M62 Eastbound Jct 10 exit slip road Lane 1 closure
PlannedM62 Eastbound Jct 10 exit slip road Lane 1 closure
- Start time
- Tue, Aug 4, 2026 7:00 PM
- Expected end
- Wed, Aug 5, 2026 4:00 AM
- Duration
- 9 hours
- Road
- M62 – Link Road From M62 J10 Eastbound To M6 J21A
- Category
- Road Maintenance
- Direction
- Eastbound
- Lanes affected
- Lane 1 closed, 1 of 2 lanes affected
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Jul 9, 2026 8:23 AM
- Last updated
- Tue, Aug 4, 2026 4:49 AM
- Cleared
- Wed, Aug 5, 2026 4:00 AM
- Latest update: M62 Eastbound Jct 10 exit slip road Lane 1 closure
- Coordinates
- 53.425534, -2.566403
- Latitude span
- 53.424196 – 53.427346
- Longitude span
- -2.569805 – -2.564122
- Bounding box centre
- 53.425771, -2.566964
- Location descriptions
-
- link road from M62 J10 eastbound to M6 J21A
- link road from M62 J10 eastbound to M6 J21A northbound
- Feed validity status
- Planned
- Overall feed start
- Tue, Aug 4, 2026 7:00 PM
- Overall feed end
- Wed, Aug 5, 2026 4:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- link road from M62 J10 eastbound to M6 J21A
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {895D0FEF-C5E4-4C10-8FE4-81367AE761A7}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 53 m
- To Distance
- 107 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.424196 -2.569805 53.424335 -2.569032
Segment 2
13 coordinate pairs- Description
- link road from M62 J10 eastbound to M6 J21A
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {2D222D8A-F971-45A9-B4D8-3BC341711E15}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 295 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.424335 -2.569032 53.424427 -2.568627 53.424527 -2.568237 53.424619 -2.567922 53.424746 -2.567517 53.424837 -2.567293 53.425101 -2.566694 53.425179 -2.566544 53.42531 -2.566291 53.425482 -2.565977 53.425654 -2.565709 53.425781 -2.565545 53.425853 -2.565455
Segment 3
8 coordinate pairs- Description
- link road from M62 J10 eastbound to M6 J21A northbound
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {D151A299-D547-4011-B843-0C9433A8D05A}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 189 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.425853 -2.565455 53.426052 -2.565262 53.426294 -2.564984 53.42644 -2.564816 53.426793 -2.564444 53.426973 -2.564311 53.427153 -2.564193 53.427346 -2.564122
- Geometry type
- MultiLineString
- Geometry points
- 23
- First coordinate pair
- -2.569805, 53.424196
- Road section segments
- 1
- Road section points
- 23
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.569805,
53.424196
],
[
-2.569032,
53.424335
],
[
-2.569032,
53.424335
],
[
-2.568627,
53.424427
],
[
-2.568237,
53.424527
],
[
-2.567922,
53.424619
],
[
-2.567517,
53.424746
],
[
-2.567293,
53.424837
],
[
-2.566694,
53.425101
],
[
-2.566544,
53.425179
],
[
-2.566291,
53.42531
],
[
-2.565977,
53.425482
],
[
-2.565709,
53.425654
],
[
-2.565545,
53.425781
],
[
-2.565455,
53.425853
],
[
-2.565455,
53.425853
],
[
-2.565262,
53.426052
],
[
-2.564984,
53.426294
],
[
-2.564816,
53.42644
],
[
-2.564444,
53.426793
],
[
-2.564311,
53.426973
],
[
-2.564193,
53.427153
],
[
-2.564122,
53.427346
]
]
]
}
View road section coordinates
[
[
[
-2.569805,
53.424196
],
[
-2.569032,
53.424335
],
[
-2.569032,
53.424335
],
[
-2.568627,
53.424427
],
[
-2.568237,
53.424527
],
[
-2.567922,
53.424619
],
[
-2.567517,
53.424746
],
[
-2.567293,
53.424837
],
[
-2.566694,
53.425101
],
[
-2.566544,
53.425179
],
[
-2.566291,
53.42531
],
[
-2.565977,
53.425482
],
[
-2.565709,
53.425654
],
[
-2.565545,
53.425781
],
[
-2.565455,
53.425853
],
[
-2.565455,
53.425853
],
[
-2.565262,
53.426052
],
[
-2.564984,
53.426294
],
[
-2.564816,
53.42644
],
[
-2.564444,
53.426793
],
[
-2.564311,
53.426973
],
[
-2.564193,
53.427153
],
[
-2.564122,
53.427346
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Jul 9, 2026 8:23 AM
- Record versioned
- Tue, Aug 4, 2026 4:49 AM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 7 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
Active Roadworks National HighwaysExpected to clear in 2 months 6 days
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
M62 Eastbound lanes 1 and 2 closure (MP 35/0 to 39/5)
Planned Roadworks National HighwaysStarts in 14 hours 48 minutes
M62 Eastbound lanes 1 and 2 closure (MP 35/0 to 39/5)
M62 eastbound Jct 27 entry slip road closure
Planned Roadworks National HighwaysStarts in 13 hours 48 minutes
M62 eastbound Jct 27 entry slip road closure
M62 eastbound Jct 35 to M18 southbound Jct 7 carriageway closure
Planned Roadworks National HighwaysStarts in 13 hours 48 minutes
M62 eastbound Jct 35 to M18 southbound Jct 7 carriageway closure
M62 Eastbound lane 1 closure (MP 24/9 to 26/4)
Planned Roadworks National HighwaysStarts in 13 hours 48 minutes
M62 Eastbound lane 1 closure (MP 24/9 to 26/4)