M62 Eastbound Jct 20 exit slip road lane 1 closure
ClearedM62 Eastbound Jct 20 exit slip road lane 1 closure
- Start time
- Thu, Jul 30, 2026 8:00 PM
- Expected end
- Fri, Jul 31, 2026 5:00 AM
- Duration
- 2 seconds
- Road
- M62 – M62 Eastbound Between J19 And J20
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 2 lanes affected, 1 of 3 lanes affected
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, May 29, 2026 7:26 AM
- Last updated
- Thu, Jul 30, 2026 6:29 PM
- Cleared
- Thu, Jul 30, 2026 8:00 PM
- Latest update: M62 Eastbound Jct 20 exit slip road lane 1 closure
- Coordinates
- 53.586517, -2.162082
- Latitude span
- 53.585983 – 53.587032
- Longitude span
- -2.165929 – -2.159444
- Bounding box centre
- 53.586508, -2.162687
- Location descriptions
-
- M62 eastbound between J19 and J20
- M62 J20 eastbound exit
- roundabout at M62 J20/A627(M)
- Feed validity status
- Planned
- Overall feed start
- Thu, Jul 30, 2026 8:00 PM
- Overall feed end
- Fri, Jul 31, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M62 eastbound between J19 and J20
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {735913F4-9D32-4846-9CB8-2C50093FD4BF}
- Linear Element Type
- A Carriageway
- From Distance
- 626 m
- To Distance
- 640 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.585991 -2.165929 53.585983 -2.165715
Segment 2
9 coordinate pairs- Description
- M62 J20 eastbound exit
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {B71FB921-515D-49B4-BC70-88EDD4A403E3}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 431 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.585983 -2.165715 53.586138 -2.163963 53.586211 -2.163405 53.58631 -2.16271 53.586401 -2.162242 53.586492 -2.161759 53.586826 -2.160084 53.586881 -2.159827 53.586989 -2.15945
Segment 3
3 coordinate pairs- Description
- roundabout at M62 J20/A627(M)
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A627(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {634ABF8A-07E6-4E51-8AED-4720CACA986F}
- Linear Element Type
- Other
- From Distance
- 0 m
- To Distance
- 4 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.586989 -2.15945 53.587016 -2.15945 53.587032 -2.159444
- Geometry type
- MultiLineString
- Geometry points
- 14
- First coordinate pair
- -2.165929, 53.585991
- Road section segments
- 1
- Road section points
- 14
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.165929,
53.585991
],
[
-2.165715,
53.585983
],
[
-2.165715,
53.585983
],
[
-2.163963,
53.586138
],
[
-2.163405,
53.586211
],
[
-2.16271,
53.58631
],
[
-2.162242,
53.586401
],
[
-2.161759,
53.586492
],
[
-2.160084,
53.586826
],
[
-2.159827,
53.586881
],
[
-2.15945,
53.586989
],
[
-2.15945,
53.586989
],
[
-2.15945,
53.587016
],
[
-2.159444,
53.587032
]
]
]
}
View road section coordinates
[
[
[
-2.165929,
53.585991
],
[
-2.165715,
53.585983
],
[
-2.165715,
53.585983
],
[
-2.163963,
53.586138
],
[
-2.163405,
53.586211
],
[
-2.16271,
53.58631
],
[
-2.162242,
53.586401
],
[
-2.161759,
53.586492
],
[
-2.160084,
53.586826
],
[
-2.159827,
53.586881
],
[
-2.15945,
53.586989
],
[
-2.15945,
53.586989
],
[
-2.15945,
53.587016
],
[
-2.159444,
53.587032
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, May 29, 2026 7:26 AM
- Record versioned
- Thu, Jul 30, 2026 6:29 PM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 eastbound jct 34 to Jct 38 (141/8-177/8) hard shoulder IPV
Planned Roadworks National HighwaysExpected to clear in 8 hours 42 minutes
M62 eastbound jct 34 to Jct 38 (141/8-177/8) hard shoulder IPV
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 7 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
Active Roadworks National HighwaysExpected to clear in 2 months 6 days
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
M62 Eastbound lanes 1 and 2 closure (MP 35/0 to 39/5)
Planned Roadworks National HighwaysStarts in 12 hours 42 minutes
M62 Eastbound lanes 1 and 2 closure (MP 35/0 to 39/5)
M62 westbound Jct 37 entry slip lane closure
Planned Roadworks National HighwaysStarts in 11 hours 42 minutes
M62 westbound Jct 37 entry slip lane closure
M62 eastbound Jct 27 entry slip road closure
Planned Roadworks National HighwaysStarts in 11 hours 42 minutes
M62 eastbound Jct 27 entry slip road closure