M62 Eastbound Jct 10 exit slip road Lane 2 closure
PlannedM62 Eastbound Jct 10 exit slip road Lane 2 closure
- Start time
- Thu, Dec 18, 2025 9:00 PM
- Expected end
- Fri, Dec 19, 2025 6:00 AM
- Duration
- 9 hours
- Road
- M62 – Link Road From M62 J10 Eastbound To M6 J21A
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 2 lanes affected, 1 of 4 lanes affected
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Dec 9, 2025 1:10 PM
- Last updated
- Thu, Dec 18, 2025 8:19 PM
- Cleared
- Fri, Dec 19, 2025 6:00 AM
- Latest update: M62 Eastbound Jct 10 exit slip road Lane 2 closure
- Coordinates
- 53.424251, -2.569874
- Latitude span
- 53.423727 – 53.424851
- Longitude span
- -2.574214 – -2.567263
- Bounding box centre
- 53.424289, -2.570739
- Location descriptions
-
- link road from M62 J10 eastbound to M6 J21A
- M62 eastbound between J9 and J10
- Feed validity status
- Planned
- Overall feed start
- Thu, Dec 18, 2025 9:00 PM
- Overall feed end
- Fri, Dec 19, 2025 6:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- link road from M62 J10 eastbound to M6 J21A
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {895D0FEF-C5E4-4C10-8FE4-81367AE761A7}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 107 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.42404 -2.570563 53.424067 -2.570488 53.424159 -2.570008 53.424335 -2.569032
Segment 2
7 coordinate pairs- Description
- link road from M62 J10 eastbound to M6 J21A
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {2D222D8A-F971-45A9-B4D8-3BC341711E15}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 131 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.424335 -2.569032 53.424427 -2.568627 53.424527 -2.568237 53.424619 -2.567922 53.424746 -2.567517 53.424837 -2.567293 53.424851 -2.567263
Segment 3
7 coordinate pairs- Description
- M62 eastbound between J9 and J10
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {3FB94FD5-42DD-48DE-8627-624FCB0521AF}
- Linear Element Type
- A Carriageway
- From Distance
- 1,076 m
- To Distance
- 1,321 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.423727 -2.574214 53.423784 -2.573298 53.423985 -2.571108 53.423993 -2.571029 53.423999 -2.570967 53.42404 -2.570578 53.42404 -2.570563
- Geometry type
- MultiLineString
- Geometry points
- 18
- First coordinate pair
- -2.570563, 53.424040
- Road section segments
- 1
- Road section points
- 18
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.570563,
53.42404
],
[
-2.570488,
53.424067
],
[
-2.570008,
53.424159
],
[
-2.569032,
53.424335
],
[
-2.569032,
53.424335
],
[
-2.568627,
53.424427
],
[
-2.568237,
53.424527
],
[
-2.567922,
53.424619
],
[
-2.567517,
53.424746
],
[
-2.567293,
53.424837
],
[
-2.567263,
53.424851
],
[
-2.574214,
53.423727
],
[
-2.573298,
53.423784
],
[
-2.571108,
53.423985
],
[
-2.571029,
53.423993
],
[
-2.570967,
53.423999
],
[
-2.570578,
53.42404
],
[
-2.570563,
53.42404
]
]
]
}
View road section coordinates
[
[
[
-2.570563,
53.42404
],
[
-2.570488,
53.424067
],
[
-2.570008,
53.424159
],
[
-2.569032,
53.424335
],
[
-2.569032,
53.424335
],
[
-2.568627,
53.424427
],
[
-2.568237,
53.424527
],
[
-2.567922,
53.424619
],
[
-2.567517,
53.424746
],
[
-2.567293,
53.424837
],
[
-2.567263,
53.424851
],
[
-2.574214,
53.423727
],
[
-2.573298,
53.423784
],
[
-2.571108,
53.423985
],
[
-2.571029,
53.423993
],
[
-2.570967,
53.423999
],
[
-2.570578,
53.42404
],
[
-2.570563,
53.42404
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 3
- Record created
- Tue, Dec 9, 2025 1:10 PM
- Record versioned
- Thu, Dec 18, 2025 8:19 PM
- Coordinate source
- Geometry
Related incidents
M62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)
Planned National HighwaysM62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active National HighwaysM62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
Active National HighwaysM62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
M62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)
Planned National HighwaysM62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)
M62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)
Planned National HighwaysM62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)
M62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)
Planned National HighwaysM62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)