworks National HighwaysExpected to clear in 2 months 1 week
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
M62 eastbound Jct 27 Lane 1 closure (106/2 106/7)
Planned Roadworks National HighwaysStarts in 18 hours 41 minutes
M62 eastbound Jct 27 Lane 1 closure (106/2 106/7)
M62 Eastbound lanes 1 and 2 closure (MP 27/6 to 29/3)
Planned Roadworks National HighwaysStarts in 18 hours 41 minutes
M62 Eastbound lanes 1 and 2 closure (MP 27/6 to 29/3)
M62 eastbound Jct 22 to Jct 23 Lane 1 closure (78/5 81/0)
Planned Roadworks National HighwaysStarts in 17 hours 41 minutes
M62 eastbound Jct 22 to Jct 23 Lane 1 closure (78/5 81/0)
M62 westbound Jct 37 entry slip lane closure
Planned Roadworks National HighwaysStarts in 17 hours 41 minutes
M62 westbound Jct 37 entry slip lane closure