M62 Eastbound hardshoulder closure (MP 65/6 to 66/0)
ClearedM62 Eastbound hardshoulder closure (MP 65/6 to 66/0)
- Start time
- Thu, Oct 29, 2026 9:00 PM
- Expected end
- Fri, Oct 30, 2026 6:00 AM
- Duration
- 2 seconds
- Road
- M62 – M62 Eastbound Between J20 And J21
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Oct 12, 2026 4:42 PM
- Last updated
- Thu, Oct 29, 2026 8:17 AM
- Cleared
- Thu, Oct 29, 2026 9:00 PM
- Latest update: M62 Eastbound hardshoulder closure (MP 65/6 to 66/0)
- Coordinates
- 53.591463, -2.141455
- Latitude span
- 53.590961 – 53.592343
- Longitude span
- -2.143731 – -2.137534
- Bounding box centre
- 53.591652, -2.140632
- Location descriptions
-
- M62 eastbound between J20 and J21
- Feed validity status
- Planned
- Overall feed start
- Thu, Oct 29, 2026 9:00 PM
- Overall feed end
- Fri, Oct 30, 2026 6:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M62 eastbound between J20 and J21
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {8DBD405A-CB3C-4D38-969F-79FC2E0EB1A5}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 288 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.591425 -2.141609 53.591922 -2.13936 53.592343 -2.137534
Segment 2
4 coordinate pairs- Description
- M62 eastbound between J20 and J21
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {FFE0735D-7667-47E4-A197-B3D855FAFE23}
- Linear Element Type
- A Carriageway
- From Distance
- 588 m
- To Distance
- 738 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.590961 -2.143731 53.591009 -2.143512 53.591154 -2.142832 53.591425 -2.141609
- Geometry type
- MultiLineString
- Geometry points
- 7
- First coordinate pair
- -2.141609, 53.591425
- Road section segments
- 1
- Road section points
- 7
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.141609,
53.591425
],
[
-2.13936,
53.591922
],
[
-2.137534,
53.592343
],
[
-2.143731,
53.590961
],
[
-2.143512,
53.591009
],
[
-2.142832,
53.591154
],
[
-2.141609,
53.591425
]
]
]
}
View road section coordinates
[
[
[
-2.141609,
53.591425
],
[
-2.13936,
53.591922
],
[
-2.137534,
53.592343
],
[
-2.143731,
53.590961
],
[
-2.143512,
53.591009
],
[
-2.142832,
53.591154
],
[
-2.141609,
53.591425
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Oct 12, 2026 4:42 PM
- Record versioned
- Thu, Oct 29, 2026 8:17 AM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 Westbound lanes 2, 3 and 4 closure (MP 27/9 to carriageway closure)
Planned Roadworks National HighwaysExpected to clear in 6 hours 54 minutes
M62 Westbound lanes 2, 3 and 4 closure (MP 27/9 to carriageway closure)
M62 westbound Jct 30 Lane 1 closure (120/1 119/9)
Active Roadworks National HighwaysExpected to clear in 6 hours 54 minutes
M62 westbound Jct 30 Lane 1 closure (120/1 119/9)
M62 eastbound Jct 25 to Jct 26 Lane 1 and 2 closure (95/4 - 96/4)
Active Roadworks National HighwaysExpected to clear in 6 hours 54 minutes
M62 eastbound Jct 25 to Jct 26 Lane 1 and 2 closure (95/4 - 96/4)
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 5 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 eastbound Jct 25 entry slip road lane 1 closure
Cleared Roadworks National HighwaysExpected to clear in 6 hours 54 minutes
M62 eastbound Jct 25 entry slip road lane 1 closure
M62 eastbound Jct 32 exit slip lane 2 closure
Cleared Roadworks National HighwaysCleared 1 hour 46 seconds ago
M62 eastbound Jct 32 exit slip lane 2 closure