M62 Eastbound Jct 21 exit slip road closure
ClearedM62 Eastbound Jct 21 exit slip road closure
- Start time
- Fri, Apr 10, 2026 8:00 PM
- Expected end
- Sat, Apr 11, 2026 4:00 AM
- Duration
- 8 hours
- Road
- M62 – M62 J21 Eastbound Exit
- Category
- Road Maintenance
- Direction
- Eastbound
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Mar 27, 2026 8:03 AM
- Last updated
- Sat, Apr 11, 2026 2:48 AM
- Cleared
- Sat, Apr 11, 2026 4:00 AM
- Latest update: M62 Eastbound Jct 21 exit slip road closure
- Coordinates
- 53.599976, -2.117636
- Latitude span
- 53.597932 – 53.600958
- Longitude span
- -2.121436 – -2.116340
- Bounding box centre
- 53.599445, -2.118888
- Location descriptions
-
- M62 J21 eastbound exit
- Feed validity status
- Planned
- Overall feed start
- Fri, Apr 10, 2026 8:00 PM
- Overall feed end
- Sat, Apr 11, 2026 4:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
8 coordinate pairs- Description
- M62 J21 eastbound exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {0D2B39B4-1D2D-4DD4-906A-756C5D8F9068}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 434 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.597932 -2.121436 53.598842 -2.119743 53.599198 -2.119055 53.599698 -2.118007 53.599988 -2.117387 53.600199 -2.116984 53.600364 -2.116766 53.600539 -2.116565
Segment 2
4 coordinate pairs- Description
- M62 J21 eastbound exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {AB68FC7F-90F5-46A4-928E-98257C0D5D1C}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 50 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.600539 -2.116565 53.600679 -2.116417 53.60078 -2.116368 53.600958 -2.11634
- Geometry type
- MultiLineString
- Geometry points
- 12
- First coordinate pair
- -2.121436, 53.597932
- Road section segments
- 1
- Road section points
- 12
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.121436,
53.597932
],
[
-2.119743,
53.598842
],
[
-2.119055,
53.599198
],
[
-2.118007,
53.599698
],
[
-2.117387,
53.599988
],
[
-2.116984,
53.600199
],
[
-2.116766,
53.600364
],
[
-2.116565,
53.600539
],
[
-2.116565,
53.600539
],
[
-2.116417,
53.600679
],
[
-2.116368,
53.60078
],
[
-2.11634,
53.600958
]
]
]
}
View road section coordinates
[
[
[
-2.121436,
53.597932
],
[
-2.119743,
53.598842
],
[
-2.119055,
53.599198
],
[
-2.118007,
53.599698
],
[
-2.117387,
53.599988
],
[
-2.116984,
53.600199
],
[
-2.116766,
53.600364
],
[
-2.116565,
53.600539
],
[
-2.116565,
53.600539
],
[
-2.116417,
53.600679
],
[
-2.116368,
53.60078
],
[
-2.11634,
53.600958
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Mar 27, 2026 8:03 AM
- Record versioned
- Sat, Apr 11, 2026 2:48 AM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 9 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
Active Roadworks National HighwaysExpected to clear in 3 months 3 weeks
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
M62 Westbound Jct 11 exit slip road closure
Planned Roadworks National HighwaysStarts in 14 hours 59 minutes
M62 Westbound Jct 11 exit slip road closure
M62 eastbound Jct 26 to Jct 27 lane 3 and 4 closure (101/6 to 103/4)
Planned Roadworks National HighwaysStarts in 13 hours 59 minutes
M62 eastbound Jct 26 to Jct 27 lane 3 and 4 closure (101/6 to 103/4)
M62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)
Planned Roadworks National HighwaysStarts in 13 hours 59 minutes
M62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)
M62 eastbound Jct 37 to Jct 38 Lane 1 closure (164/5 - 166/5)
Planned Roadworks National HighwaysStarts in 13 hours 59 minutes
M62 eastbound Jct 37 to Jct 38 Lane 1 closure (164/5 - 166/5)