M62 Eastbound hardshoulder closure (MP 69/1 to 70/0)
ClearedM62 Eastbound hardshoulder closure (MP 69/1 to 70/0)
- Start time
- Wed, Aug 12, 2026 7:45 AM
- Expected end
- Wed, Aug 12, 2026 4:00 PM
- Duration
- 2 hours 25 minutes 2 seconds
- Road
- M62 – M62 Eastbound Between J21 And J22
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Aug 12, 2026 7:45 AM
- Last updated
- Wed, Aug 12, 2026 9:33 AM
- Cleared
- Wed, Aug 12, 2026 10:10 AM
- Latest update: M62 Eastbound hardshoulder closure (MP 69/1 to 70/0)
- Coordinates
- 53.609629, -2.093661
- Latitude span
- 53.606762 – 53.612631
- Longitude span
- -2.098690 – -2.090184
- Bounding box centre
- 53.609697, -2.094437
- Location descriptions
-
- M62 eastbound between J21 and J22
- Feed validity status
- Active
- Overall feed start
- Wed, Aug 12, 2026 7:45 AM
- Overall feed end
- Wed, Aug 12, 2026 4:00 PM
- Feed window length
- 8 hours 15 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
20 coordinate pairs- Description
- M62 eastbound between J21 and J22
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 5 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {14DC81C7-45A5-4911-BC74-05C62E391338}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 695 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.607712 -2.09649 53.607748 -2.0964 53.60814 -2.09563 53.608279 -2.095358 53.608558 -2.09486 53.60872 -2.094603 53.609035 -2.09409 53.609413 -2.093532 53.609638 -2.093245 53.609926 -2.092838 53.610034 -2.092717 53.610231 -2.09246 53.610501 -2.092159 53.610663 -2.091993 53.611203 -2.09142 53.611374 -2.091239 53.611644 -2.090997 53.611994 -2.090696 53.61239 -2.090364 53.612631 -2.090184
Segment 2
3 coordinate pairs- Description
- M62 eastbound between J21 and J22
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {A60064E3-A0ED-47B0-87BE-AACD2955532A}
- Linear Element Type
- A Carriageway
- From Distance
- 395 m
- To Distance
- 575 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.606762 -2.09869 53.607153 -2.097743 53.607712 -2.09649
- Geometry type
- MultiLineString
- Geometry points
- 23
- First coordinate pair
- -2.096490, 53.607712
- Road section segments
- 1
- Road section points
- 23
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.09649,
53.607712
],
[
-2.0964,
53.607748
],
[
-2.09563,
53.60814
],
[
-2.095358,
53.608279
],
[
-2.09486,
53.608558
],
[
-2.094603,
53.60872
],
[
-2.09409,
53.609035
],
[
-2.093532,
53.609413
],
[
-2.093245,
53.609638
],
[
-2.092838,
53.609926
],
[
-2.092717,
53.610034
],
[
-2.09246,
53.610231
],
[
-2.092159,
53.610501
],
[
-2.091993,
53.610663
],
[
-2.09142,
53.611203
],
[
-2.091239,
53.611374
],
[
-2.090997,
53.611644
],
[
-2.090696,
53.611994
],
[
-2.090364,
53.61239
],
[
-2.090184,
53.612631
],
[
-2.09869,
53.606762
],
[
-2.097743,
53.607153
],
[
-2.09649,
53.607712
]
]
]
}
View road section coordinates
[
[
[
-2.09649,
53.607712
],
[
-2.0964,
53.607748
],
[
-2.09563,
53.60814
],
[
-2.095358,
53.608279
],
[
-2.09486,
53.608558
],
[
-2.094603,
53.60872
],
[
-2.09409,
53.609035
],
[
-2.093532,
53.609413
],
[
-2.093245,
53.609638
],
[
-2.092838,
53.609926
],
[
-2.092717,
53.610034
],
[
-2.09246,
53.610231
],
[
-2.092159,
53.610501
],
[
-2.091993,
53.610663
],
[
-2.09142,
53.611203
],
[
-2.091239,
53.611374
],
[
-2.090997,
53.611644
],
[
-2.090696,
53.611994
],
[
-2.090364,
53.61239
],
[
-2.090184,
53.612631
],
[
-2.09869,
53.606762
],
[
-2.097743,
53.607153
],
[
-2.09649,
53.607712
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Wed, Aug 12, 2026 7:45 AM
- Record versioned
- Wed, Aug 12, 2026 9:33 AM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 eastbound Jct 36 to Jct 37 lane 3 and 2 closure ( 158/1 161/3)
Cleared Roadworks National HighwaysExpected to clear in 18 hours 45 minutes
M62 eastbound Jct 36 to Jct 37 lane 3 and 2 closure ( 158/1 161/3)
M62 eastbound Jct 34 to Jct 35 Lane 1 closure (152/7 153/9)
Planned Roadworks National HighwaysStarts in 8 hours 45 minutes
M62 eastbound Jct 34 to Jct 35 Lane 1 closure (152/7 153/9)
M62 eastbound lane 4 closure (MP 70/0 to 75/8)
Planned Roadworks National HighwaysStarts in 8 hours 45 minutes
M62 eastbound lane 4 closure (MP 70/0 to 75/8)
A627M Southbound Lane 2 closure (MP 2/8 to 0/2)
Planned Roadworks National HighwaysStarts in 8 hours 45 minutes
A627M Southbound Lane 2 closure (MP 2/8 to 0/2)
M62 eastbound Jct 22 to Jct 24 Lane 2 and 3 closure (84/7 89/9)
Planned Roadworks National HighwaysStarts in 8 hours 45 minutes
M62 eastbound Jct 22 to Jct 24 Lane 2 and 3 closure (84/7 89/9)
M62 Eastbound hardshoulder closure (MP 69/1 to 70/0)
Cleared Roadworks National HighwaysCleared 2 hours 13 minutes ago
M62 Eastbound hardshoulder closure (MP 69/1 to 70/0)