M62 Eastbound Jct 20 exit slip road lane 1 closure
ClearedM62 Eastbound Jct 20 exit slip road lane 1 closure
- Start time
- Fri, Apr 17, 2026 8:00 PM
- Expected end
- Sat, Apr 18, 2026 4:00 AM
- Duration
- 8 hours
- Road
- M62 – M62 Eastbound Between J19 And J20
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 2 lanes affected, 1 of 3 lanes affected
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Dec 12, 2025 2:29 PM
- Last updated
- Fri, Apr 17, 2026 1:48 AM
- Cleared
- Sat, Apr 18, 2026 4:00 AM
- Latest update: M62 Eastbound Jct 20 exit slip road lane 1 closure
- Coordinates
- 53.586517, -2.162082
- Latitude span
- 53.585983 – 53.587032
- Longitude span
- -2.165929 – -2.159444
- Bounding box centre
- 53.586508, -2.162687
- Location descriptions
-
- M62 eastbound between J19 and J20
- roundabout at M62 J20/A627(M)
- M62 J20 eastbound exit
- Feed validity status
- Planned
- Overall feed start
- Fri, Apr 17, 2026 8:00 PM
- Overall feed end
- Sat, Apr 18, 2026 4:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M62 eastbound between J19 and J20
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {735913F4-9D32-4846-9CB8-2C50093FD4BF}
- Linear Element Type
- A Carriageway
- From Distance
- 626 m
- To Distance
- 640 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.585991 -2.165929 53.585983 -2.165715
Segment 2
3 coordinate pairs- Description
- roundabout at M62 J20/A627(M)
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A627(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {634ABF8A-07E6-4E51-8AED-4720CACA986F}
- Linear Element Type
- Other
- From Distance
- 0 m
- To Distance
- 4 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.586989 -2.15945 53.587016 -2.15945 53.587032 -2.159444
Segment 3
9 coordinate pairs- Description
- M62 J20 eastbound exit
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {B71FB921-515D-49B4-BC70-88EDD4A403E3}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 431 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.585983 -2.165715 53.586138 -2.163963 53.586211 -2.163405 53.58631 -2.16271 53.586401 -2.162242 53.586492 -2.161759 53.586826 -2.160084 53.586881 -2.159827 53.586989 -2.15945
- Geometry type
- MultiLineString
- Geometry points
- 14
- First coordinate pair
- -2.165929, 53.585991
- Road section segments
- 1
- Road section points
- 14
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.165929,
53.585991
],
[
-2.165715,
53.585983
],
[
-2.15945,
53.586989
],
[
-2.15945,
53.587016
],
[
-2.159444,
53.587032
],
[
-2.165715,
53.585983
],
[
-2.163963,
53.586138
],
[
-2.163405,
53.586211
],
[
-2.16271,
53.58631
],
[
-2.162242,
53.586401
],
[
-2.161759,
53.586492
],
[
-2.160084,
53.586826
],
[
-2.159827,
53.586881
],
[
-2.15945,
53.586989
]
]
]
}
View road section coordinates
[
[
[
-2.165929,
53.585991
],
[
-2.165715,
53.585983
],
[
-2.15945,
53.586989
],
[
-2.15945,
53.587016
],
[
-2.159444,
53.587032
],
[
-2.165715,
53.585983
],
[
-2.163963,
53.586138
],
[
-2.163405,
53.586211
],
[
-2.16271,
53.58631
],
[
-2.162242,
53.586401
],
[
-2.161759,
53.586492
],
[
-2.160084,
53.586826
],
[
-2.159827,
53.586881
],
[
-2.15945,
53.586989
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Fri, Dec 12, 2025 2:29 PM
- Record versioned
- Fri, Apr 17, 2026 1:48 AM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 Eastbound lanes 1 and 2 closure (MP 38/1 to 39/3))
Active Roadworks National HighwaysExpected to clear in 4 hours 5 minutes
M62 Eastbound lanes 1 and 2 closure (MP 38/1 to 39/3))
M57 Southbound to M62 Eastbound lane 1 closure
Planned Roadworks National HighwaysExpected to clear in 4 hours 5 minutes
M57 Southbound to M62 Eastbound lane 1 closure
M62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)
Planned Roadworks National HighwaysExpected to clear in 5 hours 5 minutes
M62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 9 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
Active Roadworks National HighwaysExpected to clear in 3 months 3 weeks
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
M62 Eastbound lanes 1 and 2 closure (MP 38/1 to 39/3))
Cleared Roadworks National HighwaysCleared 2 hours 14 minutes ago
M62 Eastbound lanes 1 and 2 closure (MP 38/1 to 39/3))